If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-155-24057 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.34,"lon":-80.55,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Trumbull | |
Municipality: Hartford Township | |
Operator Name: HALCON OPERATING COMPANY INC | |
Well Pad ID: US-OH-000624 | |
Farm/Lease Name: BRUGLER | |
License Status: Not Drilled | |
License Date: 2012-11-02 | |
Spud Date: | |
Spud Drilling Contractor: | |
Final Drill Date: | |
Well Total Depth: | |
Configuration: Vertical | |
Latitude: 41.340000 | |
Longitude: -80.550000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2012-05-09 | Proposed Formations:UTICA, Issued Date:5/9/2012, Expired Date:5/9/2014 12:00:00 PM, Drilling unit acres:114.69, Proposed Well Type:OG, Proposed Well Class:EDPW |
APP | 2012-05-11 | Proposed Formations:TRENTON, Issued Date:5/11/2012, Expired Date:5/11/2014 12:00:00 PM, Drilling unit acres:114.69, Proposed Well Type:ST, Proposed Well Class:STRT |
Change of Owner | 2012-10-25 | Operator changed from 8928, CARRIZO (UTICA) LLC to 8966, HALCON OPERATING COMPANY INC |
APP | 2012-11-02 | Proposed Formations:TRENTON, Issued Date:11/2/2012, Expired Date:11/2/2014 12:00:00 PM, Drilling unit acres:114.69, Proposed Well Type:ST, Proposed Well Class:STRT |
Completion Report Received | 2014-08-04 | |
Construction Permit Expires | 2014-11-02 | |
Record Last Modified | 2018-11-01 |
For data sources see[2]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 03/06/2013 | 03/11/2013 | 6674 | 4,081,960.0 | 21500 |
2 | 03/11/2013 | 03/11/2013 | 6674.0 | 4017278.0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | HYDROCHLORIC ACID | Halliburton | Base Fluid | NA | NA | 0 | 0 | 0 |
Hazardous and Non-Hazardous Ingredients | Alcohols, C14-C15, ethoxylated | 68951-67-7 | 30 | 0.000944024 | 383 | |||
Water | 7732-18-5 | 100 | 0.745836 | 302088 | ||||
Ammonium chloride | 12125-02-9 | 10 | 0.00262676 | 1064 | ||||
Isopropanol | 67-63-0 | 30 | 0.0411882 | 16683 | ||||
Sodium sulfate | 7757-82-6 | 0.1 | 0.00000402 | 2 | ||||
Potassium carbonate | 584-08-7 | 60 | 0.0114624 | 4643 | ||||
Olefins | Confidential | 5 | 0.00037761 | 154 | ||||
Guar gum | 9000-30-0 | 100 | 0.156239 | 63281 | ||||
Tributyl tetradecyl phosphonium chloride | 81741-28-8 | 10 | 0.00378335 | 1533 | ||||
Cured acrylic resin | Confidential | 30 | 0.00388813 | 1575 | ||||
Hydrochloric acid | 7647-01-0 | 60 | 0.303208 | 122808 | ||||
Terpenes and Terpenoids | Confidential | 10 | 0.0137294 | 5561 | ||||
Alcohols, C12-16, ethoxylated | 61791-08-0 | 30 | 0.0411882 | 16683 | ||||
Crystalline Silica, Quartz | 14808-60-7 | 0.1 | 0.000156239 | 64 | ||||
Polyacrylamide copolymer | Confidential | 30 | 0.00118379 | 480 | ||||
Surfactant mixture | Confidential | 1 | 0.00312477 | 1266 | ||||
Propargyl alcohol | 107-19-7 | 10 | 0.000314675 | 128 | ||||
Terpenes and Terpenoids, sweet orange-oil | 68647-72-3 | 30 | 0.0411882 | 16683 | ||||
Fatty acids, tall oil | Confidential | 30 | 0.000944024 | 383 | ||||
Phenol / formaldehyde resin | 9003-35-4 | 5 | 0.133682 | 54145 | ||||
Sodium perborate tetrahydrate | 10486-00-7 | 100 | 0.000508607 | 206 | ||||
Hexamethylenetetramine | 100-97-0 | 2 | 0.0534729 | 21658 | ||||
Organic phosphonate | Confidential | 60 | 0.0145768 | 5904 | ||||
Methanol | 67-56-1 | 60 | 0.00188805 | 765 | ||||
Monoethanolamine borate | 26038-87-9 | 60 | 0.0951638 | 38544 | ||||
Quaternary amine | Confidential | 5 | 0.00251494 | 1019 | ||||
C.I. Pigment Red 5 | 6410-41-9 | 1 | 0.000125423 | 51 | ||||
Sodium persulfate | 7775-27-1 | 100 | 0.00402441 | 1630 | ||||
Hydrotreated light petroleum distillate | 64742-47-8 | 30 | 0.00118379 | 480 | ||||
Silica gel | 112926-00-8 | 1 | 0.00156239 | 633 | ||||
Ethoxylated fatty acid | Confidential | 30 | 0.0823763 | 33366 | ||||
