If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-155-24065 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.38,"lon":-80.9,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Trumbull | |
Municipality: Bristol Township | |
Operator Name: CEDAR VALLEY ENERGY INC | |
Well Pad ID: | |
Farm/Lease Name: LINDOW UNIT | |
License Status: Producing | |
License Date: 2013-02-25 | |
Spud Date: 2013-03-25 | |
Spud Drilling Contractor: POULSON DRILLING | |
Final Drill Date: 2013-03-29 | |
Well Total Depth: 4123.00 ft | |
Configuration: Vertical | |
Latitude: 41.380000 | |
Longitude: -80.900000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2013-02-25 | Proposed Formations:CLINTON, Issued Date:2/25/2013, Expired Date:2/25/2015 12:00:00 PM, Drilling unit acres:64, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2013-03-29 | |
Completion Report Received | 2013-08-19 | |
Correction to Well | 2014-11-28 | UNIT SIZE DECREASED TO 44 ACRES. |
Construction Permit Expires | 2015-02-25 | |
Correction to Well | 2015-03-06 | UNIT SIZE INCREASED TO 93.32 ACRES. |
Record Last Modified | 2018-01-26 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2013-08-20 | 3923 | 3968 | 30 |
3923 | 3968 | 30 | |
3923 | 3968 | 30 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2013-08-07 | H2O | 15 | 79956 Gal | 55700 | Universal Well Services Inc. |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2013 | CEDAR VALLEY ENERGY INC | 59.00 | 157.00 | 365 |
2014 | CEDAR VALLEY ENERGY INC | 5498.00 | 1231.00 | 365 |
2015 | CEDAR VALLEY ENERGY INC | 1634.00 | 481.00 | 365 |
2016 | CEDAR VALLEY ENERGY INC | 2183.00 | 544.00 | 365 |
2017 | CEDAR VALLEY ENERGY INC | 1810.00 | 445.00 | 365 |
2018 | CEDAR VALLEY ENERGY INC | 1507.00 | 364.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2013 | CEDAR VALLEY ENERGY INC | Brine | 365 | 365 |
2014 | CEDAR VALLEY ENERGY INC | Brine | 1470 | 365 |
2015 | CEDAR VALLEY ENERGY INC | Brine | 725 | 365 |
2016 | CEDAR VALLEY ENERGY INC | Brine | 778 | 365 |
2017 | CEDAR VALLEY ENERGY INC | Brine | 813 | 365 |
2018 | CEDAR VALLEY ENERGY INC | Brine | 475 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-557075020 | 2013-4-8 0:00:0 | PW | No Violations | 0.50 |
0557075020 | 2013-04-08 | Production Wells | No Violations | My inspection found the pits solidified and closed. |
0983645547 | 2013-03-25 | Drill / Deepen / Reopen | No Violations | I witnessed PetroSet cement the conductor casing for Cedar Valley. The Poulson Rig drilled hole #1 with a size of 14.75 and to a depth of 82. The conductor was 11.75 and set at 75. PetroSet broke circulation and pumped 115 sacks of Class A cement. They displaced with 7 barrels of fresh water. The plug landed at 12:25 pm. I witnessed a good return of cement to surface. |
1364991762 | 2013-04-03 | Drill / Deepen / Reopen | No Violations | My inspection found Cedar Valley in the process of closing the pits. |
1529815646 | 2013-03-20 | Drill / Deepen / Reopen | No Violations | My inspection found the well pad built. The lease road was compacted and covered with gravel. Part of the lease road was the landowners driveway. Drainage controls were in place with a properly installed silt fence. There was a creek to the north of the well site with a new culvert. An identification sign was posted at the entrance of the lease road. I spoke to the field supervisor, Tim Cosma at 330-853-9565. The Poulson Rig is due to move onto location on 3/25/2013. |
1991669433 | 2014-06-04 | Preliminary Restoration | No Violations | I was on location for a preliminary restoration inspection. I found during my inspection the pumpjack in production. There was a barb wire fence surrounding the pumpjack. The tank battery consisted of a 100 barrel production tank, a 50 barrel brine tank and a separator. A bull plug was installed on the load line. A dike surrounded the tank battery. An identification was properly posted. There was a 7 day production chart at the separator. The well site was properly graded. Vegetation was well established. The lease road was in excellent condition. The pits were closed and all debris removed. Drainage and erosion controls were in place. All drilling equipment was removed from the well site. Preliminary restoration passed. |
983645547 | 2013-3-25 0:00: | DD | No Violations | 1.50 |
For data sources see[9]