34-155-24058

Well Details

Well ID: 34-155-24058
Loading map...
Country: United States
State: Ohio
County: Trumbull
Municipality: Hubbard Township
Operator Name: PAC DRILLING LLC
Well Pad ID:
Farm/Lease Name: H.C.N.
License Status: Producing
License Date: 2012-08-01
Spud Date: 2012-08-07
Spud Drilling Contractor: WILDCAT DRILLING
Final Drill Date: 2012-08-12
Well Total Depth: 5394.00 ft
Configuration: Vertical
Latitude: 41.180000
Longitude: -80.560000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2012-08-01 Proposed Formations:ROSE RUN, Issued Date:8/1/2012, Expired Date:8/1/2014 12:00:00 PM, Drilling unit acres:48.75, Proposed Well Type:OG, Proposed Well Class:EDPW
Correction to Well 2012-08-02 CORRECTION TO PROPOSED TOTAL DEPTH, PROPOSED GEOLOIGCAL FORMATION & CASING PROGRAM.
Reached Total Depth 2012-08-12
Completion Report Received 2013-03-06
Construction Permit Expires 2013-08-01
Record Last Modified 2017-02-15

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2013-03-05 5094 5248 45
5094 5248 45
5094 5248 45

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2012-08-17 H2O 20 3370 Bbl 50200 Universal Well Services Inc.

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2012 PAC DRILLING LLC 5682.00 188.00 114
2013 PAC DRILLING LLC 15645.00 433.00 365
2014 PAC DRILLING LLC 12449.00 202.00 360
2015 PAC DRILLING LLC 10654.00 91.00 360
2016 PAC DRILLING LLC 7693.00 174.00 359
2017 PAC DRILLING LLC 6414.00 115.00 359
2018 PAC DRILLING LLC 6411.00 162.00 359

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2012 PAC DRILLING LLC Brine 84 114
2013 PAC DRILLING LLC Brine 52 365
2014 PAC DRILLING LLC Brine 67 360
2015 PAC DRILLING LLC Brine 49 360
2016 PAC DRILLING LLC Brine 0 359
2017 PAC DRILLING LLC Brine 61 359
2018 PAC DRILLING LLC Brine 61 359

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1242149039 2012-8-16 0:00: UP No Violations 0.50
-1867996371 2013-5-29 0:00: UP No Violations 0.50
-783354296 2012-9-5 0:00:0 UD No Violations 0.50
-808592354 2017-12-18 0:00 UP No Violations 0.40
0085958188 2017-04-24 UrbanProduction Wells No Violations

-up lines have plugs, but no locks. The 210 bbl. storage tank has the required urban safety equipment. A locked chain link fence surrounds the tank battery. The access road is in good repair.

The equipment on the pad consists of the following:



0290012650 2018-05-17 UrbanProduction Wells No Violations I conducted a compliance notice follow-up for compliance notice 2112323029. The well was equipped with a plunger lift assembly. The annulus and flow line valves were open. The identification sign was posted at the well. There was a locked chain link fence at the well. There was a domestic gas supply plumbed off of the wellhead. The diked tank battery has two storage tanks and a separator. The pick-up lines have plugs, but still need locks. The 210 BBL storage tank has the required urban safety equipment. The identification sign was missing the required information per 1501:9-9-05(E)(1)(a-e). A locked chain link fence surrounds the tank battery. The production tank was 3 foot above the top of the fence. The access road was stable. There was no access road gate and it was not waived during the pre-site inspection. No landscaping has been installed at the well site location, and it was not waved during the pre-site inspection.

PAC needs to: 1) Correct the identification sign to be in compliance with 1501:9-9-05(E)(1)(a-e) at the tank battery with: Well owners address and phone number Property street address or nearest address to the access road entrance. 2) Place landscaping on the south side of the tank battery as required by 1501:9-9-05(E)(6). 3) Install the require gate with a lock at the access road entrance per 1501:9-9-05(E)(2)(c). 4) Post the proper identification sign on the access road gate per 1501:9-9-05(E)(1)(f). 5) Raise the fencing around the tank battery or use low profile tanks to be in compliance with 1501:9-9-05(E)(4)(f). 6) Install locks on all pick-up lines or remove the handles per 1501:9-9-05(E)(3).

0447796796 2017-09-08 UrbanProduction Wells No Violations

-up lines have plugs, but no locks. The 210 bbl. storage tank has the required urban safety equipment. A locked chain link fence surrounds the tank battery. The access road is in good repair. I spoke with Rusty Thornhill to remove the handles from the pick-up line valves or add locks.

0496192369 2019-03-08 UrbanProduction Wells No Violations I conducted a compliance notice follow-up for compliance notice 2112323029, regarding multiple compliance issues related to urban rule requirements. At the time of this inspection, the pick-up lines have plugs, but still need locks or the handles removed. The identification sign was missing the required information per 1501:9-9-05(E)(1)(a-e). A locked chain link fence surrounds the tank battery. The production tank was 3 foot above the top of the fence. No access road gate has been installed, and it was not waived during the pre-site inspection. No landscaping has been installed at the well site location, and it was not waved during the pre-site inspection.

