If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-155-24068 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.31,"lon":-80.58,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Trumbull | |
Municipality: Hartford Township | |
Operator Name: PIN OAK ENERGY PARTNERS LLC | |
Well Pad ID: US-OH-000703 | |
Farm/Lease Name: BUCKEYE | |
License Status: Producing | |
License Date: 2014-08-28 | |
Spud Date: 2013-06-12 | |
Spud Drilling Contractor: NABORS DRILLING | |
Final Drill Date: 2013-07-12 | |
Well Total Depth: 11512.00 ft | |
Configuration: Horizontal | |
Latitude: 41.310000 | |
Longitude: -80.580000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2013-04-29 | Proposed Formations:UTICA/POINT PLEASANT, Issued Date:4/29/2013, Expired Date:4/29/2015 12:00:00 PM, Drilling unit acres:136.98, Proposed Well Type:OG, Proposed Well Class:EDPW |
Reached Total Depth | 2013-07-12 | |
Correction to Well | 2013-10-04 | CHANGE IN TARGET & TAKE-POINT INFORMATION (FOOTAGE & X,Y COORDINATES) FROM AS DRILLED SURVEY PLAT. |
Completion Report Received | 2013-11-13 | |
APP | 2014-08-28 | Proposed Formations:POINT PLEASANT, Issued Date:8/28/2014, Expired Date:8/27/2016 12:00:00 PM, Drilling unit acres:136.98, Proposed Well Type:OG, Proposed Well Class: |
Change of Owner | 2014-10-06 | Operator changed from 9008, BP AMERICA PRODUCTION COMPANY to 8966, HALCON OPERATING COMPANY INC |
Construction Permit Expires | 2016-08-27 | |
Change of Owner | 2017-09-12 | Operator changed from 8966, HALCON OPERATING COMPANY INC to 9722, PIN OAK ENERGY PARTNERS LLC |
Record Last Modified | 2017-09-12 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2013-11-14 | 7000 | 11280 | 672 |
7000 | 11280 | 672 | |
7000 | 11280 | 672 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 08/18/2013 | 08/21/2013 | 6869 | 4,141,030.0 | 10753 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | BC-140 X2 | Halliburton | Crosslinker | Monoethanolamine borate | 26038-87-9 | 100 | 0.01866 | 7416 |
Ethylene glycol | 107-21-1 | 30 | 0.0056 | 2225 | ||||
BE-9 | Halliburton | Biocide | Tributyl tetradecyl phosphonium chloride | 81741-28-8 | 10 | 0.00436 | 1735 | |
FR-66 | Halliburton | Friction Reducer | Hydrotreated light petroleum distillate | 64742-47-8 | 30 | 0.01511 | 6008 | |
Halliburton | Scale Inhibitor | Ammonium chloride | 12125-02-9 | 10 | 0.00265 | 1055 | ||
OPTIFLO-HTE | Halliburton | Breaker | Crystalline silica, quartz | 14808-60-7 | 30 | 0.00083 | 330 | |
Walnut hulls | Mixture | 100 | 0.00277 | 1100 | ||||
OptiKleen- | Halliburton | Concentrate | Sodium perborate tetrahydrate | 10486-00-7 | 100 | 0.00609 | 2420 | |
LoSurf-300D | Halliburton | Non-ionic Surfactant | Ethanol | 64-17-5 | 60 | 0.05093 | 20243 | |
1,2,4 Trimethylbenzene | 95-63-6 | 1 | 0.00085 | 337 | ||||
Naphthalene | 91-20-3 | 5 | 0.00424 | 1687 | ||||
Poly(oxy-1,2-ethanediyl), alpha-(4-nonylphenyl)-omega-hydroxy-,
branched |
127087-87-0 | 5 | 0.00424 | 1687 | ||||
Heavy aromatic petroleum naphtha | 64742-94-5 | 30 | 0.02546 | 10122 | ||||
100 MESH, SSA-2, BULK (100003676) | Halliburton | Proppant | Crystalline silica, quartz | 14808-60-7 | 100 | 0.67248 | 267300 | |
40/70 White | Halliburton | Proppant | Crystalline silica, quartz | 14808-60-7 | 100 | 5.37183 | 2,135,200.0 | |
SAND - PREMIUM WHITE | Halliburton | Proppant | Crystalline silica, quartz | 14808-60-7 | 100 | 4.58185 | 1,821,200.0 | |
LCA-1 | Halliburton | Solvent | Paraffinic solvent | Proprietary | 100 | 0.00177 | 703 | |
SAND - PREMIUM - 20/40, BULK, SK (101272933) | Halliburton | Proppant | Crystalline silica, quartz | 14808-60-7 | 100 | 2.31156 | 918800 | |
GBW - 30 | Halliburton | Breaker | Carbohydrates | Proprietary | 95 | 0.001 | 399 | |
Hemicellulase enzyme | 9012-54-8 | 15 | 0.00016 | 63 | ||||
