X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-155-23415

Well Details

Well ID: 34-155-23415
Loading map...
Country: United States
State: Ohio
County: <County>
Municipality:
Operator Name: EVERFLOW EASTERN PARTNERS LP
Well Pad ID:
Farm/Lease Name: FIRST ASSEMBLY OF GOD UNIT
License Status: Producing
License Date: 1991-12-02
Spud Date: 1991-08-10
Spud Drilling Contractor: CUBBY DRLG
Final Drill Date: 1991-08-15
Well Total Depth: 4702.00 ft
Configuration: Directional
Latitude: 41.250000
Longitude: -80.850000

For data sources see[1]

Well History

Well Status Well Status Date Comment
CO 1991-07-22 84 EVERFLOW EASTERN PTNS L P GeoDate 7/22/91
Oil and Gas 1991-07-22 Issued Date 7/22/91 Expired Date 7/21/92 Acres 0040088 Tool Type RTAF Proposed Formation CLINTON Proposed Depth 04702 Proposed Drill Depth 04702
Original Spud 1991-08-10 CHG FTG & XY 7-4-92
Completed 1991-08-15 CHG FTG & XY 7-4-92
Reached Total Depth 1991-08-15 CHG FTG & XY 7-4-92
Completion Report Received 1991-09-09 CHG FTG & XY 7-4-92
CO 1991-12-02 84 EVERFLOW EASTERN PTNS L P GeoDate 12/2/91
Oil and Gas 1991-12-02 Issued Date 12/2/91 Expired Date 12/1/92 Acres 0040088 Tool Type RTAF Proposed Formation CLINTON Proposed Depth 00000 Proposed Drill Depth 00000
Construction Permit Expires 1992-12-01 CHG FTG & XY 7-4-92
Record Last Modified 2017-02-15 CHG FTG & XY 7-4-92

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
1997-06-29 4366 4512 0
4366 4512 0
2006-09-11 4398 4456 55
4398 4456 55
4366 4512 0

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 0 121380 Gal 80000 FRAC W/121,380 GAL WATER AND 80M#

