If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-155-23663 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.17,"lon":-80.77,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Trumbull | |
Municipality: Weathersfield Township | |
Operator Name: BOBCAT WELL & PIPELINE LLC | |
Well Pad ID: | |
Farm/Lease Name: PARKER UNIT | |
License Status: Producing | |
License Date: 1997-09-25 | |
Spud Date: 1997-10-27 | |
Spud Drilling Contractor: MOHAWK DRLG | |
Final Drill Date: 1997-11-03 | |
Well Total Depth: 4801.00 ft | |
Configuration: Vertical | |
Latitude: 41.170000 | |
Longitude: -80.770000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 1997-09-25 | Proposed Formations:CLINTON, Issued Date:9/25/97, Expired Date:9/25/98 6:00:00 AM, Drilling unit acres:41.58, Proposed Well Type:OG, Proposed Well Class:POOL |
Original Spud | 1997-10-27 | RBDMS Rec |
Completed | 1997-11-03 | RBDMS Rec |
Reached Total Depth | 1997-11-03 | RBDMS Rec |
Completion Report Received | 1998-02-27 | RBDMS Rec |
Construction Permit Expires | 1998-09-25 | RBDMS Rec |
Change of Owner | 2015-01-27 | Operator changed from 2651, D & L ENERGY INC to 9426, BOBCATE WELL AND PIPELINE LLC |
Record Last Modified | 2017-02-15 | RBDMS Rec |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
1998-05-12 | 4654 | 4730 | 45 |
4654 | 4730 | 45 | |
4654 | 4730 | 45 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 7 | 2381 Bbl | 80000 | 500 GALLONS FE ACID |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
1998 | D & L ENERGY INC | 11423.00 | 335.00 | 365 |
1999 | D & L ENERGY INC | 33922.00 | 358.00 | 365 |
2000 | D & L ENERGY INC | 16045.00 | 109.00 | 365 |
2001 | D & L ENERGY INC | 6229.00 | 0.00 | 365 |
2002 | D & L ENERGY INC | 7386.00 | 48.00 | 365 |
2003 | D & L ENERGY INC | 7602.00 | 60.00 | 365 |
2004 | D & L ENERGY INC | 5666.00 | 0.00 | 365 |
2005 | D & L ENERGY INC | 12265.00 | 138.00 | 365 |
2006 | D & L ENERGY INC | 10146.00 | 141.00 | 365 |
2007 | D & L ENERGY INC | 8337.00 | 125.00 | 365 |
2008 | D & L ENERGY INC | 9646.00 | 72.00 | 366 |
2009 | D & L ENERGY INC | 10805.00 | 96.00 | 365 |
2010 | D & L ENERGY INC | 9616.00 | 0.00 | 365 |
2011 | D & L ENERGY INC | 8246.00 | 55.00 | 0 |
2012 | D & L ENERGY INC | 6966.00 | 0.00 | 365 |
2013 | D & L ENERGY INC | 6796.00 | 93.00 | 365 |
2014 | D & L ENERGY INC | 5138.00 | 0.00 | 365 |
2015 | BOBCAT WELL & PIPELINE LLC | 3631.00 | 0.00 | 345 |
2016 | BOBCAT WELL & PIPELINE LLC | 5834.00 | 0.00 | 347 |
2017 | BOBCAT WELL & PIPELINE LLC | 4192.00 | 37.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
1998 | D & L ENERGY INC | Brine | 129 | 365 |
1999 | D & L ENERGY INC | Brine | 115 | 365 |
2000 | D & L ENERGY INC | Brine | 0 | 365 |
2001 | D & L ENERGY INC | Brine | 0 | 365 |
2002 | D & L ENERGY INC | Brine | 0 | 365 |
2003 | D & L ENERGY INC | Brine | 0 | 365 |
2004 | D & L ENERGY INC | Brine | 0 | 365 |
2005 | D & L ENERGY INC | Brine | 0 | 365 |
2006 | D & L ENERGY INC | Brine | 0 | 365 |
2007 | D & L ENERGY INC | Brine | 0 | 365 |
2008 | D & L ENERGY INC | Brine | 0 | 366 |
2009 | D & L ENERGY INC | Brine | 0 | 365 |
2010 | D & L ENERGY INC | Brine | 51 | 365 |
2011 | D & L ENERGY INC | Brine | 0 | |
2012 | D & L ENERGY INC | Brine | 0 | 365 |
2013 | D & L ENERGY INC | Brine | 0 | 365 |
2014 | D & L ENERGY INC | Brine | 0 | 365 |
2015 | BOBCAT WELL & PIPELINE LLC | Brine | 345 | |
2016 | BOBCAT WELL & PIPELINE LLC | Brine | 0 | 347 |
2017 | BOBCAT WELL & PIPELINE LLC | Brine | 1 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1670884349 | 2013-9-16 0:00: | UP | No Violations | 1.00 |
1209763456 | 2004-03-08 | Preliminary Restoration | No Violations | Restoration approved . |
1670884349 | 2013-09-16 | UrbanProduction Wells | No Violations | My inspection found the well in production. The well was equipped with a plunger lift unit and a domestic gas line. A wooden fence surrounded the well. The fence was missing wooden slats and the gate was off the hinge. The tank battery contained a 100 barrel production tank, a 50 barrel brine tank, and a separator. There were plugs on the load lines. The dike was slightly weathered; however, it meets containment requirements. The wooden fence surrounding the tank battery was missing a panel. There were no locks on the fences. The proper identification sign was posted. The lease road was in good condition. The well tender was on location. I told the well tender to install locks and repair the wooden fences at the tank battery and well. |
For data sources see[9]