If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-155-24048 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.19,"lon":-80.55,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Trumbull | |
Municipality: Hubbard Township | |
Operator Name: PAC DRILLING LLC | |
Well Pad ID: | |
Farm/Lease Name: EVANS | |
License Status: Producing | |
License Date: 2011-12-29 | |
Spud Date: 2012-01-04 | |
Spud Drilling Contractor: G & H DRLG | |
Final Drill Date: 2012-01-14 | |
Well Total Depth: 5384.00 ft | |
Configuration: Vertical | |
Latitude: 41.190000 | |
Longitude: -80.550000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2011-12-29 | Proposed Formations:CLINTON & MEDINA, Issued Date:12/29/2011, Expired Date:12/28/2013 12:00:00 PM, Drilling unit acres:40.82, Proposed Well Type:OG, Proposed Well Class:POOL |
Correction to Well | 2012-01-13 | CORRECTION TO FOOTAGE, SHOULD BE "520'NL & 675'EL OF LOT 14". |
Reached Total Depth | 2012-01-14 | |
Completion Report Received | 2012-06-21 | |
Construction Permit Expires | 2012-12-28 | |
Record Last Modified | 2017-10-24 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2012-07-19 | 5134 | 5140 | 6 |
2012-07-19 | 5107 | 5110 | 5 |
5107 | 5110 | 5 | |
5134 | 5140 | 6 | |
5143 | 5151 | 10 | |
5194 | 5200 | 8 | |
5107 | 5110 | 5 | |
2012-07-19 | 5194 | 5200 | 8 |
2012-07-19 | 5143 | 5151 | 10 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2012-01-19 | H2O | 0 | 131055 Gal | 0 | Universal Well Services Inc. | 500 sacks of sand
No problems were encountered. |
2012-01-19 | H2O | 20 | 131055 Gal | 50000 | Universal Well Services Inc. |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2001 | OHIO VALLEY ENERGY SYSTEMS COR | 0.00 | 0.00 | 0 |
2002 | OHIO VALLEY ENERGY SYSTEMS COR | 0.00 | 0.00 | 0 |
2003 | OHIO VALLEY ENERGY SYSTEMS COR | 0.00 | 0.00 | 0 |
2004 | OHIO VALLEY ENERGY SYSTEMS COR | 0.00 | 0.00 | 0 |
2006 | OHIO VALLEY ENERGY SYSTEMS COR | 0.00 | 0.00 | 0 |
2007 | OHIO VALLEY ENERGY SYSTEMS COR | 0.00 | 5.00 | 0 |
2010 | OHIO VALLEY ENERGY SYSTEMS COR | 0.00 | 0.00 | 0 |
2011 | OHIO VALLEY ENERGY SYSTEMS COR | 0.00 | 0.00 | 0 |
2012 | PAC DRILLING LLC | 10331.00 | 649.00 | 231 |
2013 | PAC DRILLING LLC | 14057.00 | 304.00 | 365 |
2014 | PAC DRILLING LLC | 12178.00 | 256.00 | 360 |
2015 | PAC DRILLING LLC | 10606.00 | 187.00 | 360 |
2016 | PAC DRILLING LLC | 7751.00 | 146.00 | 359 |
2017 | PAC DRILLING LLC | 6466.00 | 141.00 | 359 |
2018 | PAC DRILLING LLC | 6284.00 | 54.00 | 359 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2001 | OHIO VALLEY ENERGY SYSTEMS COR | Brine | 0 | |
2002 | OHIO VALLEY ENERGY SYSTEMS COR | Brine | 0 | 0 |
2003 | OHIO VALLEY ENERGY SYSTEMS COR | Brine | 0 | 0 |
2004 | OHIO VALLEY ENERGY SYSTEMS COR | Brine | 0 | |
2006 | OHIO VALLEY ENERGY SYSTEMS COR | Brine | 0 | 0 |
2007 | OHIO VALLEY ENERGY SYSTEMS COR | Brine | 0 | 0 |
2010 | OHIO VALLEY ENERGY SYSTEMS COR | Brine | 0 | 0 |
2011 | OHIO VALLEY ENERGY SYSTEMS COR | Brine | 0 | 0 |
2012 | PAC DRILLING LLC | Brine | 309 | 231 |
2013 | PAC DRILLING LLC | Brine | 25 | 365 |
2014 | PAC DRILLING LLC | Brine | 43 | 360 |
2015 | PAC DRILLING LLC | Brine | 53 | 360 |
2016 | PAC DRILLING LLC | Brine | 0 | 359 |
2017 | PAC DRILLING LLC | Brine | 0 | 359 |
2018 | PAC DRILLING LLC | Brine | 0 | 359 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1613459289 | 2013-5-29 0:00: | UL | No Violations | 0.50 |
-1658138114 | 2012-1-4 0:00:0 | UD | No Violations | |
-1717805094 | 2012-1-26 0:00: | UD | No Violations | |
-1875853359 | 2018-5-21 0:00: | UP | No Violations | |
-943557028 | 2012-1-12 0:00: | UD | No Violations | |
0368684579 | 2012-01-09 | Urban Drill / Deepen / Reopen | No Violations | The rig was drilling on fluid at 3965 feet. There were no violations. |
0943557028 | 2012-01-12 | Urban Drill / Deepen / Reopen | No Violations | The rig was drilling on fluid at 5157. There were no violations. |
1321001453 | 2012-02-03 | Urban Drill / Deepen / Reopen | No Violations | The pits have been closed. There were no violations at the time of inspection. |
1326985970 | 2012-01-19 | Urban Drill / Deepen / Reopen | No Violations | The well stimulation operation was witnessed. All conditions were acceptable. |
1327516945 | 2012-01-04 | Urban Drill / Deepen / Reopen | No Violations | The drilling contractor was moving on location. All conditions were acceptable. |
1610217442 | 2017-04-10 | UrbanProduction Wells | No Violations
