Well Details

Well ID: 34-155-24079
Loading map...
Country: United States
State: Ohio
County: Trumbull
Municipality: Vienna Township
Operator Name: KTCA HOLDINGS LLC
Well Pad ID:
Farm/Lease Name: B & J NO 1 INJECTION (SWIW #33)
License Status: Active Injection
License Date: 2013-08-20
Spud Date: 2015-08-20
Spud Drilling Contractor: WILDCAT DRILLING
Final Drill Date: 2015-09-05
Well Total Depth:
Configuration: Vertical
Latitude: 41.240000
Longitude: -80.660000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2013-08-20 Proposed Formations:KNOX - MT SIMON SANDSTONE, Issued Date:8/20/2013, Expired Date:8/20/2015 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:SWD, Proposed Well Class:SWIW
Construction Permit Expires 2015-08-20
Reached Total Depth 2015-09-05
Change of Owner 2015-10-09 Operator changed from 2655, KLEESE DEVELOPMENT ASSOCS to 9534, KTCA HOLDINGS LLC
Completion Report Received 2015-11-27
Record Last Modified 2017-02-10

For data sources see[2]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2015-09-23 H2O 20 17400 Bbl 0 Producers Service Corporation

For data sources see[3]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1099919619 2017-2-16 0:00: SW No Violations
-1244769750 2015-7-14 0:00: SW No Violations
-1273342813 2015-10-8 0:00: DD No Violations 2.00
-1290141503 2020-4-27 0:00: SW No Violations 1.60
-1438313596 2018-3-28 0:00: SW No Violations 0.70
-146374289 2018-12-27 0:00 SW No Violations 0.90
-1503501056 2018-1-11 0:00: SW No Violations 2.00
-1531363535 2018-11-27 0:00 SW No Violations 1.50
-1687939573 2019-12-24 0:00 SW No Violations 0.30
-1704104916 2016-7-22 0:00: SW No Violations
-1727853444 2015-9-3 0:00:0 SW No Violations
-1764066196 2015-9-1 0:00:0 DD No Violations
-1767865252 2016-11-22 0:00 SW No Violations
-1809431495 2015-8-24 0:00: DD No Violations 1.00
-1855551098 2019-9-27 0:00: SW No Violations 0.40
-1910927979 2018-1-17 0:00: SW No Violations 0.50
-1932755338 2015-10-8 0:00: PL No Violations
-1936800081 2016-6-30 0:00: SW No Violations 2.00
-1953092253 2015-8-17 0:00: SW No Violations
-2032614474 2015-8-29 0:00: UD No Violations
-2034812136 2015-8-21 0:00: DD No Violations
-2118727582 2016-2-23 0:00: SW No Violations 1.50
-2128666891 2018-5-2 0:00:0 SW No Violations 0.50
-260125705 2017-2-15 0:00: SW No Violations
-325871701 2017-2-23 0:00: SW No Violations
-350512388 2019-1-9 0:00:0 SW No Violations 0.70
-363801742 2015-8-23 0:00: DD No Violations
-371492289 2017-11-8 0:00: SW No Violations 0.50
-409141445 2015-10-16 0:00 DD No Violations 1.00
-428382169 2016-8-9 0:00:0 SC No Violations
-429324553 2019-7-11 0:00: SW No Violations 1.00
-500907642 2015-9-9 0:00:0 SW No Violations
-648280169 2017-2-9 0:00:0 SW No Violations
-680824354 2016-1-27 0:00: SW No Violations 1.00
-72108777 2016-3-25 0:00: SW No Violations 1.00
-818878723 2015-8-31 0:00: DD No Violations
-972456180 2016-3-29 0:00: SW No Violations 1.00
0066407184 2017-02-25 Salt Water Injection Well No Violations The redressed Arrow Lok-Set Packer was set in compression at 7725 feet. The well passed a mechanical integrity test. A pressure of 1861pounds per square inch (psi.) was placed on the tubing/casing annulus. There was a pressure loss of 10 psi. observed during the fifteen minute test period.
0072108777 2016-03-25 Salt Water Injection Well No Violations At the time of my inspection, I found Crescent Energy on location laying out the liner on the northern area of facility. The liner seams have been properly sealed.
0146374289 2018-12-27 Salt Water Injection Well No Violations I found the injection well in operation on the day of my inspection. There were facility operators on location. I observed no spills or leaks. Identification signs are posted. While on location, Castelli Oil & Gas (#25-528), McKissick Trucking (#25-422), and Wicklow Logistic (#25-639) brine trucks arrived on location with the proper UIC number, company names, and company phone numbers displayed.
