Well ID: 34-155-24074 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.37,"lon":-80.87,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Trumbull | |
Municipality: Bristol Township | |
Operator Name: CEDAR VALLEY ENERGY INC | |
Well Pad ID: | |
Farm/Lease Name: SHIPMAN UNIT | |
License Status: Producing | |
License Date: 2013-06-28 | |
Spud Date: 2013-08-13 | |
Spud Drilling Contractor: POULSON DRILLING | |
Final Drill Date: 2013-08-16 | |
Well Total Depth: 4187.00 ft | |
Configuration: Vertical | |
Latitude: 41.370000 | |
Longitude: -80.870000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2013-06-28 | Proposed Formations:CLINTON, Issued Date:6/28/2013, Expired Date:6/28/2015 12:00:00 PM, Drilling unit acres:40, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2013-08-16 | |
Completion Report Received | 2013-09-13 | |
Construction Permit Expires | 2015-06-28 | |
Record Last Modified | 2018-01-26 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2013-09-16 | 3990 | 4043 | 47 |
3990 | 4043 | 47 | |
3990 | 4043 | 47 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2013-09-03 | H2O | 15 | 83794 Gal | 50000 | Universal Well Services Inc. |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2013 | CEDAR VALLEY ENERGY INC | 865.00 | 645.00 | 365 |
2014 | CEDAR VALLEY ENERGY INC | 5503.00 | 2255.00 | 365 |
2015 | CEDAR VALLEY ENERGY INC | 1876.00 | 1040.00 | 365 |
2016 | CEDAR VALLEY ENERGY INC | 2141.00 | 887.00 | 365 |
2017 | CEDAR VALLEY ENERGY INC | 2233.00 | 659.00 | 365 |
2018 | CEDAR VALLEY ENERGY INC | 1722.00 | 565.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2013 | CEDAR VALLEY ENERGY INC | Brine | 491 | 365 |
2014 | CEDAR VALLEY ENERGY INC | Brine | 1289 | 365 |
2015 | CEDAR VALLEY ENERGY INC | Brine | 790 | 365 |
2016 | CEDAR VALLEY ENERGY INC | Brine | 736 | 365 |
2017 | CEDAR VALLEY ENERGY INC | Brine | 428 | 365 |
2018 | CEDAR VALLEY ENERGY INC | Brine | 376 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1139557586 | 2013-11-6 0:00: | PL | No Violations | 0.50 |
-407310137 | 2019-8-20 0:00: | PW | No Violations | |
-656849302 | 2019-3-13 0:00: | PW | No Violations | 0.50 |
0656849302 | 2019-03-13 | Production Wells | No Violations
-3953. No violations observed. | |
0665105056 | 2013-08-09 | Drill / Deepen / Reopen | No Violations | My inspection found Poulson reached total depth of 4,187 on 8/17/2013. The 4.5 production casing was set at 4,185 and cemented on 4,185 with 150 sacks of Unitropic Cement by Universal Well Service. |
0988420784 | 2016-08-22 | Production Wells | No Violations
-3953. The equipment on the site consists of the following:
| |
1139557586 | 2013-11-06 | Preliminary Restoration | No Violations | My inspection found the well site graded. Vegetation was established. The pit was closed and filled. All debris was removed. Drainage and erosion controls were in place. The tank battery consisted of two, 100 barrel production tanks, a 50 barrel brine tank, and a separator. The well shared a tank battery location with permit number 2-3953. The proper identification sign was posted at the well and production tank. The lease road was in good, working condition with crushed limestone. |
1376474627 | 2013-08-14 | Drill / Deepen / Reopen | No Violations | I witnessed PetroSet cemented the surface casing for Cedar Valley. Poulson Drilling drilled a 11 Hole #2 to 317 RKB and set 8.625 casing to 305 RKB. PetroSet established circulation with 2 bbls of fresh water. The operator pumped 100 sacks of Class A Lite cement, followed by 50 sacks of Class A cement. The cement was displaced to 285 with 18 bbls of fresh water. I witnessed approximately 16 bbls of good cement returned to surface. |
2077003660 | 2013-08-28 | Drill / Deepen / Reopen | No Violations | My inspection found the pits closed and graded. Cedar Valley used 75 tons of Kiln Dust to solidify the pits. While on site, I witnessed Appalachian Well Service perforate the well for Cedar Valley. The top perforation was at 3,990 and the bottom was at 4,043. |
665105056 | 2013-8-9 0:00:0 | DD | No Violations | 0.50 |
988420784 | 2016-8-22 0:00: | PW | No Violations | 0.30 |
For data sources see[9]