If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-155-23557 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.25,"lon":-80.75,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Trumbull | |
Municipality: Howland Township | |
Operator Name: J WELL SERVICE INC | |
Well Pad ID: | |
Farm/Lease Name: HOWLAND REALTY/ANDERSON | |
License Status: Producing | |
License Date: 1994-04-15 | |
Spud Date: 1994-08-21 | |
Spud Drilling Contractor: MOHAWK DRLG | |
Final Drill Date: 1994-08-27 | |
Well Total Depth: 4700.00 ft | |
Configuration: Vertical | |
Latitude: 41.250000 | |
Longitude: -80.750000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
CO | 1994-04-15 | 2651 D & L ENERGY INC GeoDate 4/15/94 |
Oil and Gas | 1994-04-15 | Issued Date 4/15/94 Expired Date 4/15/95 Acres 0042370 Tool Type RTAF Proposed Formation CLINTON Proposed Depth 04700 Proposed Drill Depth 04700 |
Original Spud | 1994-08-21 | |
Completed | 1994-08-27 | |
Reached Total Depth | 1994-08-27 | |
Completion Report Received | 1994-09-08 | |
Construction Permit Expires | 1995-04-15 | |
Change of Owner | 2015-01-27 | Operator changed from 2651, D & L ENERGY INC to 9426, BOBCATE WELL AND PIPELINE LLC |
Record Last Modified | 2017-02-15 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2006-09-11 | 4417 | 4480 | 39 |
4396 | 4532 | 0 | |
1997-06-29 | 4396 | 4532 | 0 |
4417 | 4480 | 39 | |
4396 | 4532 | 0 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 75000 Gal | 60000 | FRAC W/75M GAL H20 & 60M# SAND | ||
ACID | 8 | 500 Gal | 0 | 7 1/2% FE |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
1994 | D & L ENERGY INC | 816.00 | 785.00 | 109 |
1995 | D & L ENERGY INC | 10949.00 | 1209.00 | 365 |
1996 | D & L ENERGY INC | 5984.00 | 631.00 | 365 |
1997 | D & L ENERGY INC | 4995.00 | 510.00 | 365 |
1998 | D & L ENERGY INC | 4526.00 | 306.00 | 365 |
1999 | D & L ENERGY INC | 3885.00 | 256.00 | 365 |
2000 | D & L ENERGY INC | 3788.00 | 226.00 | 365 |
2001 | D & L ENERGY INC | 2133.00 | 192.00 | 365 |
2002 | D & L ENERGY INC | 3108.00 | 76.00 | 365 |
2003 | D & L ENERGY INC | 2810.00 | 110.00 | 365 |
2004 | D & L ENERGY INC | 2373.00 | 228.00 | 365 |
2005 | D & L ENERGY INC | 2278.00 | 187.00 | 365 |
2006 | D & L ENERGY INC | 2432.00 | 129.00 | 365 |
2007 | D & L ENERGY INC | 2285.00 | 130.00 | 365 |
2008 | D & L ENERGY INC | 2289.00 | 115.00 | 366 |
2009 | D & L ENERGY INC | 2257.00 | 133.00 | 365 |
2010 | D & L ENERGY INC | 2401.00 | 55.00 | 365 |
2011 | D & L ENERGY INC | 2189.00 | 129.00 | 0 |
2012 | D & L ENERGY INC | 2058.00 | 0.00 | 365 |
2013 | D & L ENERGY INC | 2740.00 | 125.00 | 365 |
2014 | D & L ENERGY INC | 2344.00 | 101.00 | 365 |
2015 | BOBCAT WELL & PIPELINE LLC | 2295.00 | 114.00 | 365 |
2016 | BOBCAT WELL & PIPELINE LLC | 1376.00 | 0.00 | 108 |
2017 | BOBCAT WELL & PIPELINE LLC | 3209.00 | 214.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
1994 | D & L ENERGY INC | Brine | 160 | 109 |
1995 | D & L ENERGY INC | Brine | 108 | 365 |
1996 | D & L ENERGY INC | Brine | 13 | 365 |
1997 | D & L ENERGY INC | Brine | 43 | 365 |
1998 | D & L ENERGY INC | Brine | 31 | 365 |
1999 | D & L ENERGY INC | Brine | 11 | 365 |
2000 | D & L ENERGY INC | Brine | 0 | 365 |
2001 | D & L ENERGY INC | Brine | 0 | 365 |
2002 | D & L ENERGY INC | Brine | 0 | 365 |
2003 | D & L ENERGY INC | Brine | 0 | 365 |
2004 | D & L ENERGY INC | Brine | 0 | 365 |
2005 | D & L ENERGY INC | Brine | 0 | 365 |
2006 | D & L ENERGY INC | Brine | 0 | 365 |
2007 | D & L ENERGY INC | Brine | 0 | 365 |
2008 | D & L ENERGY INC | Brine | 0 | 366 |
2009 | D & L ENERGY INC | Brine | 0 | 365 |
2010 | D & L ENERGY INC | Brine | 28 | 365 |
2011 | D & L ENERGY INC | Brine | 3 | |
2012 | D & L ENERGY INC | Brine | 55 | 365 |
2013 | D & L ENERGY INC | Brine | 5 | 365 |
2014 | D & L ENERGY INC | Brine | 16 | 365 |
2015 | BOBCAT WELL & PIPELINE LLC | Brine | 17 | 365 |
2016 | BOBCAT WELL & PIPELINE LLC | Brine | 0 | 108 |
2017 | BOBCAT WELL & PIPELINE LLC | Brine | 30 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1162699488 | 2014-7-31 0:00: | UP | No Violations | 0.50 |
-288260943 | 2017-10-12 0:00 | UP | No Violations | 0.40 |
0288260943 | 2017-10-12 | UrbanProduction Wells | No Violations
-up lines are secure with plugs. The locked chain link fence around the tank battery is leaning in on the east side. There is a chart box and 7 day chart dated 10/6/17 inside of the separator. The access road is in good repair with a closed gate and identification sign. I spoke with Dave Rick from Bobcat. Mr. Rice stated he would fix the fencing and move the identification sign from the gate to the tank battery. Equipment on site:
| |
1162699488 | 2014-07-31 | UrbanProduction Wells | No Violations | I was on location for a status check. I found during my inspection the well in production with a plunger lift unit. The tank battery consisted of a 100 barrel production tank, a 50 barrel brine tank and separator. There was a dike around the production equipment. A identification sign was posted. A plug was placed in the load line. The lease road was in stable condition with a locked gate at the entrance. The well was placed into production prior to House Bill 278. |
1767160106 | 2004-02-24 | Preliminary Restoration | No Violations | Restoration approved . |
For data sources see[9]