0160927544 2015-10-09 Preliminary Restoration No Violations The solidified drilling pits were completely excavated and the mixed material was placed inside the disposal pit. The drilling pits were being backfilled. All conditions were acceptable.
0173107134 2017-02-24 Salt Water Injection Well No Violations The redressed Arrow Lok-Set Packer was ran back into the well.
0190006507 2016-10-27 Salt Water Injection Well No Violations The injection well and surface facility were inspected. The pump was not operating at the time. There were no violations found.
0238660210 2015-08-17 Drill / Deepen / Reopen No Violations I was on location for a status check. During my inspection, I found KDA has properly installed a 4 cellar for the new UIC well to be drilled by Wildcat Drilling. The cellar has been grouted in place. The well pad is equipped with compacted slag. Wildcat Drilling will be moving onto location by 8/19/2015.
0260125705 2017-02-15 Salt Water Injection Well No Violations The inspection was a result of a complaint (Complaint No. 5533). The complaint involved frac tanks on location. The tanks were needed for additional water storage, while service work was performed on the well. A service rig was rigging up on the well at the time. All conditions were acceptable.
0307900009 2015-10-07 Preliminary Restoration No Violations The pit solidification operation was underway. A disposal pit was excavated adjacent to the drilling pits. The material inside the drilling pits was mixed with kiln dust and placed inside the lined disposal pit. All conditions were acceptable.
0325871701 2017-02-23 Salt Water Injection Well No Violations The service rig was tripping out the tubing string used for the clean out work.
0348285569 2016-08-17 Surface Facility Construction No Violations The injection well and surface facility were inspected. A pressure shut-off switch has been installed on the injection line. All construction conditions have been met.
0350512388 2019-01-09 Salt Water Injection Well No Violations I found the injection well was operating on the day of my inspection. There were facility operators on location. I observed no spills or leaks. While on location, three (3) Evolution Energy brine trucks arrived on location with the proper identification displayed (#25-609).
0352939280 2015-08-20 Drill / Deepen / Reopen No Violations I arrived on location at 2:25 pm for a status check. During my inspection, I found Wildcat had spudded the conductor hole. The current depth is 20 using a 14 bit. Wildcat will ream the hole twice using a 16 and 22 bit. All of the pits are properly lined and in good condition.
0363801742 2015-08-23 Drill / Deepen / Reopen No Violations The blow out preventer (BOP) and surface casing were pressure tested. A pressure of 500 psi. was used for the test. During the 30 minute test period, a 40 psi. loss was observed. Although, there was a visible leak where the BOP threaded onto the casing. The test passed with an 8% loss.
0371492289 2017-11-08 Salt Water Injection Well No Violations I found the UIC facility in good repair on the day of my inspection. Facility operator was on location and the injection well was in operating. The storage tanks are set in a concrete dike. I observed no leaks or spill. The proper identification is posted. There were five (5) brine trucks on location with the proper UIC brine #528. There are no violations at this time.
0409141445 2015-10-16 Drill / Deepen / Reopen No Violations I was on location for a status check. At the time of my inspection, the pits have been closed. The well site is graded. There is a locked gate at the entrance. An identification sign is posted.
0424748874 2015-08-19 Drill / Deepen / Reopen No Violations I was on location for a status check. During my inspection, I found Wildcat Drilling moving onto location. I observed KDA digging the pits. There is an identification sign posted at the entrance to the well pad.