Fresh Water | Operator | Carrier/Base Fluid | No MSDS Ingredients | 7732-18-5 | 100 | 86.7834 | 34,494,800.0 | |
WG-36 GELLING AGENT | Halliburton | Gelling Agent | Guar gum | 9000-30-0 | 100 | 0.04309 | 17128 |
For data sources see[4]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2013-08-19 | H2O | 0 | 276730 Gal | 400507 | Halliburton | STAGE 4
60 SHOTS |
2013-08-21 | H2O | 0 | 309892 Gal | 344398 | Halliburton | STAGE 13
60 SHOTS |
2013-08-20 | H2O | 0 | 331370 Gal | 401773 | Halliburton | STAGE 10
42 SHOTS |
2013-08-19 | H2O | 0 | 282312 Gal | 398456 | Halliburton | STAGE 7
42 SHOTS |
2013-08-19 | H2O | 0 | 363359 Gal | 395917 | Halliburton | STAGE 3
60 SHOTS |
2013-08-20 | H2O | 0 | 353738 Gal | 400695 | Halliburton | STAGE 8
42 SHOTS |
2013-08-19 | H2O | 0 | 355221 Gal | 401714 | Halliburton | STAGE 5
60 SHOTS |
2013-08-19 | H2O | 0 | 355436 Gal | 404325 | Halliburton | STAGE 6
60 SHOTS |
2013-08-18 | H2O | 0 | 352470 Gal | 592700 | Halliburton | STAGE 1
60 SHOTS |
2013-08-20 | H2O | 0 | 339780 Gal | 401529 | Halliburton | STAGE 9
60 SHOTS |
2013-08-20 | H2O | 0 | 248742 Gal | 388518 | Halliburton | STAGE 12
42 SHOTS |
2013-08-18 | H2O | 0 | 259475 Gal | 400800 | Halliburton | STAGE 2
42 SHOTS |
2013-08-20 | H2O | 0 | 312502 Gal | 401463 | Halliburton | STAGE 11
42 SHOTS |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2013 | BP AMERICA PRODUCTION COMPANY | 20322 | 378 | 75 |
2014 | HALCON OPERATING COMPANY INC | 133732 | 1762 | 294 |
2015 | HALCON OPERATING COMPANY INC | 89004 | 417 | 197 |
2016 | HALCON OPERATING COMPANY INC | 10023 | 39 | 15 |
2017 | PIN OAK ENERGY PARTNERS LLC | 118037 | 178 | 255 |
2018 | PIN OAK ENERGY PARTNERS LLC | 121383 | 336 | 360 |
2019 | PIN OAK ENERGY PARTNERS LLC | 38631 | 137 | 90 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2013 | BP AMERICA PRODUCTION COMPANY | Brine | 2203 | 75 |
2014 | HALCON OPERATING COMPANY INC | Brine | 3631 | 294 |
2015 | HALCON OPERATING COMPANY INC | Brine | 1037 | 197 |
2016 | HALCON OPERATING COMPANY INC | Brine | 2 | 15 |
2017 | PIN OAK ENERGY PARTNERS LLC | Brine | 223 | 255 |
2018 | PIN OAK ENERGY PARTNERS LLC | Brine | 534 | 360 |
2019 | PIN OAK ENERGY PARTNERS LLC | Brine | 70 | 90 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1109458884 | 2013-7-29 0:00: | DD | No Violations | 1.00 |
-1188359609 | 2014-11-18 0:00 | PL | No Violations | 0.50 |
-1671715535 | 2019-3-25 0:00: | PW | No Violations | |
-1757567883 | 2020-9-9 0:00:0 | PW | No Violations | |
-1883133202 | 2013-6-23 0:00: | DD | No Violations | 8.50 |
-2078702450 | 2013-6-7 0:00:0 | ND | No Violations | 1.50 |
-524980425 | 2017-10-17 0:00 | PW | No Violations | 0.30 |
-581540148 | 2013-7-16 0:00: | DD | No Violations | 0.50 |
0053577771 | 2013-07-25 | Drill / Deepen / Reopen | No Violations | My inspection found Nabors M05 drilling at a current depth of 5,438. The drilling permit was posted in the companymans trailer; no violations at this time. |
0060878580 | 2015-04-27 | Production Wells | No Violations | I meet with the Federal EPA at this location. They performed an Air Quality Inspection of the well and tank battery. I performed a status check of the tank battery and well head. ID signs are posted. No violations were noted at this time. |
0130170855 | 2013-05-23 | Not Drilled | No Violations | My inspection found BP had added a soil stabilizer to the well pad. Some equipment has been positioned. Grass was growing on the topsoil stockpiles surrounding the well pad. All drainage and erosion controls are in place and working properly; no violations at this time. |
0349320928 | 2013-06-24 | Drill / Deepen / Reopen | No Violations | My inspection found the cement static at surface. BP and Nabors M07 performing rig maintenance; no violations at this time. |
