If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-155-23050 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.24,"lon":-80.89,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Trumbull | |
Municipality: Warren Township | |
Operator Name: CEDAR VALLEY ENERGY INC | |
Well Pad ID: | |
Farm/Lease Name: MEADOWS UNIT | |
License Status: Producing | |
License Date: 1986-12-18 | |
Spud Date: 1986-12-31 | |
Spud Drilling Contractor: DYNAMIC DRILLING | |
Final Drill Date: 1987-01-09 | |
Well Total Depth: 4531.00 ft | |
Configuration: Vertical | |
Latitude: 41.240000 | |
Longitude: -80.890000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
CO | 1986-12-18 | 2037 CEDAR VALLEY ENERGY INC GeoDate 12/18/86 |
Oil and Gas | 1986-12-18 | Issued Date 12/18/86 Expired Date 12/18/87 Acres 0000000 Tool Type RTAF Proposed Formation Proposed Depth 04531 Proposed Drill Depth 04531 |
Original Spud | 1986-12-31 | |
Completed | 1987-01-09 | |
Reached Total Depth | 1987-01-09 | |
Completion Report Received | 1987-02-13 | |
Construction Permit Expires | 1987-12-18 | |
Record Last Modified | 2017-02-15 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
1997-06-29 | 4339 | 4447 | 0 |
4339 | 4447 | 0 | |
2006-09-11 | 4341 | 4441 | 42 |
4341 | 4441 | 42 | |
4339 | 4447 | 0 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 103400 Gal | 68000 | FRAC W/103,400 GAL H20 & 68M# SAND |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
1987 | CEDAR VALLEY ENERGY INC | 15296.00 | 231.00 | 247 |
1988 | CEDAR VALLEY ENERGY INC | 7949.00 | 124.00 | 365 |
1989 | CEDAR VALLEY ENERGY INC | 10778.00 | 79.00 | 365 |
1990 | CEDAR VALLEY ENERGY INC | 9998.00 | 68.00 | 365 |
1991 | CEDAR VALLEY ENERGY INC | 8203.00 | 55.00 | 365 |
1992 | CEDAR VALLEY ENERGY INC | 7408.00 | 50.00 | 365 |
1993 | CEDAR VALLEY ENERGY INC | 6693.00 | 0.00 | 365 |
1994 | CEDAR VALLEY ENERGY INC | 6505.00 | 77.00 | 365 |
1995 | CEDAR VALLEY ENERGY INC | 5121.00 | 0.00 | 365 |
1996 | CEDAR VALLEY ENERGY INC | 5058.00 | 72.00 | 365 |
1997 | CEDAR VALLEY ENERGY INC | 5896.00 | 35.00 | 365 |
1998 | CEDAR VALLEY ENERGY INC | 4146.00 | 0.00 | 365 |
1999 | CEDAR VALLEY ENERGY INC | 4631.00 | 0.00 | 365 |
2000 | CEDAR VALLEY ENERGY INC | 4519.00 | 47.00 | 365 |
2001 | CEDAR VALLEY ENERGY INC | 3931.00 | 0.00 | 365 |
2002 | CEDAR VALLEY ENERGY INC | 3243.00 | 0.00 | 365 |
2003 | CEDAR VALLEY ENERGY INC | 3990.00 | 60.00 | 365 |
2004 | CEDAR VALLEY ENERGY INC | 3830.00 | 0.00 | 365 |
2005 | CEDAR VALLEY ENERGY INC | 4037.00 | 0.00 | 365 |
2006 | CEDAR VALLEY ENERGY INC | 3369.00 | 0.00 | 365 |
2007 | CEDAR VALLEY ENERGY INC | 3106.00 | 0.00 | 365 |
2008 | CEDAR VALLEY ENERGY INC | 2797.00 | 0.00 | 365 |
2009 | CEDAR VALLEY ENERGY INC | 2469.00 | 0.00 | 365 |
2010 | CEDAR VALLEY ENERGY INC | 2687.00 | 57.00 | 365 |
2011 | CEDAR VALLEY ENERGY INC | 2433.00 | 0.00 | 365 |
2012 | CEDAR VALLEY ENERGY INC | 2596.00 | 0.00 | 366 |
2013 | CEDAR VALLEY ENERGY INC | 2281.00 | 0.00 | 365 |
2014 | CEDAR VALLEY ENERGY INC | 2399.00 | 0.00 | 365 |
2015 | CEDAR VALLEY ENERGY INC | 2968.00 | 32.00 | 365 |
2016 | CEDAR VALLEY ENERGY INC | 3199.00 | 0.00 | 365 |
2017 | CEDAR VALLEY ENERGY INC | 3517.00 | 0.00 | 365 |
2018 | CEDAR VALLEY ENERGY INC | 3467.00 | 18.00 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1523861885 | 2015-10-29 0:00 | UP | No Violations | 0.50 |
-315099319 | 2012-8-28 0:00: | UP | No Violations | 0.50 |
-851090489 | 2012-10-25 0:00 | UP | No Violations | 0.50 |
0000PL3376 | Preliminary Restoration | No Violations | Preliminary Restoration done information from Data Point | |
0283704763 | 2016-12-13 | UrbanProduction Wells | No Violations
The equipment on the site consists of the following:
| |
0315099319 | 2012-08-28 | UrbanProduction Wells | No Violations | On 8/28/2012, I conducted an urban production well inspection status check. My inspection found the well equipped with a plunger lift unit (rabbit) that was in good condition. The tank battery contained one 100 barrel oil storage tank, one 50 barrel brine storage tank, a separator, and no identification. I noticed no visible spills or leaks. I called Tim Cosma at 330-853-9565 and was informed a new sign would posted within the week. |
0851090489 | 2012-10-25 | UrbanProduction Wells | No Violations | I conducted an urban production well follow-up compliance notice inspection. My inspection found the wrong permit number posted at the tank battery. I called Tim Cosma at 330-853-9565 and left a message for the correct permit number to be posted. I will re-inspect by 11/05/2012. |
1352294358 | 2012-11-07 | Production Wells | No Violations | My follow-up inspection found the correct permit number on the identification sign. |
1523861885 | 2015-10-29 | UrbanProduction Wells | No Violations | I was on location for a status check. During my inspection, I found the well in production. The well is equipped with a plunger lift assembly. The tank battery consists of a 100 barrel production tank, a 50 barrel brine tank, and a vertical, mechanical separator. There is a dike around the tank battery. An identification sign is posted. The lease road is in stable condition. The well was placed into production prior to House Bill 278. |
283704763 | 2016-12-13 0:00 | UP | No Violations | 0.70 |
PL3376 | PL | No Violations |
For data sources see[9]