0428382169 2016-08-09 Surface Facility Construction No Violations The surface facility was inspected. The pressure shut-off switch was not installed at the time.
0491074566 2015-08-21 Drill / Deepen / Reopen No Violations I was on location at 830 am for a status check. During my inspection, I found Wildcat reaming the conductor hole with a 22 bit. Current depth of the bit is 173 and the hole depth is 189. I observed KDA has surrounded all of the pits with orange fencing.
0500907642 2015-09-09 Salt Water Injection Well No Violations Tri-State Wireline Service ran a cement bond log on the 5-1/2 inch casing.
0576253152 2016-12-29 Salt Water Injection Well No Violations The injection well and surface facility were inspected. There were no violations at the time.
0579121939 2015-08-22 Drill / Deepen / Reopen No Violations A total of 601 feet of 11-3/4 inch diameter surface casing was set inside a 16 inch diameter borehole, drilled 650 feet deep. The casing was cemented with 425 sacks of Type-1 cement with 3% Calcium Chloride and 1/4 lb./sk. Cellophane flake. Good cement returns were observed. No problems were encountered.
0628795184 2019-01-28 Salt Water Injection Well No Violations I was location to verify correct UIC numbers on brine haulers. I found no discrepancies during my inspection. There were facility operators on location. While on location, there were five (5) brine truck that arrived to off-load. There were two (2) Wicklow Logistics brine trucks (#25-639), an IPC Services brine truck (#25-654), a Castelli brine truck (#25-528), and a McKissick brine truck (#25-422).
0648280169 2017-02-09 Salt Water Injection Well No Violations The surface facility was inspected. The well was flowing back, in order to perform maintenance work. All conditions were acceptable.
0680824354 2016-01-27 Salt Water Injection Well No Violations I was on location for a status check. During my inspection, I found KTCA laying a 40 mil liner. An automated tool was being used to properly seal the liner sections together. Construction for a concrete pad will begin once the liner is complete. Photos were taken and are available upon request.
0688315172 2015-09-06 Drill / Deepen / Reopen No Violations A total of 8283 feet of 5-1/2 inch diameter surface casing was set inside a 7-7/8 inch diameter borehole, drilled 8354 feet deep. The casing was cemented with 200 sacks of Unipro 171 cement with 0.4% foam block and 150 sacks of SRRC cement. No problems were encountered.
0818878723 2015-08-31 Drill / Deepen / Reopen No Violations The rig was drilling on air at 6406 feet. All conditions were acceptable.
0898869729 2018-02-05 Salt Water Injection Well No Violations I was on location to inspect the UIC well and facility. I found the well operating on the day of my inspection. I observed no leaks or spills. The facility is in good repair. Identification signs are posted. The PVC piping for the sump pit in the concrete dike has not been repaired at this time. The facility operator stated repairs will be completed once the weather improves.
0972456180 2016-03-29 Salt Water Injection Well No Violations At the time of my inspection, I found Crescent Energy has finish laying out the liner on the northern area of the facility and has moved to the western area. KTCA has placed 2-
1024484355 2015-08-20 Drill / Deepen / Reopen No Violations I was on location for a status check. During my inspection, I found Wildcat completing their rig assembly. The front pit has been dug and properly lined. KDA is digging the two (2) back pits. I observed new 16 casing on the rack.
1099919619 2017-02-16 Salt Water Injection Well No Violations The packer was released. A service rig was in the process of pulling the tubing. All conditions were acceptable.
1109966803 2018-01-05 Salt Water Injection Well No Violations I was on location to follow--564, McKissisk: 25-422, Wicklow: 25-639).
1114605163 2018-01-04 Salt Water Injection Well No Violations

