If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-155-23807 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.14,"lon":-80.59,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Trumbull | |
Municipality: Hubbard Township | |
Operator Name: BOCOR HOLDINGS, LLC | |
Well Pad ID: | |
Farm/Lease Name: HPP | |
License Status: Producing | |
License Date: 2006-04-14 | |
Spud Date: 2006-09-14 | |
Spud Drilling Contractor: CAPSTAR DRILLING | |
Final Drill Date: 2006-09-19 | |
Well Total Depth: 5462.00 ft | |
Configuration: Vertical | |
Latitude: 41.140000 | |
Longitude: -80.590000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2006-04-14 | Proposed Formations:CLINTON/MEDINA, Issued Date:4/14/2006, Expired Date:4/14/2007 6:00:00 AM, Drilling unit acres:41.127, Proposed Well Type:OG, Proposed Well Class:POOL |
Completed | 2006-09-19 | RBDMS Rec |
Reached Total Depth | 2006-09-19 | RBDMS Rec |
Completion Report Received | 2006-12-13 | RBDMS Rec |
Construction Permit Expires | 2007-04-14 | RBDMS Rec |
Record Last Modified | 2015-09-24 | RBDMS Rec |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2007-02-22 | 5208 | 5362 | 85 |
5208 | 5362 | 85 | |
5208 | 5362 | 85 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 70080 Gal | 60000 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
0 | 0 | 0 | ||
2007 | BOCOR HOLDINGS, LLC | 7529.00 | 353.00 | 365 |
2008 | BOCOR HOLDINGS, LLC | 2471.00 | 124.00 | 365 |
2009 | BOCOR HOLDINGS, LLC | 2679.00 | 125.00 | 365 |
2012 | BOCOR HOLDINGS, LLC | 1460.00 | 111.00 | 366 |
2013 | BOCOR HOLDINGS, LLC | 1798.00 | 37.00 | 365 |
2014 | BOCOR HOLDINGS, LLC | 2158.00 | 92.00 | 365 |
2015 | BOCOR HOLDINGS, LLC | 1919.00 | 44.00 | 369 |
2016 | BOCOR HOLDINGS, LLC | 2912.00 | 25.00 | 365 |
2017 | BOCOR HOLDINGS, LLC | 2396.00 | 25.00 | 365 |
2018 | BOCOR HOLDINGS, LLC | 2160.00 | 18.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2007 | BOCOR HOLDINGS, LLC | Brine | 80 | 365 |
2008 | BOCOR HOLDINGS, LLC | Brine | 17 | 365 |
2009 | BOCOR HOLDINGS, LLC | Brine | 1 | 365 |
2012 | BOCOR HOLDINGS, LLC | Brine | 35 | 366 |
2013 | BOCOR HOLDINGS, LLC | Brine | 0 | 365 |
2014 | BOCOR HOLDINGS, LLC | Brine | 0 | 365 |
2015 | BOCOR HOLDINGS, LLC | Brine | 19 | 369 |
2016 | BOCOR HOLDINGS, LLC | Brine | 15 | 365 |
2017 | BOCOR HOLDINGS, LLC | Brine | 30 | 365 |
2018 | BOCOR HOLDINGS, LLC | Brine | 0 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1045253964 | 2012-1-10 0:00: | UL | No Violations | |
1045253964 | 2012-01-10 | UrbanPreliminary Restoration | No Violations | Preliminary Restoration was completed and meets all requirements. |
1047119393 | 2020-6-17 0:00: | UP | No Violations | |
1177856725 | 2013-10-17 | UrbanPreliminary Restoration | No Violations | My inspection found the well in production. The well was equipped with a plunger lift unit. The tank battery contained a 100 barrel production tank, a 50 barrel brine tank, and a vertical separator. The proper identification sign was posted. Locked chain link fences surrounded the tank battery and well. The proper safety equipment was installed on the production tank. There was a plug on the load line. The dike met containment requirements. The lease road was in good, stable condition with a locked gate at the entrance. The site was graded. Vegetation was well established. The pit was fill and all debris removed. Drainage and erosion controls were in place and working properly. Preliminary restoration passed. |
For data sources see[9]