If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-155-23080 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.2,"lon":-80.72,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Trumbull | |
Municipality: Weathersfield Township | |
Operator Name: J WELL SERVICE INC | |
Well Pad ID: | |
Farm/Lease Name: CROOKS UNIT | |
License Status: Producing | |
License Date: 1987-03-31 | |
Spud Date: 1987-06-12 | |
Spud Drilling Contractor: [[P&R INC [PEEK & ROWAN]]] | |
Final Drill Date: 1987-06-18 | |
Well Total Depth: 5050.00 ft | |
Configuration: Vertical | |
Latitude: 41.200000 | |
Longitude: -80.720000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
CO | 1987-03-31 | 2651 D & L ENERGY INC GeoDate 3/31/87 |
Oil and Gas | 1987-03-31 | Issued Date 3/31/87 Expired Date 3/30/88 Acres 0040474 Tool Type RTAF Proposed Formation CLINTON Proposed Depth 05050 Proposed Drill Depth 05050 |
Original Spud | 1987-06-12 | CHG. ACG. 11/21/87 |
Completed | 1987-06-18 | CHG. ACG. 11/21/87 |
Reached Total Depth | 1987-06-18 | CHG. ACG. 11/21/87 |
Construction Permit Expires | 1988-03-30 | CHG. ACG. 11/21/87 |
Completion Report Received | 1988-10-31 | CHG. ACG. 11/21/87 |
Change of Owner | 2015-01-27 | Operator changed from 2651, D & L ENERGY INC to 9426, BOBCATE WELL AND PIPELINE LLC |
Record Last Modified | 2017-02-15 | CHG. ACG. 11/21/87 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
1997-06-29 | 4800 | 4908 | 40 |
4800 | 4908 | 40 | |
2006-09-11 | 4890 | 4910 | 0 |
4890 | 4910 | 0 | |
4800 | 4908 | 40 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
ACID | 0 | 1000 Gal | 0 | FRAC: WATER, SAND, ACID | ||
H2O | 0 | 1500 Bbl | 120000 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
1988 | D & L ENERGY INC | 32442.00 | 341.00 | 334 |
1989 | D & L ENERGY INC | 19065.00 | 124.00 | 365 |
1990 | D & L ENERGY INC | 12775.00 | 123.00 | 365 |
1991 | D & L ENERGY INC | 11.00 | 70.00 | 365 |
1992 | D & L ENERGY INC | 7114.00 | 0.00 | 365 |
1993 | D & L ENERGY INC | 8236.00 | 104.00 | 365 |
1994 | D & L ENERGY INC | 8241.00 | 48.00 | 365 |
1995 | D & L ENERGY INC | 7355.00 | 54.00 | 365 |
1996 | D & L ENERGY INC | 6339.00 | 65.00 | 365 |
1997 | D & L ENERGY INC | 5264.00 | 55.00 | 365 |
1998 | D & L ENERGY INC | 3722.00 | 53.00 | 365 |
1999 | D & L ENERGY INC | 4714.00 | 0.00 | 365 |
2000 | D & L ENERGY INC | 5048.00 | 120.00 | 365 |
2001 | D & L ENERGY INC | 4535.00 | 0.00 | 365 |
2002 | D & L ENERGY INC | 4701.00 | 61.00 | 365 |
2003 | D & L ENERGY INC | 4255.00 | 55.00 | 365 |
2004 | D & L ENERGY INC | 3031.00 | 0.00 | 365 |
2005 | D & L ENERGY INC | 4605.00 | 45.00 | 365 |
2006 | D & L ENERGY INC | 2985.00 | 0.00 | 365 |
2007 | D & L ENERGY INC | 3302.00 | 52.00 | 365 |
2008 | D & L ENERGY INC | 3155.00 | 0.00 | 366 |
2009 | D & L ENERGY INC | 4127.00 | 52.00 | 365 |
2010 | D & L ENERGY INC | 4585.00 | 0.00 | 365 |
2011 | D & L ENERGY INC | 4212.00 | 55.00 | 0 |
2012 | D & L ENERGY INC | 3926.00 | 0.00 | 365 |
2013 | D & L ENERGY INC | 3469.00 | 44.00 | 365 |
2014 | D & L ENERGY INC | 3121.00 | 0.00 | 365 |
2015 | BOBCAT WELL & PIPELINE LLC | 1680.00 | 0.00 | 261 |
2016 | BOBCAT WELL & PIPELINE LLC | 28.00 | 0.00 | 5 |
2017 | BOBCAT WELL & PIPELINE LLC | 0.00 | 16.00 | 2 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
1988 | D & L ENERGY INC | Brine | 0 | 334 |
1989 | D & L ENERGY INC | Brine | 65 | 365 |
1990 | D & L ENERGY INC | Brine | 50 | 365 |
1991 | D & L ENERGY INC | Brine | 0 | 365 |
1992 | D & L ENERGY INC | Brine | 0 | 365 |
1993 | D & L ENERGY INC | Brine | 0 | 365 |
1994 | D & L ENERGY INC | Brine | 50 | 365 |
1995 | D & L ENERGY INC | Brine | 50 | 365 |
1996 | D & L ENERGY INC | Brine | 0 | 365 |
1997 | D & L ENERGY INC | Brine | 0 | 365 |
1998 | D & L ENERGY INC | Brine | 27 | 365 |
1999 | D & L ENERGY INC | Brine | 0 | 365 |
2000 | D & L ENERGY INC | Brine | 0 | 365 |
2001 | D & L ENERGY INC | Brine | 0 | 365 |
