If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-155-23728 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.3,"lon":-80.75,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Trumbull | |
Municipality: Bazetta Township | |
Operator Name: SOUND ENERGY CO INC | |
Well Pad ID: | |
Farm/Lease Name: DANN-DEAN # 2-D | |
License Status: Producing | |
License Date: 2000-10-02 | |
Spud Date: 2001-04-16 | |
Spud Drilling Contractor: ADVENT DRLG | |
Final Drill Date: 2001-04-23 | |
Well Total Depth: 4782.00 ft | |
Configuration: Directional | |
Latitude: 41.300000 | |
Longitude: -80.750000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2000-10-02 | 2911 WEINSZ OIL & GAS INC Proposed Formation CLINTON Issued Date 10/2/00 Expired Date 10/2/01 6:00:00 AM |
Original Spud | 2001-04-16 | RBDMS Rec |
Completed | 2001-04-23 | RBDMS Rec |
Reached Total Depth | 2001-04-23 | RBDMS Rec |
Completion Report Received | 2001-07-02 | RBDMS Rec |
Correction to Well | 2001-07-20 | CHANGE IN TARGET INFORMATION: 607'SL & 1217'EL OF LOT 55; X= 2,479,398; Y= 600,809; CHANGE IN DRILL UNIT SIZE TO 80 ACRES (SOURCE OF LOCATION: AS DRILLED PLAT) |
Construction Permit Expires | 2001-10-02 | RBDMS Rec |
Change of Owner | 2004-05-06 | Operator changed from 2911, WEINSZ OIL & GAS INC to 7626, M & M ROYALTY LTD |
Change of Owner | 2015-05-12 | Operator changed from 7626, M & M ROYALTY LTD to 4327, SOUND ENERGY CO INC |
Record Last Modified | 2017-02-15 | RBDMS Rec |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2001-09-10 | 4540 | 4667 | 0 |
4540 | 4667 | 0 | |
4540 | 4667 | 0 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 2100 Bbl | 60000 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2001 | WEINSZ OIL & GAS INC | 13748.00 | 201.00 | 178 |
2002 | WEINSZ OIL & GAS INC | 35392.00 | 75.00 | 365 |
2003 | WEINSZ OIL & GAS INC | 3739.00 | 0.00 | 365 |
2004 | M & M ROYALTY LTD | 2509.00 | 0.00 | 365 |
2005 | M & M ROYALTY LTD | 19222.00 | 45.00 | 365 |
2006 | M & M ROYALTY LTD | 16381.00 | 0.00 | 365 |
2007 | M & M ROYALTY LTD | 16191.00 | 65.00 | 365 |
2008 | M & M ROYALTY LTD | 15236.00 | 45.00 | 365 |
2009 | M & M ROYALTY LTD | 13743.00 | 0.00 | 365 |
2010 | M & M ROYALTY LTD | 13021.00 | 0.00 | 365 |
2011 | M & M ROYALTY LTD | 12302.00 | 59.00 | 365 |
2012 | M & M ROYALTY LTD | 6774.00 | 0.00 | 366 |
2013 | M & M ROYALTY LTD | 9108.00 | 0.00 | 365 |
2014 | M & M ROYALTY LTD | 8372.00 | 0.00 | 365 |
2015 | SOUND ENERGY CO INC | 5283.00 | 0.00 | 305 |
2016 | SOUND ENERGY CO INC | 8763.00 | 0.00 | 365 |
2017 | SOUND ENERGY CO INC | 7677.00 | 0.00 | 365 |
2018 | SOUND ENERGY CO INC | 5321.00 | 0.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2001 | WEINSZ OIL & GAS INC | Brine | 185 | 178 |
2002 | WEINSZ OIL & GAS INC | Brine | 35 | 365 |
2003 | WEINSZ OIL & GAS INC | Brine | 0 | 365 |
2004 | M & M ROYALTY LTD | Brine | 0 | 365 |
2005 | M & M ROYALTY LTD | Brine | 0 | 365 |
2006 | M & M ROYALTY LTD | Brine | 0 | 365 |
2007 | M & M ROYALTY LTD | Brine | 0 | 365 |
2008 | M & M ROYALTY LTD | Brine | 0 | 365 |
2009 | M & M ROYALTY LTD | Brine | 20 | 365 |
2010 | M & M ROYALTY LTD | Brine | 0 | 365 |
2011 | M & M ROYALTY LTD | Brine | 0 | 365 |
2012 | M & M ROYALTY LTD | Brine | 0 | 366 |
