If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-155-23412 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.23,"lon":-80.81,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: <County> | |
Municipality: | |
Operator Name: EVERFLOW EASTERN PARTNERS LP | |
Well Pad ID: | |
Farm/Lease Name: NEFF UNIT | |
License Status: Producing | |
License Date: 1991-07-11 | |
Spud Date: 1991-07-31 | |
Spud Drilling Contractor: [[JL COATS [COATS-GOFF]]] | |
Final Drill Date: 1991-08-06 | |
Well Total Depth: 4662.00 ft | |
Configuration: Vertical | |
Latitude: 41.230000 | |
Longitude: -80.810000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
CO | 1991-07-11 | 84 EVERFLOW EASTERN PTNS L P GeoDate 7/11/91 |
Oil and Gas | 1991-07-11 | Issued Date 7/11/91 Expired Date 7/10/92 Acres 0040348 Tool Type RTAF Proposed Formation CLINTON Proposed Depth 04662 Proposed Drill Depth 04662 |
Original Spud | 1991-08-01 | 3-9-98---CHANGE IN DRILL UNIT ONLY FROM 40.348 AC TO 40 AC. |
Completed | 1991-08-06 | 3-9-98---CHANGE IN DRILL UNIT ONLY FROM 40.348 AC TO 40 AC. |
Reached Total Depth | 1991-08-06 | 3-9-98---CHANGE IN DRILL UNIT ONLY FROM 40.348 AC TO 40 AC. |
Completion Report Received | 1991-09-09 | 3-9-98---CHANGE IN DRILL UNIT ONLY FROM 40.348 AC TO 40 AC. |
Construction Permit Expires | 1992-07-10 | 3-9-98---CHANGE IN DRILL UNIT ONLY FROM 40.348 AC TO 40 AC. |
Record Last Modified | 2019-06-14 | 3-9-98---CHANGE IN DRILL UNIT ONLY FROM 40.348 AC TO 40 AC. |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
1997-06-29 | 4405 | 4534 | 0 |
4405 | 4534 | 0 | |
2006-09-11 | 4407 | 4534 | 60 |
4407 | 4534 | 60 | |
4405 | 4534 | 0 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 120000 Gal | 80000 | FRAC W/120M GAL H20 & 80M# SAND |
For data sources see[4]
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0000004912 | Preliminary Restoration | No Violations | PASSED Y WITNESSED 4/22/92 INSPECTOR KEITH WHITE DATE 04/2219/92 DATA FROM OLD VAX INFO | |
1540098152 | 2015-11-10 | UrbanProduction Wells | No Violations | I was on location for a status check. During my inspection, I found the well in production. The well is equipped with a plunger lift assembly. The tank battery consists of a 100 barrel production tank, a 50 barrel brine tank, and a mechanical separator. There is a dike around the tank battery. Identification signs were posted at the well and tank battery. There are locked, chain link fences around the tank battery and well. A plug is installed on the load line. The lease road is in stable condition. The well was placed into production prior to House Bill 278. |
1877207271 | 2013-02-05 | UrbanProduction Wells | No Violations | My inspection found the well equipped with a plunger lift unit. It was surrounded by a locked chain link fence and evergreens. The proper identification sign was posted. The tank battery was surrounded by a locked chain link fence and evergreens. It contained one, 100 barrel production tank, one, 50 barrel brine tank, and a separator. There was a plug on the load line. The separator had a 7 day production chart. The production records were up to date in our database. This well was placed into production prior to House Bill 278. The lease road was part of Diane Sawyer Chevrolets property. |
2043114756 | 2020-2-7 0:00:0 | UP | No Violations | 0.50 |
4912 | PL | No Violations |
For data sources see[9]