If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-155-23221 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.13,"lon":-80.69,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: <County> | |
Municipality: | |
Operator Name: ENERVEST OPERATING LLC | |
Well Pad ID: | |
Farm/Lease Name: DEMSEY | |
License Status: Final Restoration | |
License Date: 2017-12-20 | |
Spud Date: 1988-09-21 | |
Spud Drilling Contractor: CUBBY DRLG | |
Final Drill Date: 1988-09-28 | |
Well Total Depth: 5108.00 ft | |
Configuration: Vertical | |
Latitude: 41.130000 | |
Longitude: -80.690000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
CO | 1988-08-24 | 1702 LOMA ENTERPRISES INC GeoDate 8/24/88 |
Oil and Gas | 1988-08-24 | Issued Date 8/24/88 Expired Date 8/24/89 Acres 0040737 Tool Type RTA Proposed Formation CLINTON Proposed Depth 05108 Proposed Drill Depth 05108 |
Original Spud | 1988-09-21 | UPDATE LOCATION PER DOGRM SURVEYOR, ALE 2/12/18. GMM PLUG STUTUS UPDATED PER PLUG REPORT |
Completed | 1988-09-28 | UPDATE LOCATION PER DOGRM SURVEYOR, ALE 2/12/18. GMM PLUG STUTUS UPDATED PER PLUG REPORT |
Reached Total Depth | 1988-09-28 | UPDATE LOCATION PER DOGRM SURVEYOR, ALE 2/12/18. GMM PLUG STUTUS UPDATED PER PLUG REPORT |
Completion Report Received | 1988-11-14 | UPDATE LOCATION PER DOGRM SURVEYOR, ALE 2/12/18. GMM PLUG STUTUS UPDATED PER PLUG REPORT |
Change of Owner | 1999-10-14 | Operator changed from 1702, LOMA ENTERPRISES INC to 1388, NORTH COAST ENERGY INC |
Change of Owner | 2010-05-06 | Operator changed from 1388, EXCO - NORTH COAST ENERGY INC to 7578, ENERVEST OPERATING LLC |
APP | 2017-12-20 | Proposed Formations:CLINTON SANDS, Issued Date:12/20/2017, Expired Date:12/20/2019 12:00:00 PM, Drilling unit acres:40.737, Proposed Well Type:OG, Proposed Well Class: |
Plugged/Abandoned | 2018-01-25 | UPDATE LOCATION PER DOGRM SURVEYOR, ALE 2/12/18. GMM PLUG STUTUS UPDATED PER PLUG REPORT |
Record Last Modified | 2019-06-05 | UPDATE LOCATION PER DOGRM SURVEYOR, ALE 2/12/18. GMM PLUG STUTUS UPDATED PER PLUG REPORT |
Construction Permit Expires | 2019-12-20 | UPDATE LOCATION PER DOGRM SURVEYOR, ALE 2/12/18. GMM PLUG STUTUS UPDATED PER PLUG REPORT |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2006-09-11 | 4860 | 4908 | 21 |
4860 | 4908 | 21 | |
4860 | 4908 | 21 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 83200 | 60000 | FRAC:WATER/SAND |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
1989 | LOMA ENTERPRISES INC | 7061.00 | 165.00 | 357 |
1991 | LOMA ENTERPRISES INC | 15260.00 | 918.00 | 365 |
1992 | LOMA ENTERPRISES INC | 12717.00 | 574.00 | 365 |
1993 | LOMA ENTERPRISES INC | 10129.00 | 432.00 | 365 |
1994 | LOMA ENTERPRISES INC | 7117.00 | 382.00 | 365 |
1995 | LOMA ENTERPRISES INC | 7036.00 | 287.00 | 365 |
1996 | LOMA ENTERPRISES INC | 6726.00 | 204.00 | 365 |
1997 | LOMA ENTERPRISES INC | 6560.00 | 287.00 | 365 |
1998 | LOMA ENTERPRISES INC | 5749.00 | 156.00 | 365 |
1999 | EXCO - NORTH COAST ENERGY INC | 1602.00 | 0.00 | 91 |
2000 | EXCO - NORTH COAST ENERGY INC | 6330.00 | 131.00 | 365 |
2001 | EXCO - NORTH COAST ENERGY INC | 5782.00 | 75.00 | 365 |
2002 | EXCO - NORTH COAST ENERGY INC | 4827.00 | 64.00 | 365 |
2003 | EXCO - NORTH COAST ENERGY INC | 5827.00 | 145.00 | 365 |
2004 | EXCO - NORTH COAST ENERGY INC | 6011.00 | 115.00 | 365 |
2005 | EXCO - NORTH COAST ENERGY INC | 4681.00 | 156.00 | 365 |
2006 | EXCO - NORTH COAST ENERGY INC | 5144.00 | 62.00 | 365 |
2007 | EXCO - NORTH COAST ENERGY INC | 4602.00 | 116.00 | 365 |
2008 | EXCO - NORTH COAST ENERGY INC | 4540.00 | 71.00 | 366 |
2009 | EXCO - NORTH COAST ENERGY INC | 4059.00 | 75.00 | 365 |
2010 | EXCO - NORTH COAST ENERGY INC | 0.00 | 0.00 | 0 |