2013 | M & M ROYALTY LTD | Brine | 0 | 365 |
2014 | M & M ROYALTY LTD | Brine | 0 | 365 |
2015 | SOUND ENERGY CO INC | Brine | 10 | 305 |
2016 | SOUND ENERGY CO INC | Brine | 0 | 365 |
2017 | SOUND ENERGY CO INC | Brine | 0 | 365 |
2018 | SOUND ENERGY CO INC | Brine | 0 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1327018035 | 2006-2-23 0:00: | PW | No Violations | |
-334425307 | 2016-12-9 0:00: | UP | No Violations | 0.30 |
0001250i13 | 2001-04-17 | pl | No Violations | 7:30 A.M./ Arrived on site to find rig drilling @ 302 . Left site to call Tom Tugend , Scott Kell & Jay Cheslock to advise of approximate time for cementing surface casing . Arrived back on site to find rig making a connection @ 307 . Rig reached total depth of surface hole @ 391 . Rig crew then run surface casing into wellbore. Petroset cementing services then mixed and pumped cement into annulus of casing to surface . Cementing head was then shut-in for wait-on time for cement to reach 500P.S.I. Compresive strength. LEFT SITE @ |
0033056153 | 2003-12-23 | Preliminary Restoration | No Violations | Restoration approved . |
0098877771 | 2002-10-22 | Preliminary Restoration | No Violations | Meets requirements. |
0224812366 | 2013-08-28 | UrbanProduction Wells | No Violations | My inspection found the well in production. The well was equipped with a plunger lift unit and proper identification sign. The tank battery contained two, 100 barrel production tanks, two, 50 barrel brine tanks, and two separators. There were plugs on the load lines. The dike met containment requirements. There were two, domestic gas lines coming off the separators. Locked chain link fenced surrounded the tank battery and well. An identification sign was posted outside the tank battery on a wooden post. The tank battery and lease road was share with permit number 2-3729. The lease road was well maintained. This well was placed into production prior to House Bill 278. |
0334425307 | 2016-12-09 | UrbanProduction Wells | No Violations
-3729. The equipment on the site consists of the following:
| |
1250i13 | 2001-4-17 0:00: | pl | No Violations | |
1327018035 | 2006-02-23 | Production Wells | No Violations | no violations . |
1405352642 | 2014-07-11 | UrbanProduction Wells | No Violations | I was on location for a status check inspection. I found during my inspection the well in production with a plunger lift unit. The tank battery consisted of a 100 barrel production tank, a 50 barrel brine tank and a separator. There was a dike surrounding the tank battery. Identification signs were posted at the well and tank battery. There was a plug on the load line. Locked, chain link fences with barb wire surrounded the tank battery and well. The lease road was well maintained with crushed limestone. The well was placed into production prior to House Bill 278. |
1596034399 | 2020-7-29 0:00: | UP | No Violations | |
1700926459 | 2008-02-14 | Production Wells | No Violations | no violations . |
1726858980 | 2008-08-21 | Production Wells | No Violations | no violations . |
224812366 | 2013-8-28 0:00: | UP | No Violations | 0.50 |
33056153 | 2003-12-23 0:00 | PL | No Violations | |
98877771 | 2002-10-22 0:00 | PL | No Violations | 0.50 |
For data sources see[9]