If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-155-24044 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.38,"lon":-80.89,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Trumbull | |
Municipality: Bristol Township | |
Operator Name: CEDAR VALLEY ENERGY INC | |
Well Pad ID: | |
Farm/Lease Name: AARON MILLER UNIT | |
License Status: Producing | |
License Date: 2011-07-15 | |
Spud Date: 2011-10-16 | |
Spud Drilling Contractor: POULSON DRILLING | |
Final Drill Date: 2011-10-19 | |
Well Total Depth: 4148.00 ft | |
Configuration: Vertical | |
Latitude: 41.380000 | |
Longitude: -80.890000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2011-07-15 | Proposed Formations:QUEENSTON, Issued Date:7/15/2011, Expired Date:7/14/2013 12:00:00 PM, Drilling unit acres:45, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2011-10-19 | |
Completion Report Received | 2011-12-13 | |
Construction Permit Expires | 2013-07-14 | |
Record Last Modified | 2017-10-24 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2012-01-11 | 3928 | 3981 | 36 |
3928 | 3981 | 36 | |
3928 | 3981 | 36 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2011-11-10 | H2O | 15 | 73410 Gal | 41500 | Universal Well Services Inc. |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2012 | CEDAR VALLEY ENERGY INC | 6825.00 | 4630.00 | 366 |
2013 | CEDAR VALLEY ENERGY INC | 5936.00 | 2620.00 | 365 |
2014 | CEDAR VALLEY ENERGY INC | 3117.00 | 1379.00 | 365 |
2015 | CEDAR VALLEY ENERGY INC | 2293.00 | 865.00 | 365 |
2016 | CEDAR VALLEY ENERGY INC | 2113.00 | 1269.00 | 365 |
2017 | CEDAR VALLEY ENERGY INC | 2077.00 | 992.00 | 365 |
2018 | CEDAR VALLEY ENERGY INC | 1723.00 | 724.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2012 | CEDAR VALLEY ENERGY INC | Brine | 1617 | 366 |
2013 | CEDAR VALLEY ENERGY INC | Brine | 885 | 365 |
2014 | CEDAR VALLEY ENERGY INC | Brine | 591 | 365 |
2015 | CEDAR VALLEY ENERGY INC | Brine | 616 | 365 |
2016 | CEDAR VALLEY ENERGY INC | Brine | 763 | 365 |
2017 | CEDAR VALLEY ENERGY INC | Brine | 311 | 365 |
2018 | CEDAR VALLEY ENERGY INC | Brine | 305 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1400149808 | 2011-10-18 0:00 | DD | No Violations | |
-1965474716 | 2016-8-22 0:00: | PW | No Violations | 1.00 |
-381056634 | 2020-3-5 0:00:0 | PW | No Violations | 0.60 |
0378163095 | 2011-10-20 | Drill / Deepen / Reopen | No Violations | The cementing of production casing was witnessed. The cement operation and site conditions were acceptable. |
1340986800 | 2012-06-20 | Preliminary Restoration | No Violations | My inspection found that the preliminary restoration was complete. There were no violations at the wellhead or at the tank battery. |
1363884418 | 2013-03-21 | Production Wells | No Violations | My inspection found the trench in the southwest corner repaired per my request. There was a 2 drain with a plug on the end through the dike. |
1381219198 | 2011-10-17 | Drill / Deepen / Reopen | No Violations | The cementing of 338 of 8.675 surface casing was completed successfully. |
1400149808 | 2011-10-18 | Drill / Deepen / Reopen | No Violations | The rig was drilling at 1975. No violations were found at the time. |
1935316230 | 2012-05-16 | Production Wells | No Violations | My inspection of this well site found no violations at the time. Preliminary Restoration was complete, except vegetation needs to be established. |
1944241165 | 2013-03-20 | Production Wells | No Violations | My inspection found the well in production. It was equipped with a pumping unit. The tank battery contained two, 100 barrel production tank, one, 50 barrel brine tank, and a separator. There were locks and plugs on the load lines. An identification sign was posted on the tank. The proper dike surrounded the tank battery with a small trench in the southwest corner. The lease road was in great condition covered with slag. I called Tim Cosma, 330-853-9565. I told him to repair the trench in the dike immediately. I will re-inspect by 3/21/2013. |
1965474716 | 2016-08-22 | Production Wells | No Violations | At the time of my inspection, I found Bishop Well Service on location pulling rods to repair a broken one. The well is equipped with an electric pumping unit. The tank battery has three storage tanks and a separator. A dike surrounds the tank battery. An identification sign is posted between the two 100 bbl. storage tanks. The load lines are secure with locks and plugs. The production equipment is in good repair. The access road is in good and stable condition with a locked gate at the entrance.
The equipment on the site consists of the following:
|
378163095 | 2011-10-20 0:00 | DD | No Violations |
For data sources see[9]