2011 | ENERVEST OPERATING LLC | 3850.00 | 129.00 | 0 |
2012 | ENERVEST OPERATING LLC | 4262.00 | 46.00 | 366 |
2013 | ENERVEST OPERATING LLC | 3706.00 | 33.00 | 365 |
2014 | ENERVEST OPERATING LLC | 2932.00 | 57.00 | 365 |
2015 | ENERVEST OPERATING LLC | 1921.00 | 44.00 | 365 |
2016 | ENERVEST OPERATING LLC | 2058.00 | 61.00 | 366 |
2017 | ENERVEST OPERATING LLC | 3194.00 | 123.00 | 365 |
2018 | ENERVEST OPERATING LLC | 271.00 | 0.00 | 211 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1044483337 | 2015-5-21 0:00: | UP | No Violations | 1.00 |
-1387779631 | 2018-1-26 0:00: | PB | No Violations | 4.00 |
-1435745520 | 2018-1-24 0:00: | PB | No Violations | 12.00 |
-1552322645 | 2018-1-23 0:00: | PB | No Violations | |
1044483337 | 2015-05-21 | UrbanProduction Wells | No Violations | I was on location for a follow-up inspection. During my inspection, I found majority of the broken up concrete with the half inch rebar removed. Fill dirt has been spread and compacted over the new 12 inch drainage pipe. Enervest has access to the tank battery and well by driving over the drainage pipe. I will continue to perform inspections while construction is in progress by Vallource. Additional photos were taken and are available upon request. |
1387779631 | 2018-01-26 | Plug / Plug Back | No Violations | Appalachian Well Survey was on location to set a bridge plug at 200 in side of the 8-5/8 casing. Chipco Cementing pumped a 150 cement plug. A cap was welded on the 8-5/8 casing with the ID. |
1432207568 | 2015-05-11 | UrbanProduction Wells | No Violations | I was on location to meet Larry Lower, field supervisor for Enervest, to discuss safety concerns around and at the well and production equipment. According to Mr. Lower, the company Vallource Star has been renovating the Steel Plant property. This construction has created limited access to perform maintenance on the tank battery and well. Mr. Lower stated the production tank has seven foot of oil and they are unable to get close enough to remove the product from the tank. During my inspection, I found:
|
1432300924 | 2015-05-12 | Administrative Inspection | No Violations
I told Vallource Star:
| |
1435745520 | 2018-01-24 | Plug / Plug Back | No Violations | I was with Inspector Shannon Mullins performing the plugging operation on the above location. Chipco Oil Field Svc were the plugging contractor and the Cementing Contractors. We set the Clinton, Big Lime plug and the Surface Plug. |
1516741226 | 2018-01-23 | Plug / Plug Back | No Violations | I was on location to witness the plugging of this well. Chipco, LLC was the contractor for Enervest operating and had pulled the 1.5 inch tubing from the well. A total of 4835 feet of tubing was removed. Chipco removed the seating nipple and downhole equipment, then ran the tubing back into the well to set the bottom plug. Additional joints of tubing were added until a depth of 4968 feet was reached to set the bottom plug. Prior to setting the plug, Chipco pumped 110 BBLs of water downhole and did not break circulation. Water pH was tested at 6 and the temperature was 35 degrees. The plug was set from 4968 to 4603 feet using the 1.5 inch tubing, and the cement was scaled and weighed 15.0 ppg. The well will be left overnight to allow for the cement to setup. No violations observed. |
1552322645 | 2018-01-23 | Plug / Plug Back | No Violations | I was with Inspector Shannon Mullins performing the plugging operation on the above location. Chipco Oil Field Svc were the plugging contractor and the Cementing Contractor. |
1578928769 | 2020-1-13 0:00: | FR | No Violations | 0.50 |
For data sources see[9]