If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-155-24072 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.21,"lon":-80.89,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Trumbull | |
Municipality: Warren Township | |
Operator Name: PIN OAK ENERGY PARTNERS LLC | |
Well Pad ID: US-OH-000750 | |
Farm/Lease Name: LUTZ | |
License Status: Drilling | |
License Date: 2015-06-10 | |
Spud Date: 2013-07-16 | |
Spud Drilling Contractor: | |
Final Drill Date: | |
Well Total Depth: | |
Configuration: Horizontal | |
Latitude: 41.210000 | |
Longitude: -80.890000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2013-06-10 | Proposed Formations:POINT PLEASANT, Issued Date:6/10/2013, Expired Date:6/10/2015 12:00:00 PM, Drilling unit acres:159.99, Proposed Well Type:OG, Proposed Well Class:EDPW |
Correction to Well | 2013-06-14 | CORRECTION TO FOOTAGES (TARGET & SURFACE) |
APP | 2014-06-20 | Proposed Formations:POINT PLEASANT, Issued Date:6/20/2014, Expired Date:6/19/2016 12:00:00 PM, Drilling unit acres:159.99, Proposed Well Type:OG, Proposed Well Class:EDPW |
APP | 2015-06-10 | Proposed Formations:POINT PLEASANT, Issued Date:6/10/2015, Expired Date:6/9/2017 12:00:00 PM, Drilling unit acres:159.99, Proposed Well Type:OG, Proposed Well Class:EDPW |
Construction Permit Expires | 2016-06-09 | |
Change of Owner | 2017-09-12 | Operator changed from 8966, HALCON OPERATING COMPANY INC to 9722, PIN OAK ENERGY PARTNERS LLC |
Record Last Modified | 2017-10-23 |
For data sources see[2]
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1923689513 | 2013-7-16 0:00: | DD | No Violations | 1.00 |
1374678766 | 2013-07-17 | Drill / Deepen / Reopen | No Violations | I witnessed Halliburton cement the conductor casing for Halcon. Lightning Energy Auger Rig SR30 drilled a 36 Hole #1 to 82 GL (ground level) and set 30 casing to 82 GL. The weight of the casing was 157.5 lbs/ft. Halliburton established circulation with 2 bbls of fresh water. The operator pumped 20 bbls of 6% Gel Spacer followed by 5 bbls of fresh water spacer. Halliburton pumped 370 sacks of Halcem System cement, then displaced the cement to 52 with 46 bbls of fresh water. I witnessed approximately 26 bbls of good cement returned to surface. A cement sample was taken at the middle of the operations; cement met density requirements. |
1549592595 | 2016-02-24 | Drill / Deepen / Reopen | No Violations | I was on location for a status check. My inspection found the access road is in good repair. An identification sign at the access road entrance has fallen over. The pad is fenced and all man doors are locked. The conductor for the #1H well has been drilled.
The equipment on the pad consists of the following: 1 Conductor Site fenced and man doors locked I called and spoke with Zane Oshurac from Halcon. I instructed Mr. Oshurac to repair the identification sign at the entrance. |
1741495506 | 2018-04-25 | Drill / Deepen / Reopen | No Violations | I was on location with Northeast Regional Supervisor Steve Ochs. I found the well pad secure with fencing around the entire location and a locked gate. An identification sign is posted at the access road entrance. There is no evidence of recent activity. The conductor was set and cemented on July 17, 2013. The RBDMS database shows Pin Oak Energy took ownership of the well on September 12, 2017. |
1906048046 | 2016-08-11 | UrbanProduction Wells | No Violations
| |
1923689513 | 2013-07-16 | Drill / Deepen / Reopen | No Violations | My inspection found Lightning Energy Auger Rig SR30 drilling the conductor hole for Halcon. Their current depth was 43 GL (ground level); no violations at this time. |
For data sources see[3]