2002 | D & L ENERGY INC | Brine | 55 | 365 |
2003 | D & L ENERGY INC | Brine | 0 | 365 |
2004 | D & L ENERGY INC | Brine | 0 | 365 |
2005 | D & L ENERGY INC | Brine | 2 | 365 |
2006 | D & L ENERGY INC | Brine | 50 | 365 |
2007 | D & L ENERGY INC | Brine | 4 | 365 |
2008 | D & L ENERGY INC | Brine | 0 | 366 |
2009 | D & L ENERGY INC | Brine | 62 | 365 |
2010 | D & L ENERGY INC | Brine | 0 | 365 |
2011 | D & L ENERGY INC | Brine | 0 | |
2012 | D & L ENERGY INC | Brine | 0 | 365 |
2013 | D & L ENERGY INC | Brine | 50 | 365 |
2014 | D & L ENERGY INC | Brine | 0 | 365 |
2015 | BOBCAT WELL & PIPELINE LLC | Brine | 261 | |
2016 | BOBCAT WELL & PIPELINE LLC | Brine | 0 | 5 |
2017 | BOBCAT WELL & PIPELINE LLC | Brine | 1 | 2 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1224807451 | 2004-6-23 0:00: | PW | No Violations | |
-333194548 | 2007-11-15 0:00 | PW | No Violations | |
0000PL3351 | Preliminary Restoration | No Violations | Preliminary Restoration done information from Data Point | |
0278806471 | 2014-06-16 | UrbanProduction Wells | No Violations | I was on location to perform a follow-up inspection. I found during my inspection that a new dike has not been built per my request. I called Dave Rice and left a message to return call concerning the dike. I received a return call from Rodney of Signature Earth Works. Rodney stated he was contracted by D & L to build the dike. Rodney said the work would begin tomorrow, 6/17/2014. I told Rodney a follow-up inspection would be performed by 6/20/2014. |
0333194548 | 2007-11-15 | Production Wells | No Violations | no violations . |
0633333618 | 2005-07-21 | Production Wells | No Violations | Case# 05-004 , Jean Real . Inspection showed no evidence at surface well or tank battery caused pine trees to die . No violations . RESOLVED . |
0916595337 | 2018-08-13 | Work Over Reconditioning | No Violations | I was on location with Inspector John Fleming, Emergency Operations Manager Andrew Adgate, Dave Rice (Bobcat), Petro Well Oilfield Services (PWS), and CES to observe repairs to the 4.5 production casing. PWS pulled one (1) joint of 1.5 tubing, attached a change over, and ran a joint of 2.375 tubing back in with an R4 packer. The packer was set and the pressure on the casing was mitigated for repairs. The bad section of casing was removed and a competent piece of casing with a collar was installed. The packer was removed and the tubing head was re-installed and the tubing slips and packing were replaced. The gate valve and lubricator were installed and the well is no longer leaking. No violations. |
1055355946 | 2014-06-24 | UrbanProduction Wells | No Violations | I was on location for a follow-up inspection. I found during my inspection that a new dike was built per my request. |
1058806825 | 2014-04-18 | UrbanProduction Wells | No Violations | My inspection found the well in production. The well was equipped with a plunger lift unit. A domestic gas line came off of the 4.5 casing. The tank battery consisted of a 100 barrel production tank, a 50 barrel brine tank and a separator. The dike was weathered and not capable of meeting containment requirements. Identification signs were posted at the production tank. A bull plug was installed on the load line. There was a 16 day production chart inside the separator. The lease road was in stable condition. The well was placed into production prior to House Bill 278. I called Dave Rice and left a message to have a new dike build. |
1130714422 | 2005-07-21 | Production Wells | No Violations | no violations ., |
1224807451 | 2004-06-23 | Production Wells | No Violations | no violations . |
278806471 | 2014-6-16 0:00: | UP | No Violations | 0.50 |
423798936 | 2019-12-2 0:00: | UP | No Violations | |
633333618 | 2005-7-21 0:00: | PW | No Violations | |
916595337 | 2018-8-13 0:00: | WR | No Violations | 5.80 |
PL3351 | PL | No Violations |
For data sources see[9]