Amine salts | Confidential | 0.1 | 0.00008246 | 34 | ||||
Ammonium salt | Confidential | 60 | 0.0247371 | 10020 | ||||
Acetic acid | 64-19-7 | 60 | 0.0114149 | 4624 | ||||
Ethylene glycol | 107-21-1 | 30 | 0.0475819 | 19272 | ||||
Alcohols ethoxylated | Confidential | 5 | 0.000197299 | 80 | ||||
Citric acid | 77-92-9 | 60 | 0.0131603 | 5331 | ||||
Amide | Confidential | 5 | 0.000197299 | 80 | ||||
Enzyme | Confidential | 5 | 0.000627117 | 255 | ||||
Sorbitan monooleate polyoxyethylene derivative | 9005-65-6 | 1 | 0.00003946 | 16 | ||||
Crystalline silica, quartz | 14808-60-7 | 100 | 14.9074 | 6,037,920.0 | ||||
Sorbitan, mono-9-octadecenoate, (Z) | 1338-43-8 | 1 | 0.00003946 | 16 | ||||
Bentonite, benzyl(hydrogenated
tallow alkyl) dimethylammonium stearate complex |
121888-68-4 | 5 | 0.00781193 | 3165 | ||||
Formaldehyde | 50-00-0 | 1 | 0.000242946 | 99 | ||||
Reaction product of acetophenone,
formaldehyde, thiourea and oleic acid in dimethyl formamide |
68527-49-1 | 30 | 0.000944024 | 383 | ||||
Propylene glycol | 57-55-6 | 60 | 0.0227001 | 9195 | ||||
Acetic anhydride | 108-24-7 | 100 | 0.0190249 | 7706 | ||||
Walnut hulls | NA | 100 | 0.0125423 | 5080 | ||||
Sodium chloride | 7647-14-5 | 5 | 0.00225872 | 915 | ||||
BA-40L BUFFERING AGENT, BC-140,
BE-9W, Cla-Web(TM), FE-1A ACIDIZING COMPOSITION, FE-2A, FR-66, GasPerm 1000(TM), HAI-OS ACID INHIBITOR, OPTIFLO-HTE, OptiKleen-WF(TM), SAND-COMMON WHITE-100 MESH, SSA-2, BULK (100003676), |
Halliburton | Additive, Biocide, Breaker, Buffer, Concentrate, Corrosion Inhibitor, Crosslinker, Friction Reducer, Gelling Agent, Proppant, Scale Inhibitor, | NA | NA | 0 | 0 | 0 | |
SAND-CRC PREMIUM-30/50, BULK, SAND-PREMIUM
WHITE-30/50, BULK, Scalechek(R) LP-65 Scale Inhibitor, SP BREAKER, WG-36 GELLING AGENT |
Halliburton | Surfactant | NA | NA | 0 | 0 | 0 | |
Fresh Water | Operator | Base Fluid | Fresh Water | 7732-18-5 | 100 | 83.9513 | 34,002,600.0 | |
2 | WG-36 GELLING AGENT | Halliburton | Gelling Agent | Guar gum | 9000-30-0 | 10000.0 | 15.63285 | |
Scalechek LP-65 Scale Inhibitor | Halliburton | Scale Inhibitor | Ammonium chloride | 12125-02-9 | 1000.0 | 0.24309 | ||
30/50 CRC Sand | Halliburton | Proppant | Crystalline silica, quartz | 14808-60-7 | 10000.0 | 28.99739 | ||
HAI-OS ACID INHIBITOR | Halliburton | Corrosion Inhibitor | Methanol | 67-56-1 | 6000.0 | 0.17793 | ||
FE ACID - 10 HCL | Halliburton | Solvent | Hydrochloric acid | 7647-01-0 | 1000.0 | 183.9431 | ||
GasPerm 1000 | Halliburton | Surfactant | Isopropanol | 67-63-0 | 3000.0 | 4.12118 | ||
SP BREAKER | Halliburton | Breaker | Sodium persulfate | 7775-27-1 | 10000.0 | 0.40267 | ||
20/40 Sand | Halliburton | Proppant | Crystalline silica, quartz | 14808-60-7 | 10000.0 | 28.90351 | ||
OptiKleen-WF | Halliburton | Concentrate | Sodium perborate tetrahydrate | 10486-00-7 | 10000.0 | 0.05089 | ||
BE-9W | Halliburton | Biocide | Tributyl tetradecyl phosphonium chloride | 81741-28-8 | 1000.0 | 0.37855 | ||
Walnut hulls | Mixture | 10000.0 | 1.25496 | |||||
Propargyl alcohol | 107-19-7 | 1000.0 | 0.02966 | |||||
Monoethanolamine borate | 26038-87-9 | 6000.0 | 9.52185 | |||||
Phenol / formaldehyde resin | 9003-35-4 | 500.0 | 11.92603 | |||||
Hexamethylenetetramine | 100-97-0 | 200.0 | 4.77041 | |||||
Terpenes and Terpenoids, sweet orange-oil | 68647-72-3 | 3000.0 | 4.12118 | |||||
Fresh Water | Operator | 10000.0 | 8266.852 | |||||
FR-66 | Halliburton | Friction Reducer | Hydrotreated light petroleum distillate | 64742-47-8 | 3000.0 | 0.11845 | ||
Premium White Sand | Halliburton | Proppant | Crystalline silica, quartz | 14808-60-7 | 10000.0 | 1184.65357 | ||
BA-40LM | Halliburton | Buffer | Potassium carbonate | 584-08-7 | 6000.0 | 1.14668 | ||
