If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-155-22802 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.16,"lon":-80.82,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: <County> | |
Municipality: | |
Operator Name: EVERFLOW EASTERN PARTNERS LP | |
Well Pad ID: | |
Farm/Lease Name: FEALKO | |
License Status: Producing | |
License Date: 1985-08-14 | |
Spud Date: 1985-10-06 | |
Spud Drilling Contractor: [[JL COATS [COATS-GOFF]]] | |
Final Drill Date: 1985-10-10 | |
Well Total Depth: 4793.00 ft | |
Configuration: Vertical | |
Latitude: 41.160000 | |
Longitude: -80.820000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
Oil and Gas | 1985-06-14 | Issued Date 6/14/85 Expired Date 6/14/86 Acres 0043655 Tool Type RTA Proposed Formation CLINTON Proposed Depth 00000 Proposed Drill Depth 00000 |
CO | 1985-08-14 | 84 EVERFLOW EASTERN PTNS L P GeoDate 8/14/85 |
Oil and Gas | 1985-08-14 | Issued Date 6/14/85 Expired Date 6/14/86 Acres 0044221 Tool Type RTA Proposed Formation CLINTON Proposed Depth 04793 Proposed Drill Depth 04793 |
Original Spud | 1985-10-06 | R.L. 8-17-85 |
Completed | 1985-10-10 | R.L. 8-17-85 |
Reached Total Depth | 1985-10-10 | R.L. 8-17-85 |
CO | 1985-10-17 | 84 EVERFLOW EASTERN PTNS L P GeoDate 6/14/85 |
Completion Report Received | 1985-10-23 | R.L. 8-17-85 |
Construction Permit Expires | 1986-06-14 | R.L. 8-17-85 |
Record Last Modified | 2017-02-15 | R.L. 8-17-85 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2006-09-11 | 4606 | 4655 | 18 |
4606 | 4655 | 18 | |
4606 | 4655 | 18 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 100000 Gal | 60000 | FRAC;H2O;SAND |
For data sources see[4]
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-379741840 | 2016-12-28 0:00 | UP | No Violations | 1.00 |
0000PL3562 | Preliminary Restoration | No Violations | Preliminary Restoration done information from Data Point | |
0379741840 | 2016-12-28 | UrbanProduction Wells | No Violations
-up inspection will be conducted. The equipment on the site consists of the following:
| |
1361282595 | 2013-02-19 | Production Wells | No Violations | My inspection found the well equipped with a plunger lift unit. The tank battery was surrounded by a weathered dike; however, it meets containment requirements. It contained one, 100 barrel production tank, one, concrete brine tank, and a separator. There was a lock and plug on the load line. The separator had a 7 day production chart. The proper identification sign posted at the tank and wellhead. The lease road was in great condition with crushed limestone. The production records were up to date on our database. |
PL3562 | PL | No Violations |
For data sources see[9]