0524980425 | 2017-10-17 | Production Wells | No Violations | I found the well in production on the day of my inspection. The production equipment and well are in good repair. The proper identification signs are post at the well pad and at the entrance. The access road is in good repair with a locked gate at the entrance. Pin Oak Energy took ownership on 9/12/2017. |
0581540148 | 2013-07-16 | Drill / Deepen / Reopen | No Violations | My inspection found BP rigging down Nabors M07 and moving equipment to the Zerovich #1 in Mecca Twp.; no violations at this time. |
0630403479 | 2013-07-22 | Drill / Deepen / Reopen | No Violations | My inspection found Brammer had reached total depth of 5,090 RKB (Kelly) for Hole #3. Currently, Nabors M05 and Brammer were performing rig maintenance and waiting on the proper landing joint to arrive; no violations at this time. |
0789980084 | 2013-06-13 | Drill / Deepen / Reopen | No Violations | I witnessed Halliburton cement the conductor casing for BP. Patterson Rig 256 drilled a 24 Hole #1 to 533 from RKB (Kelly). The operator set the 20 casing to 522 RKB. The conductor casing had a grade of H-40, 94 lbs. per ft., and averaged 44 in length. Halliburton established circulation with 5 bbls of fresh water. The operator pumped 50 bbls of 6% gel spacer followed by 420 sacks of Bondcem System cement. The cement was displaced to 475 using 179 bbls of fresh water. I witnessed approximately 52 bbls of good cement returned to surface. Cement was static at surface after 20 minutes. Cement was sampled and weighed three separate times; at the beginning, middle, and end of the operation. |
0962072994 | 2013-10-25 | Production Wells | No Violations | My inspection found BP flaring off flash gas from the production tanks. The tank battery contained a 500 barrel and five, 400 barrel production tanks surrounded by a steel dike. The dike was lined and had a layer of pea gravel. |
0968078940 | 2013-06-18 | Drill / Deepen / Reopen | No Violations | My inspection found the Nabor M07 had changed over from air drilling to fluid. The current depth was 1,622; there are no violations at this time. |
1109458884 | 2013-07-29 | Drill / Deepen / Reopen | No Violations | My inspection found a 6 inch water line being installed to frac the well. The drainage and erosion control were in good, stable condition; no violations at this time. |
1188359609 | 2014-11-18 | Preliminary Restoration | No Violations | I was on location for a Preliminary Restoration. During my inspection, I found all of the drill equipment removed from the location. The site was graded. The berms around the well site were in stable condition and vegetated. The well was equipped with a production tree. The tank battery consisted of five, 400 barrel production tanks and a 500 barrel production tank. A steel dike surrounded the tanks. There was a compressor and emergency flare. No pits were used to drill the well. All debris was removed. Drainage and erosion controls were in place and working properly. The lease road was in great condition with two locked gates. |
130170855 | 2013-5-23 0:00: | ND | No Violations | 0.50 |
1373470935 | 2013-07-08 | Drill / Deepen / Reopen | No Violations | My inspection found the Nabors M07 drilling at a depth of 7,228; no violations at this time. |
1472132483 | 2016-08-25 | Production Wells | No Violations | I was on location for a status check. My inspection found the access road is in good repair. The entrance gate at Route 305 and the gate next to the well pad are locked. Identification signs are posted at the access road entrance and tank battery. The pad is fenced and all man doors are locked. The #1H is not in production. The well is equipped with a christmas tree valve assembly and partially rapped in insulation. There is a steel dike around the storage tanks.