SSA-2 | Halliburton | Proppant | Crystalline silica, quartz | 14808-60-7 | 10000.0 | 10.14834 | ||
BC-140 | Halliburton | Crosslinker | Ethylene glycol | 107-21-1 | 3000.0 | 4.76093 | ||
20/40 CRC Sand | Halliburton | Proppant | Crystalline silica, quartz | 14808-60-7 | 10000.0 | 238.52065 | ||
OPTIFLO-HTE | Halliburton | Breaker | Crystalline silica, quartz | 14808-60-7 | 3000.0 | 0.37649 | ||
CLA-WEB | Halliburton | Additive | Ammonium salt | Confidential Business Information | 5000.0 | 2.06261 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2013-03-09 | H2O | 0 | 246865 Gal | 414600 | Halliburton | STAGE 7 |
2013-03-10 | H2O | 0 | 226262 Gal | 384900 | Halliburton | STAGE 11 |
2013-03-08 | H2O | 0 | 399478 Gal | 750800 | Halliburton | STAGE 2 |
2013-03-06 | H2O | 0 | 348453 Gal | 7600 | Halliburton | STAGE 1 |
2013-03-11 | H2O | 0 | 232551 Gal | 406500 | Halliburton | STAGE 14 |
2013-03-08 | H2O | 0 | 255087 Gal | 385700 | Halliburton | STAGE 3 |
2013-03-10 | H2O | 0 | 230305 Gal | 366300 | Halliburton | STAGE 12 |
2013-03-08 | H2O | 0 | 227963 Gal | 353200 | Halliburton | STAGE 4 |
2013-03-09 | H2O | 0 | 227346 Gal | 373400 | Halliburton | STAGE 6 |
2013-03-09 | H2O | 0 | 229055 Gal | 366200 | Halliburton | STAGE 5 |
2013-03-11 | H2O | 0 | 232641 Gal | 434700 | Halliburton | STAGE 16 |
2013-03-10 | H2O | 0 | 227617 Gal | 361600 | Halliburton | STAGE 10 |
2013-03-09 | H2O | 0 | 241357 Gal | 422400 | Halliburton | STAGE 8 |
2013-03-10 | H2O | 0 | 235181 Gal | 369600 | Halliburton | STAGE 9 |
2013-03-11 | H2O | 0 | 219059 Gal | 415500 | Halliburton | STAGE 15 |
2013-03-11 | H2O | 0 | 232536 Gal | 405900 | Halliburton | STAGE 13 |
For data sources see[4]
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2013 | HALCON OPERATING COMPANY INC | Brine | 15603 | 153 |
2014 | HALCON OPERATING COMPANY INC | Brine | 2890 | 323 |
2015 | HALCON OPERATING COMPANY INC | Brine | 523 | 149 |
2017 | PIN OAK ENERGY PARTNERS LLC | Brine | 154 | 60 |
2018 | PIN OAK ENERGY PARTNERS LLC | Brine | 94 | 223 |
2019 | PIN OAK ENERGY PARTNERS LLC | Brine | 73 | 90 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1121477726 | 2013-7-9 0:00:0 | PW | No Violations | 1.00 |
-1145531619 | 2016-8-12 0:00: | PW | No Violations | 0.70 |
-1348357384 | 2019-3-21 0:00: | PW | No Violations | 0.60 |
-1439744388 | 2012-11-28 0:00 | DD | No Violations | 0.50 |
-1464265581 | 2018-1-4 0:00:0 | PW | No Violations | |
-1488797016 | 2013-1-3 0:00:0 | DD | No Violations | 1.00 |
-1545213716 | 2020-2-13 0:00: | PW | No Violations | 0.50 |
-1656740790 | 2013-3-20 0:00: | DD | No Violations | 0.50 |
-1721092510 | 2014-6-18 0:00: | PL | No Violations | 0.50 |
-1872331361 | 2015-4-27 0:00: | PW | No Violations | 1.00 |
-419563645 | 2012-11-30 0:00 | DD | No Violations | 0.30 |
-753371257 | 2013-6-3 0:00:0 | DD | No Violations | 1.00 |
0419563645 | 2012-11-30 | Drill / Deepen / Reopen | No Violations | My inspection found no rig activity on location. The construction crew was compacting the well pad. The drainage controls were in place around the pad. A gate was placed at the lease road entrance. |
0751101011 | 2012-11-14 | Drill / Deepen / Reopen | No Violations | My inspection found the well pad under construction. |
0753371257 | 2013-06-03 | Drill / Deepen / Reopen | No Violations | My inspection found Halcon prepping a portion of the well pad to build the tank battery. They plan to install four, 400 barrel production tanks and two compressors. The sales line was being installed on the northeast site of the site that will be run to Rt. 7. Drainage and erosion controls were in place and working properly. Grass was well established on the topsoil stockpiles and surrounding area. The proper identification was posted at the entrance. The site was surrounded by post and wire fencing with a locked gate at the entrance. |
