If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-155-23298 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.21,"lon":-80.76,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Trumbull | |
Municipality: Howland Township | |
Operator Name: KLEESE DEVELOPMENT ASSOCIATES | |
Well Pad ID: | |
Farm/Lease Name: MOTORS CERNI | |
License Status: Producing | |
License Date: 1989-08-25 | |
Spud Date: 1990-01-03 | |
Spud Drilling Contractor: [[EPC [EASTERN PETROLEUM]]] | |
Final Drill Date: 1990-01-11 | |
Well Total Depth: 4777.00 ft | |
Configuration: Vertical | |
Latitude: 41.210000 | |
Longitude: -80.760000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
CO | 1989-08-25 | 2655 KLEESE DEVELOPMENT ASSOCS GeoDate 8/25/89 |
Oil and Gas | 1989-08-25 | Issued Date 8/25/89 Expired Date 8/25/90 Acres 0046404 Tool Type RTAF Proposed Formation CLINTON Proposed Depth 04777 Proposed Drill Depth 04777 |
Original Spud | 1990-01-04 | |
Completed | 1990-01-11 | |
Reached Total Depth | 1990-01-11 | |
Construction Permit Expires | 1990-08-25 | |
Completion Report Received | 1991-03-08 | |
Record Last Modified | 2017-02-15 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
1997-06-29 | 4502 | 4638 | 0 |
4502 | 4638 | 0 | |
2006-09-11 | 4533 | 4637 | 23 |
4533 | 4637 | 23 | |
4502 | 4638 | 0 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 91240 Gal | 57500 | FRAC:WATER/SAND |
For data sources see[4]
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-219772998 | 2016-11-29 0:00 | UP | No Violations | 0.50 |
0000PL3242 | Preliminary Restoration | No Violations | Preliminary Restoration done information from Data Point | |
0219772998 | 2016-11-29 | UrbanProduction Wells | No Violations
| |
0666972091 | 2012-10-19 | Production Wells | No Violations | I completed an urban production well inspection status check. My inspection found the well equipped with a plunger lift unit that was in good condition. The tank battery contained one, 100 barrel oil storage tank, one, buried concrete brine storage tank, a separator, and the proper identification. The storage tank hatch was secure. I noticed no visible spills or leaks. The lease road was the parking area behind warehouse. There are no violations at this time. |
1010324805 | 2015-05-08 | UrbanProduction Wells | No Violations | I was on location for a status check. During my inspection, I found the well in production. The well is equipped with a plunger lift assembly. The tank battery consists of a 100 barrel production tank and a mechanical separator. An identification sign is posted on the tank. The dike around the tank battery is completely weathered. I observed a ditch right next to the tank battery on the west side. I called and spoke with Matt Kleese, manager of Kleese Development Assoc. I instructed Mr. Kleese to build a new dike around the tank battery. A follow-up inspection will be conducted by 5/22/2015. |
1399920441 | 2019-12-18 0:00 | UP | No Violations | |
1436182667 | 2015-06-22 | UrbanProduction Wells | No Violations | I was on location for a follow-up inspection. During my inspection, I found a new dike built per my request. KDA replaced the 100 barrel production tank with a 50 barrel tank. |
666972091 | 2012-10-19 0:00 | PW | No Violations | 0.50 |
PL3242 | PL | No Violations |
For data sources see[9]