-up lines have plugs and the ball valve handles have been removed. The 210 bbl. storage tank has the required urban safety equipment. An identification sign is posted at the tank battery. The identification sign is missing the required information per 1501:9-9-05(E)(1)(a--site inspection. The well is located in a clearing surrounded by woodlands. The access road is in good repair with no gate at the entrance. The access road gate was not waived during the pre-site inspection. The equipment on the pad consists of the following:
| |
1613459289 | 2013-05-29 | UrbanPreliminary Restoration | No Violations | My inspection found the well in production. The well was equipped with a plunger lift unit and a domestic gas line. The tank battery contained one, 210 barrel production tank, one, 50 barrel brine tank, and a separator. It was surrounded by a locked chain link fence and the proper dike capable of meeting containment requirements. There was a plug on the load line. The proper safety equipment was installed on the production tank. An identification sign was properly posted at the wellhead and tank battery. There was a 7 day production chart at the separator. The site was graded and vegetated. All drainage and erosion controls were in place and working properly. The lease road was in good condition. |
1658138114 | 2012-01-04 | Urban Drill / Deepen / Reopen | No Violations | The rig drilled an 11 borehole to 630 and ran 593 of new 8.675 casing. This casing was cemented with 125 sacks of light cement and 100 sacks of Class A cement which was circulated to surface with 27 barrels of returns. The cement operation and site conditions were acceptable. |
1684652807 | 2019-03-08 | UrbanProduction Wells | No Violations | I conducted a compliance notice follow-up for compliance notice 1875853359, regarding multiple compliance issues related to urban rule requirements. At the time of this inspection, the identification located at the tank battery has been amended with the required information per 1501:9-9-05E(1)(a-e). There was a locked chain link fence surrounding the tank battery without the 3 strand barb wire, which needs to be added to the top of the fence. The production tank was over 3 foot above the top of the fence and needs to meet requirements per 1501:9-9-05E(4)(f). The access road gate was not waived during the pre-site inspection and has not been installed. Install the access gate with a lock and identification.
PAC needs to: 1) Raise the fencing around the tank battery or use low profile tanks as required by 1501:9-9-05E(4)(f). 2) Install the required gate with a lock at the access road entrance per 1501:9-9-05(E)(2)(c). 3) Post the proper identification sign on the access road gate per 1501:9-9-05E(1)(f). |
1717805094 | 2012-01-26 | Urban Drill / Deepen / Reopen | No Violations | Chem Tech delivered two truck loads of dust and the pits were solidified. All conditions were acceptable. |
1748149288 | 2012-01-14 | Urban Drill / Deepen / Reopen | No Violations | The rig installed 5054 of 4.5 production casing and cemented it with 200 sacks of Unitropic cement. Cement operation and well site conditions were acceptable. |
1875853359 | 2018-05-21 | UrbanProduction Wells | Violations Noted | At the time of this inspection, the well was equipped with a plunger lift assembly. The annulus and flow line valves were open. A domestic gas supply comes off of the wellhead with an open 2 inch valve, open 1 inch valve, a gas meter, a drip tank, and regulator. An identification sign was posted at the well. The diked tank battery has two storage tanks and a separator. The pick-up lines have plugs and the valve handles have been removed. The 210 BBL storage tank has the required urban safety equipment. An identification sign was posted at the tank battery. The identification sign was missing the required information per 1501:9-9--e). There was a danger, keep out and no smoking sign(s) posted. There was a locked chain link fence surrounding the tank battery. The 3 strand barb wire needed to be added to the top of the fence. The production tank was over 3 foot above the top of the fence and needs to meet requirements per 1501:9-9--site inspection. The access road was stable with no gate at the entrance. The access road gate was not waived during the pre-site inspection and has not been installed. |
368684579 | 2012-1-9 0:00:0 | UD | No Violations | |
734619632 | 2020-3-27 0:00: | UP | No Violations |
Inspection ID | Violation ID | Violation Date | Violation Code | Violation Comments |
---|---|---|---|---|
1875853359 | US-OH-118815 | 2018-05-25 | 9-05E1 | ID (a-i) |
1875853359 | US-OH-118816 | 2018-05-25 | 9-05E2 | FENCING (a-d) |
1875853359 | US-OH-118817 | 2018-05-25 | 9-05E4 | TANKS (a-i) |
1875853359 | US-OH-118818 | 2018-05-25 | 9-9-02 | General Safety |
For data sources see[9]