If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-155-23943 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.14,"lon":-80.58,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Trumbull | |
Municipality: Hubbard Township | |
Operator Name: BOCOR HOLDINGS, LLC | |
Well Pad ID: | |
Farm/Lease Name: HOMZY | |
License Status: Producing | |
License Date: 2008-07-03 | |
Spud Date: 2008-09-19 | |
Spud Drilling Contractor: CAPSTAR DRILLING | |
Final Drill Date: 2008-09-24 | |
Well Total Depth: 5421.00 ft | |
Configuration: Vertical | |
Latitude: 41.140000 | |
Longitude: -80.580000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2008-07-03 | Proposed Formations:CLINTON/MEDINA, Issued Date:7/3/2008, Expired Date:7/3/2009 6:00:00 AM, Drilling unit acres:40, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2008-09-24 | |
Completion Report Received | 2008-12-23 | |
Construction Permit Expires | 2009-07-03 | |
Record Last Modified | 2015-09-24 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2009-02-19 | 5155 | 5238 | 81 |
2009-02-19 | 5317 | 5322 | 11 |
5155 | 5238 | 81 | |
5317 | 5322 | 11 | |
5155 | 5238 | 81 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 76040 Gal | 60000 | MEDINA SANDSTONE ALSO TREATED W/ THIS FRAC JOB |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
0 | 0 | 0 | ||
2012 | BOCOR HOLDINGS, LLC | 3960.00 | 114.00 | 366 |
2013 | BOCOR HOLDINGS, LLC | 4324.00 | 125.00 | 365 |
2014 | BOCOR HOLDINGS, LLC | 3170.00 | 84.00 | 365 |
2015 | BOCOR HOLDINGS, LLC | 3758.00 | 76.00 | 369 |
2016 | BOCOR HOLDINGS, LLC | 2415.00 | 39.00 | 365 |
2017 | BOCOR HOLDINGS, LLC | 2396.00 | 84.00 | 365 |
2018 | BOCOR HOLDINGS, LLC | 2160.00 | 58.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2012 | BOCOR HOLDINGS, LLC | Brine | 0 | 366 |
2013 | BOCOR HOLDINGS, LLC | Brine | 0 | 365 |
2014 | BOCOR HOLDINGS, LLC | Brine | 0 | 365 |
2015 | BOCOR HOLDINGS, LLC | Brine | 0 | 369 |
2016 | BOCOR HOLDINGS, LLC | Brine | 0 | 365 |
2017 | BOCOR HOLDINGS, LLC | Brine | 20 | 365 |
2018 | BOCOR HOLDINGS, LLC | Brine | 15 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1639435029 | 2011-9-20 0:00: | PL | No Violations | |
-2065467643 | 2015-6-11 0:00: | UP | No Violations | 0.50 |
-973297398 | 2008-9-22 0:00: | DD | No Violations | |
0973297398 | 2008-09-22 | Drill / Deepen / Reopen | No Violations | Capstar drilling at 2778 . |
1639435029 | 2011-09-20 | Preliminary Restoration | No Violations | Preliminary Restoration meets all requirements. |
2065467643 | 2015-06-11 | UrbanProduction Wells | No Violations | I was on location for a status check. During my inspection, I found the well in production. The well is equipped with a plunger lift assembly. The tank battery consists of a 210 barrel production tank, a 50 barrel brine tank and a mechanical separator. A dike surrounds the tank battery. Identification signs are posted at the well and tank battery. Locked, chain link fences surround the tank battery and well. The lease road is in stable condition with a locked, gate at the entrance. The tank battery and lease road are shared with permit number 2-3942. |
For data sources see[9]