PAC needs to: 1) Correct the identification sign to be in compliance with 1501:9-9-05(E)(1)(a-e) at the tank battery with: Well owners address and phone number Property street address or nearest address to the access road entrance. 2) Place landscaping on the south side of the tank battery as required by 1501:9-9-05(E)(6). 3) Install the require gate with a lock at the access road entrance per 1501:9-9-05(E)(2)(c). 4) Post the proper identification sign on the access road gate per 1501:9-9-05(E)(1)(f). 5) Raise the fencing around the tank battery or use low profile tanks to be in compliance with 1501:9-9-05(E)(4)(f). 6) Install locks on all pick-up lines or remove the handles per 1501:9-9-05(E)(3).

0783354296 2012-09-05 Urban Drill / Deepen / Reopen No Violations My inspection found the pits filled and closed.
0808592354 2017-12-18 UrbanProduction Wells No Violations I found the proper urban safety equipment installed on the production tank. PAC still needs to:

Place landscaping on the south side of the tank battery. Install the require gate with a lock at the access road entrance. Post the proper identification sign on the access road gate. Raise the fencing around the tank battery or use low profile tanks. Install locks on all pick-up lines or remove the handles.

1242149039 2012-08-16 UrbanProduction Wells No Violations On 8/16/2012, I witnessed the preforation of this well. P.A.C. Drilling used Appalachian Well Survey to perform the perforations.
1344877747 2012-08-12 Urban Drill / Deepen / Reopen No Violations On 8/12/12, I witnessed the cementing of the 4.5 production casing and the setting of the latch down plug.
1345812841 2012-08-23 Urban Drill / Deepen / Reopen No Violations On 8/23/2012, I inspection the progress of the site after drilling. My inspection found the pits still open. I received a call from Jason Caldwell of P.A.C. Drilling to inform me they will start closing the pits on 8/28/2012.
1406213823 2014-06-26 UrbanPreliminary Restoration No Violations I was on location to perform an urban preliminary restoration. I found during my inspection the well equipped with a plunger lift unit that was in production. The tank battery consisted of a 210 barrel production tank, a 50 barrel, poly brine tank and a separator. A dike surrounded the tank battery. Identification signs were posted a the well and tank battery. Locked, chain link fences surrounded the well and production equipment. The proper safety equipment was installed on the production tank. The site was graded. Vegetation was well established. Drainage and erosion controls were in place. All debris and drilling equipment was removed. The pits were closed. The lease road was in excellent condition.
1834247282 2020-3-27 0:00: UP No Violations
1867996371 2013-05-29 UrbanProduction Wells No Violations My inspection found the well in production. The well was equipped with a plunger lift unit and a domestic gas line. It was surrounded by a chain link fence with no lock. The tank battery contained one, 210 barrel production tank, one, 50 barrel brine tank, and a separator. It was surrounded by a chain link fence with no lock and a dike capable of meeting containment requirements. There was a plug on the load line. An identification sign was posted at the tank battery and wellhead. There was no safety equipment. The lease road was in good condition covered with crushed gravel. I called PAC Drilling at 330-874-3781. I told PAC to install the safety equipment and place locks at both fences.
2112323029 2017-10-11 UrbanProduction Wells Violations Noted

-up lines have plugs, but no locks. The 210 bbl. storage tank has the required urban safety equipment. The identification sign is missing the required information per 1501:9-9-05(E)(1)(a--site inspection. There is no landscaping and it was not waved during the pre-site inspection.

PAC needs to: 1) Correct the identification sign to be in compliance with 1501:9-9-05(E)(1)(a-e) at the tank battery with: Well owners address and phone number Property street address or nearest address to the access road entrance. 2) Place landscaping on the south side of the tank battery as required by 1501:9-9-05(E)(6). 3) Install the require gate with a lock at the access road entrance per 1501:9-9-05(E)(2)(c). 4) Post the proper identification sign on the access road gate per 1501:9-9-05(E)(1)(f). 5) Raise the fencing around the tank battery or use low profile tanks to be in compliance with 1501:9-9-05(E)(4)(f). 6) Install locks on all pick-up lines or remove the handles per 1501:9-9-05(E)(3).

290012650 2018-5-17 0:00: UP No Violations
447796796 2017-9-8 0:00:0 UP No Violations 0.50
496192369 2019-3-8 0:00:0 UP No Violations
85958188 2017-4-24 0:00: UP No Violations 0.60

Violations Commited

Inspection ID Violation ID Violation Date Violation Code Violation Comments
2112323029 US-OH-121601 2017-12-26 ID (a-i)
2112323029 US-OH-121602 2017-12-26 FENCING (a-d)
2112323029 US-OH-121603 2017-12-26 LOCKS
2112323029 US-OH-121604 2017-12-26 LANDSCAPING (a-c)

For data sources see[9]