-528: Castelli and 25-639: Wicklow Logistic Inc.).

The facility operator stated: Heat tape/blanks were on order to help prevent further freezing of PVC drain lines.


I spoke with the Fire Department Chief for Vienna Township and updated him concerning my inspection.

1155796165 2018-11-08 Salt Water Injection Well No Violations I found the injection well operating on the day of my inspection. KTCA has completed cleaning all of the storage tanks and are still winterizing facility. I observed no leaks or spills. There were two (2) brine trucks off-loading on location with the proper UIC numbers displayed (#25-422: McKissick and #25-668: Maverick Trucking).
1223230142 2019-03-19 Salt Water Injection Well No Violations I was on location to assess Compliance Notice 1553000107. I found the injection well not operating during my inspection. Upon gauging the injection tubing, I received a reading of 1,550 psi which is below the maximum allowable pressure. There are no further violations at this time.
1244769750 2015-07-14 Salt Water Injection Well No Violations There was no drilling equipment onsite. All conditions were acceptable.
1273342813 2015-10-08 Drill / Deepen / Reopen No Violations I was on location with ODNR UIC Inspector Steve Ochs for a status check. During my inspection, I found KDA solidifying the pits and preparing the well site for building the UIC facility. No violations at this time.
1300358708 2015-08-24 Drill / Deepen / Reopen No Violations I arrived on location at 9 am. During my inspection, I found Wildcat drilling the third hole for the intermediate casing. Their current depth was 1,787 from rig floor (RF).
1347906598 2017-02-21 Salt Water Injection Well No Violations The service rig was on the well. The well had been treated with acid and was shut-in at the time. All conditions were acceptable.
1360551046 2016-04-04 Salt Water Injection Well No Violations At the time of my inspection, I found the liner completed over the middle section of the facility. The liner joints have been properly heat welded together. KTCA has contracted FCI to pour concrete for the tank battery and access road.
1438313596 2018-03-28 Salt Water Injection Well No Violations

-up inspections will continue.