0791935617 | 2016-02-24 | Production Wells | No Violations
| |
0947764826 | 2013-01-28 | Drill / Deepen / Reopen | No Violations | My inspection found the Patterson Rig 256 drilling Hole #5 at a depth of 9,312. Drainage controls were in place. Permit was posted in the company mans trailer and signage was posted at the entrance. |
1121477726 | 2013-07-09 | Production Wells | No Violations | My inspection found the tank battery complete. The tank battery contained four, 410 bbl tanks; two for produced water and two for crude oil. The dike was made of steel that contained a liner and pea gravel. Overall completion of the well was still in progress, technicians were on location working installing flow lines and production equipment. The proper identification was posted at the entrance. Drainage control were working proper. Vegetation was well established on the topsoil stockpiles surrounding the well pad. |
1145531619 | 2016-08-12 | Production Wells | No Violations
The equipment on the pad consists of the following: 4 Storage tanks 1 Bullet tank 1 Flare 1 Vertical heat treater 1 Fuel gas conditioning/JT skid 1 Dehydrator 1 Production well on the pad Site fenced and man doors locked | |
1348357384 | 2019-03-21 | Production Wells | No Violations | I conducted an inspection on this well site. At the time of this inspection, the well was equipped with a plunger lift assembly and the valves on the casing and flow line were open. The tank battery consisted of four 400 BBL production tanks and was diked. Other production equipment on site consisted of one butane tank and a separator. The location was stable and secondary earthern berm was intact. The signage was located on the locked gate that surrounded the site. The lease access was stable. No violations observed. |
1355410296 | 2012-12-13 | Drill / Deepen / Reopen | No Violations | I stopped to check on the well site. My inspection found no rig activity. |
1357662409 | 2013-01-05 | Drill / Deepen / Reopen | No Violations | I witnessed the cementing of the surface casing by Halliburton for Halcon Operating Company, Inc. Hole #2 was 26 in diameter and drilled to a depth of 405. The surface casing was 20 and set to a depth of 394. The surface casing assembly included a Halliburton 20 float shoe and a Halliburton Super Seal II Float collar (stab in) with one, 20 joint in between. Halcon used a Halliburton sealing sleeve adapter on the end of the drill pipe to stab into the float collar to run the cement. Halliburton filled the lines with 5 barrels of fresh water, broke circulation with 10 barrels of fresh water, pumped 50 barrels of fresh water plus 6% gel followed by 138 barrels of Class A cement. Six barrels of fresh water was used to displace the cement. I witnessed good cement return to surface. The cement held steady at the surface for 20 minutes. A wiper ball was used to displace cement inside the drill pipe leaving 40 of cement in the surface casing. |
1358180870 | 2013-01-14 | Drill / Deepen / Reopen | No Violations | My inspection found the Patterson Rig 256 drilling Hole #4 and at a depth of 3,336. The permit was posted in the company mans trailer. Signage was posted at the lease road entrance. Drainage controls were in place throughout the well site. The BOP was in place. |
1359663100 | 2013-01-31 | Drill / Deepen / Reopen | No Violations | I arrived at the site at 1445. The drillers have reached long string total depth (TD) of 10,929 (ground level). Production string is comprised of 5.5-inch casing in 8.75-inch diameter borehole. A total of 162 centralizers were deployed. Circulation of hole is in progress. Circulation from 1330 to 1500 hours. 2 times bottoms-up hole volumes achieved. Crews are commencing rig-up of cement drive head unit (Blackhawk top-drive cement head) . Company man (Brian Dutton) reports no issues or problems. At approximately 1700, cement drive head rigged up and circulation established. At 1800: safety meeting conducted by cementers (Haliburton) ahead of cementing operations. At 2145, cement circulating to the surface. |
