If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-155-23696 | ![]() Sorry, we have no imagery here. Sorry, we have no imagery here. ![]() |
Country: United States | |
State: Ohio | |
County: Trumbull | |
Municipality: Liberty Township | |
Operator Name: EVERFLOW EASTERN PARTNERS LP | |
Well Pad ID: | |
Farm/Lease Name: JUBILEE URBAN RENEWAL | |
License Status: Producing | |
License Date: 2000-06-12 | |
Spud Date: 2000-09-28 | |
Spud Drilling Contractor: ADVENT DRLG | |
Final Drill Date: 2000-10-05 | |
Well Total Depth: 5124.00 ft | |
Configuration: Vertical | |
Latitude: 41.180000 | |
Longitude: -80.680000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 1999-06-30 | Proposed Formations:CLINTON, Issued Date:6/30/99, Expired Date:6/29/00 6:00:00 AM, Drilling unit acres:44.88, Proposed Well Type:OG, Proposed Well Class:POOL |
APP | 2000-06-12 | Proposed Formations:CLINTON, Issued Date:6/12/00, Expired Date:6/12/01 6:00:00 AM, Drilling unit acres:44.88, Proposed Well Type:OG, Proposed Well Class:POOL |
Original Spud | 2000-09-28 | RBDMS Rec |
Completed | 2000-10-05 | RBDMS Rec |
Reached Total Depth | 2000-10-05 | RBDMS Rec |
Construction Permit Expires | 2001-06-12 | RBDMS Rec |
Completion Report Received | 2003-02-19 | RBDMS Rec |
Change of Owner | 2003-10-17 | Operator changed from 2651, D & L ENERGY INC to 84, EVERFLOW EASTERN PTNS L P |
Record Last Modified | 2017-02-15 | RBDMS Rec |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2003-04-17 | 4932 | 4975 | 75 |
4932 | 4975 | 75 | |
4932 | 4975 | 75 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 7 | 90000 Gal | 70000 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2001 | D & L ENERGY INC | 8572.00 | 688.00 | 365 |
2002 | D & L ENERGY INC | 10260.00 | 327.00 | 365 |
2003 | D & L ENERGY INC | 9948.00 | 244.00 | 365 |
2004 | EVERFLOW EASTERN PARTNERS LP | 7496.00 | 176.00 | 365 |
2005 | EVERFLOW EASTERN PARTNERS LP | 7114.00 | 177.00 | 365 |
2006 | EVERFLOW EASTERN PARTNERS LP | 5846.00 | 199.00 | 365 |
2007 | EVERFLOW EASTERN PARTNERS LP | 5617.00 | 117.00 | 365 |
2008 | EVERFLOW EASTERN PARTNERS LP | 5007.00 | 119.00 | 365 |
2009 | EVERFLOW EASTERN PARTNERS LP | 4582.00 | 60.00 | 365 |
2010 | EVERFLOW EASTERN PARTNERS LP | 3912.00 | 71.00 | 365 |
2011 | EVERFLOW EASTERN PARTNERS LP | 3980.00 | 107.00 | 365 |
2012 | EVERFLOW EASTERN PARTNERS LP | 3446.00 | 55.00 | 366 |
2013 | EVERFLOW EASTERN PARTNERS LP | 3194.00 | 67.00 | 365 |
2014 | EVERFLOW EASTERN PARTNERS LP | 3049.00 | 66.00 | 365 |
2015 | EVERFLOW EASTERN PARTNERS LP | 2678.00 | 81.00 | 365 |
2016 | EVERFLOW EASTERN PARTNERS LP | 2538.00 | 0.00 | 365 |
2017 | EVERFLOW EASTERN PARTNERS LP | 2843.00 | 71.00 | 365 |
2018 | EVERFLOW EASTERN PARTNERS LP | 2597.00 | 82.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2001 | D & L ENERGY INC | Brine | 415 | 365 |
2002 | D & L ENERGY INC | Brine | 59 | 365 |
2003 | D & L ENERGY INC | Brine | 39 | 365 |
2004 | EVERFLOW EASTERN PARTNERS LP | Brine | 25 | 365 |
2005 | EVERFLOW EASTERN PARTNERS LP | Brine | 0 | 365 |
2006 | EVERFLOW EASTERN PARTNERS LP | Brine | 68 | 365 |
2007 | EVERFLOW EASTERN PARTNERS LP | Brine | 24 | 365 |
2008 | EVERFLOW EASTERN PARTNERS LP | Brine | 28 | 365 |
2009 | EVERFLOW EASTERN PARTNERS LP | Brine | 0 | 365 |
2010 | EVERFLOW EASTERN PARTNERS LP | Brine | 32 | 365 |
2011 | EVERFLOW EASTERN PARTNERS LP | Brine | 0 | 365 |
2012 | EVERFLOW EASTERN PARTNERS LP | Brine | 0 | 366 |
2013 | EVERFLOW EASTERN PARTNERS LP | Brine | 41 | 365 |
2014 | EVERFLOW EASTERN PARTNERS LP | Brine | 0 | 365 |
2015 | EVERFLOW EASTERN PARTNERS LP | Brine | 0 | 365 |
2016 | EVERFLOW EASTERN PARTNERS LP | Brine | 0 | 365 |
2017 | EVERFLOW EASTERN PARTNERS LP | Brine | 38 | 365 |
2018 | EVERFLOW EASTERN PARTNERS LP | Brine | 35 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1290654256 | 2004-3-4 0:00:0 | PL | No Violations | |
-679551630 | 2015-11-23 0:00 | UP | No Violations | 0.50 |
0679551630 | 2015-11-23 | UrbanProduction Wells | No Violations | I was on location for a status check. During my inspection, I found the well in production. The well is equipped with a plunger lift assembly. There is a chain link fence around the well. The tank battery consists of a 100 barrel production tank, a 50 barrel brine tank, and a mechanical separator. There is a dike around the tank battery. An identification sign is posted at the well and tank battery. The lease road is in stable condition. |
1290654256 | 2004-03-04 | Preliminary Restoration | No Violations | Restoration approved . |
1749579071 | 2013-06-05 | UrbanProduction Wells | No Violations | My inspection found the well in production. The well was equipped with a plunger lift unit. It was surrounded by a chain link fence with no lock. The tank battery contained one, 100 barrel production tank, one, 50 barrel brine tank, and a separator. A dike capable of meeting containment requirements surrounded the tank battery. There were plugs on the 4 and 2 load lines. A 7 day production chart was in the separator. The proper identification signs were posted at the wellhead and tank battery. The lease road was in good condition. This well was placed into production prior to House Bill 278. |
For data sources see[9]