The equipment on the pad consists of the following: 6 Storage tanks Five 400 bbl. One 500 bbl. 1 Vapor recovery unit (VRU) 1 Gas processing unit (GPU) 1 Production well on the pad Site fenced and man doors locked |
1527610773 | 2018-05-29 | Production Wells | No Violations | At the time of this inspection, the valves on the annulus were open. Production records for this well were current. The production equipment was in good repair. The proper identification signs are post at the well pad and at the entrance. The lease access was stable. There was a locked gate at the entrance. No violations observed. |
1606528576 | 2013-09-09 | Drill / Deepen / Reopen | No Violations | I received a call from Koreen Burrows, BP Field Environmental Advisor. Koreen stated that all of the grass on the berms surrounding the well pad was killed by a company contracted to kill weeds at all of BPs well locations. Koreen stated the weed killer lasts up to 6 to 8 months. BP plans to reseed the berms by the Spring of 2014. My inspection found all of the grass on the berms dead. The soil in the berms appeared stable. I took photos of the berms. |
1671715535 | 2019-03-25 | Production Wells | No Violations | At the time of this inspection, the well was equipped with a plunger lift assembly and the valves on the well casing and flow line were open. The production equipment was in good repair. The proper identification signs are post at the well pad and at the entrance. The lease access was stable with a locked gate. There was a locked gate at the entrance. No violations observed. |
1720113591 | 2015-08-10 | Production Wells | No Violations | I was on location for a status check. During my inspection, I found the well in production. The wellhead is equipped with a christmas tree. An insulated tarp is wrapped around the wellhead and christmas tree. The tank battery consists of five (5), 400 barrel production tanks, a 500 barrel tank, a heat, treat separator, and a vapor recovery unit. The six (6) tanks are positioned in a steel, lined dike with pea gravel. All of the load lines are encased in locked, plastic boxes. An identification sign is posted at the entrance. The lease road is in stable condition. |
1847871639 | 2016-02-24 | Production Wells | No Violations | I was on location for a status check. My inspection found the access road is in good repair. Identification signs are posted at the access road entrance. The pad is fenced and all man doors are unlocked. The #1H is in production. The well is equipped with a christmas tree valve assembly. There is a steel dike around the storage tanks.
The equipment on the pad consists of the following: 6 Storage tanks Five 400 bbl One 500 bbl 1 Vapor recovery unit (VRU) 1 Gas processing unit (GPU) 1 Production well on the pad Site fenced and man doors unlocked I called and spoke with Zane Oshurac from Halcon. I instructed Mr. Oshurac to secure all man doors with locks and post an identification sign at the well. |
1883133202 | 2013-06-23 | Drill / Deepen / Reopen | No Violations | I witnessed Halliburton cement the surface casing for BP. Nabors M07 drilled a 17.5 Hole #2 to 2,988 RKB (Kelly) and set 13.375 surface casing to 2,980 RKB. The casing was 61 lbs/ft and a grade of J-55. Halliburton established circulation with 5 bbls of fresh water. The operator pumped 50 bbls of 6% Gel Spacer followed by 1,270 sacks of Bondcem System cement. When Halliburton reached 330 bbls during the displacement out of 440 bbls; the surface casing began to lift out of the hole. Nabors M07 used the top drive to push the casing down, then held it in place. Halliburton slowed down the displacement pump rate due to the casing lifting. After 357 bbls of displacement, cementing operations was shut down due to pressure climbing to high at the pump truck. I witnessed 6 bbls of good cement returned to surface. Halliburton bled off pressure to the pump truck and the floats held static for 5 minutes. Approximately 641 of cement was left in the casing. After 20 minutes, cement was static a surface. Cement was sampled and weighed three separate times; at the beginning, middle, and end of the operation. All cement sample met density requirements. |
1992601560 | 2018-01-04 | Production Wells | No Violations | I conducted an inspection on this well site with DOGRM inspector John Fleming. At the time of this inspection, the valves on the annulus were open. Production records for this well were current. The production equipment was in good repair. The proper identification signs are post at the well pad and at the entrance. The lease access was stable with a locked gate at the entrance. No violations observed. |
2078702450 | 2013-06-07 | Not Drilled | No Violations | I attended a pre-spud meeting lead by BP. The meeting included an updated casing program that was approved by Columbus and an estimated timeline for the well from start to finish. I walked the entire well pad; drainage and erosion controls were in place and working properly. |
349320928 | 2013-6-24 0:00: | DD | No Violations | 1.00 |
53577771 | 2013-7-25 0:00: | DD | No Violations | 1.00 |
60878580 | 2015-4-27 0:00: | PW | No Violations | 1.00 |
630403479 | 2013-7-22 0:00: | DD | No Violations | |
789980084 | 2013-6-13 0:00: | DD | No Violations | 7.50 |
962072994 | 2013-10-25 0:00 | PW | No Violations | 0.50 |
968078940 | 2013-6-18 0:00: | DD | No Violations | 0.50 |
For data sources see[10]