1403112802 | 2014-06-18 | Preliminary Restoration | No Violations | I was on location for a preliminary restoration inspection. I found during my inspection surrounded by a fence with a locked gate. An identification sign was posted at the entrance to the well site. The berms on the south and west sides of the pad were vegetated. The land surrounding the well pad was for agriculture use. All drilling equipment had been removed. All debris was removed. Drainage and erosion controls were in place and working properly. The well was equipped for direct flow that was in production. The production tanks were surrounded by a lined steel dike. All of the production tanks spacing was in compliance. The well pad was in stable condition. The lease road was in excellent condition with crushed limestone. Restoration passed. |
1439744388 | 2012-11-28 | Drill / Deepen / Reopen | No Violations | My inspection found the construction crew installing the cellar. |
1464265581 | 2018-01-04 | Production Wells | No Violations | I conducted an inspection on this site with DOGRM inspector, John Fleming. The well was equipped with a plunger lift assembly and the annulus and flow line valves were open. Production records for this well were current. The tank battery consisted of four 400 BBL production tanks and was diked. Other production equipment on site consisted of one butane tank and a separator. The location was stable and secondary earthern berm was intact. The signage was located on the locked gate that surrounded the site. The lease access was stable. No violations observed. |
1488797016 | 2013-01-03 | Drill / Deepen / Reopen | No Violations | I stopped to check on the progress of drilling Hole #2. I found the rig started drilling on 1/3/2013, reached 70, and ran into problems with the cold weather. The company man expected to be back to drilling within a few hours. |
1656740790 | 2013-03-20 | Drill / Deepen / Reopen | No Violations | My inspection found drainage controls still in place. An identification sign was posted at the entrance. No violations. |
168057768 | 2019-6-28 0:00: | PW | No Violations | |
1721092510 | 2014-06-18 | Preliminary Restoration | No Violations | I was on location for a preliminary restoration inspection. I found during my inspection surrounded by a fence with a locked gate. An identification sign was posted at the entrance to the well site. The berms on the south and west sides of the pad were vegetated. The land surrounding the well pad was for agriculture use. All drilling equipment had been removed. All debris was removed. Drainage and erosion controls were in place and working properly. The well was equipped for direct flow that was in production. The production tanks were surrounded by a lined steel dike. All of the production tanks spacing was in compliance. The well pad was in stable condition. The lease road was in excellent condition with crushed limestone. Restoration passed. |
1872331361 | 2015-04-27 | Production Wells | No Violations | I meet with the Federal EPA at this location. They performed an Air Quality Inspection of the well and tank battery. I performed a status check of the tank battery and well head. ID signs are posted. No violations were noted at this time. |
751101011 | 2012-11-14 0:00 | DD | No Violations | 0.50 |
791935617 | 2016-2-24 0:00: | PW | No Violations | 0.50 |
947764826 | 2013-1-28 0:00: | DD | No Violations | 0.50 |
For data sources see[7]