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
1991 EVERFLOW EASTERN PARTNERS LP 0.00 0.00 365
1992 EVERFLOW EASTERN PARTNERS LP 5576.00 69.00 31
1993 EVERFLOW EASTERN PARTNERS LP 55427.00 376.00 365
1994 EVERFLOW EASTERN PARTNERS LP 41538.00 84.00 365
1995 EVERFLOW EASTERN PARTNERS LP 34657.00 82.00 365
1996 EVERFLOW EASTERN PARTNERS LP 31970.00 59.00 365
1997 EVERFLOW EASTERN PARTNERS LP 27212.00 29.00 365
1998 EVERFLOW EASTERN PARTNERS LP 24960.00 42.00 365
1999 EVERFLOW EASTERN PARTNERS LP 24107.00 58.00 365
2000 EVERFLOW EASTERN PARTNERS LP 22913.00 0.00 365
2001 EVERFLOW EASTERN PARTNERS LP 19667.00 0.00 365
2002 EVERFLOW EASTERN PARTNERS LP 16786.00 0.00 365
2003 EVERFLOW EASTERN PARTNERS LP 17712.00 71.00 365
2004 EVERFLOW EASTERN PARTNERS LP 14603.00 0.00 365
2005 EVERFLOW EASTERN PARTNERS LP 14524.00 0.00 365
2006 EVERFLOW EASTERN PARTNERS LP 10171.00 0.00 365
2007 EVERFLOW EASTERN PARTNERS LP 11904.00 31.00 365
2008 EVERFLOW EASTERN PARTNERS LP 10875.00 0.00 365
2009 EVERFLOW EASTERN PARTNERS LP 11352.00 0.00 365
2010 EVERFLOW EASTERN PARTNERS LP 11736.00 0.00 365
2011 EVERFLOW EASTERN PARTNERS LP 11530.00 0.00 365
2012 EVERFLOW EASTERN PARTNERS LP 11386.00 40.00 366
2013 EVERFLOW EASTERN PARTNERS LP 10039.00 15.00 365
2014 EVERFLOW EASTERN PARTNERS LP 9650.00 0.00 365
2015 EVERFLOW EASTERN PARTNERS LP 9327.00 0.00 365
2016 EVERFLOW EASTERN PARTNERS LP 8908.00 0.00 365
2017 EVERFLOW EASTERN PARTNERS LP 6633.00 0.00 365
2018 EVERFLOW EASTERN PARTNERS LP 6903.00 18.00 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
1991 EVERFLOW EASTERN PARTNERS LP Brine 0 365
1992 EVERFLOW EASTERN PARTNERS LP Brine 0 31
1993 EVERFLOW EASTERN PARTNERS LP Brine 86 365
1994 EVERFLOW EASTERN PARTNERS LP Brine 7 365
1995 EVERFLOW EASTERN PARTNERS LP Brine 51 365
1996 EVERFLOW EASTERN PARTNERS LP Brine 16 365
1997 EVERFLOW EASTERN PARTNERS LP Brine 0 365
1998 EVERFLOW EASTERN PARTNERS LP Brine 0 365
1999 EVERFLOW EASTERN PARTNERS LP Brine 30 365
2000 EVERFLOW EASTERN PARTNERS LP Brine 0 365
2001 EVERFLOW EASTERN PARTNERS LP Brine 0 365
2002 EVERFLOW EASTERN PARTNERS LP Brine 0 365
2003 EVERFLOW EASTERN PARTNERS LP Brine 0 365
2004 EVERFLOW EASTERN PARTNERS LP Brine 0 365
2005 EVERFLOW EASTERN PARTNERS LP Brine 0 365
2006 EVERFLOW EASTERN PARTNERS LP Brine 0 365
2007 EVERFLOW EASTERN PARTNERS LP Brine 0 365
2008 EVERFLOW EASTERN PARTNERS LP Brine 0 365
2009 EVERFLOW EASTERN PARTNERS LP Brine 0 365
2010 EVERFLOW EASTERN PARTNERS LP Brine 0 365
2011 EVERFLOW EASTERN PARTNERS LP Brine 0 365
2012 EVERFLOW EASTERN PARTNERS LP Brine 15 366
2013 EVERFLOW EASTERN PARTNERS LP Brine 0 365
2014 EVERFLOW EASTERN PARTNERS LP Brine 0 365
2015 EVERFLOW EASTERN PARTNERS LP Brine 0 365
2016 EVERFLOW EASTERN PARTNERS LP Brine 0 365
2017 EVERFLOW EASTERN PARTNERS LP Brine 0 365
2018 EVERFLOW EASTERN PARTNERS LP Brine 12 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
0000016690 Preliminary Restoration No Violations PASSED Y WITNESSED 4/21/92 INSPECTOR KEITH WHITE DATE 04/2119/92 DATA FROM OLD VAX INFO
0867328244 2003-07-25 Preliminary Restoration No Violations Meets requirements. The tank battery consists of 2-100 bbl storage tanks, 1-50 bbl salt water tank, 2-separators, diked and fenced. The tank battery is shared wth the #2D-3583.
1351686771 2012-10-31 UrbanProduction Wells No Violations I completed an urban production well inspection status check. My inspection found the well equipped with a plunger lift unit surrounded by a chain link fence with the proper identification. The tank battery was surrounded by a chain link fence with slats, a dike, and contained two, 100 barrel oil storage tanks, one, 50 barrel brine storage tank, two separators, and the proper identification. I noticed no visible spills or leaks. The lease road and tank battery was shared by 2-3583. There are no violations at this time.
1640725863 2015-02-24 UrbanProduction Wells No Violations I was on location for a status check. During my inspection, I found the well in production. The well was equipped with a plunger lift assembly. The tank battery consisted of two, 100 barrel production tanks, a 50 barrel brine tank and two, mechanical separators. A dike surrounded the tank battery. Identification signs were posted at the well and tank battery. There were plugs on the load lines. Locked, chain link fences with slats surrounded the tank battery and well. The lease road was part of the paved parking lot for the church. The well was placed into production prior to House Bill 278.
16690 PL No Violations
867328244 2003-7-25 0:00: PL No Violations 0.50

For data sources see[9]

References