1440422367 2015-08-21 Drill / Deepen / Reopen No Violations I was on location to witness Universal Well Service cement the conductor casing for Kleese Development Associates (KDA). Wildcat Drilling drilled a 22 hole to 189 at ground level (GL) and set the 16 conductor casing at 146 GL. Rig floor is 10 above GL. The casing is 65 lbs per ft with an API rating of H-40. Next, Wildcat circulated on the well for one hour prior to cementing. Universal rigged up and established circulation. The operator pumped 500 lbs of gel and a 5 bbls water spacer followed by 442 sacks of Class A cement. The cement was displaced to 136 GL with 30 bbls of fresh water. I witnessed 35 bbls of good cement returned to surface. After 20 minutes, the cement held static at surface.
1441886232 2015-08-26 Drill / Deepen / Reopen No Violations I was on location for a status check. During my inspection, I found Wildcat tripping out of the intermediate hole. The bit has laid down. The current depth is 2,795. I observed the pits are in good condition.
1442319018 2015-09-04 Drill / Deepen / Reopen No Violations I was on location for a status check. During my inspection, I found Wildcat currently drilling at a depth of 7,984. Pits are lined and in good condition. Permit is posted in the doghouse.
1444043816 2015-08-28 Drill / Deepen / Reopen No Violations I was on location to witness Universal Well Service cement the intermediate casing for Kleese Development Associates (KDA). Wildcat Drilling drilled a 11 hole to 5,218 at ground level (GL) and set 8.625 casing to 5,095 GL. The casing is 32 lbs/ft with a grade of L-80. There is a superseal guide shoe and float install on the bottom of the casing. Wildcat established circulation two hours prior to cementing. Universal rigged up and established circulation. Universal mixed and pumped 350 sacks of 50/50 pos lead cement with a yield of 1.29 followed by 280 sacks of Gas Block Stop tail cement with a yield of 1.55. Universal landed the plug and pressured up to 1,704 psi for five minutes. Pressure on the plug held static for the duration of the test.
1455132246 2016-02-01 Salt Water Injection Well No Violations I was on location for a status check. During my inspection, I found forms in place to pour concrete tomorrow for the tank battery pad.
1462447656 2016-05-04 Salt Water Injection Well No Violations At the time of my inspection, I found KTCA has completed the concrete dike for the tank pad. Contractors were on site working on the footers and foundation for the office and pump house. Concrete footers are in place for a canopy at the unloading area. There are no violations at this time.
1500567611 2017-07-12 Salt Water Injection Well No Violations An inspection of the injection well and surface facility found no violations.
1503501056 2018-01-11 Salt Water Injection Well No Violations I was on location to inspect the UIC facility. I found the facility operator on location. All of the frozen piping has thawed out. The brine and oil residue has been pumped into a storage tank. The facility operator stated the PVC drain line for the sump pit that froze needs replaced due to breaking during the extreme cold temperatures. There are no further issues at this time.
1505994258 2017-09-20 Salt Water Injection Well No Violations I found the injection well and the UIC facility in good repair on the day of my inspection. There are no violations at this time.
1512749879 2017-12-07 Salt Water Injection Well No Violations I found KTCA has plumbed new fittings, needle valves, and 3,000 psi gauges outside of the structure covering the injection well. I met with Keith Thompson from KTCA. I observed several trucks from three (3) different brine hauling companies on location, each with the proper brine number displaced on the side of the trucks (#528 - Castelli, #564 - AIM Services, #639 - Wicklow). There are no violations at this time.
1528558455 2018-07-23 Salt Water Injection Well No Violations I found the injection well in operation during my inspection. I observed no leaks or spills. Identification signs are posted. There was a facility operator on location.
1531363535 2018-11-27 Salt Water Injection Well No Violations I was on location to verify proper brine truck identification. I observed six (6) brine trucks enter the facility with the proper UIC number, company name, and phone number displayed. There were two (2) Castelli Oil and Gas (#25-528) brine trucks and four (4) McKissick Trucking (#25-422) brine trucks that arrived on location. I found the injection well operating on the day of my inspection. There were facility operators on location. Identification signs are posted.
1536170972 2018-09-05 Salt Water Injection Well No Violations I found the injection well operating on the day of my inspection. There were facility operators on location. The facility is in good repair. I observed no leaks or spills. Identification signs are posted.
1541089938 2018-11-01 Salt Water Injection Well No Violations I found the injection well operating on the day of my inspection. The facility manager and operator were on location. I observed no spills or leaks. KTCA was working on winterization of the facility. Two (2) McKissick Trucking Inc. brine trucks arrived on location with the proper UIC numbers displayed (#25-422). Identification signs are posted.
1553000107 2019-03-18 Salt Water Injection Well No Violations I found the injection well operating during my inspection. Upon gauging the injection tubing, I received a reading of 2,220 psi which is over the maximum allowable pressure. I informed the facility operator to shut down the injection well. The facility operator immediately shut down the injection well. Once the injection pump was shut down, the injection well pressure dropped to 1,320 psi. According to the facility operator, KTCA has had issues with the gauges reading high when the Murphy Switch read below the maximum allowable pressure. After waiting five (5) minutes with the pressure static at 1,320, the facility operator turned the injection pump back on. Once the injection pump was up to pressure, my gauge topped out at a reading of 1,380 psi. After waiting 15 minutes, the pressure held static at 1,380 psi. I told the facility operator follow-up inspections will be conducted to ensure the facility maintains operating under the maximum allowable pressure.
1553521734 2019-3-22 0:00: SW No Violations 2.50
1556548154 2019-4-29 0:00: SW No Violations 1.70
1576086029 2019-12-11 0:00 SW No Violations 0.80
1579709639 2020-1-22 0:00: SW No Violations 3.00
1583154616 2020-2-28 0:00: SW No Violations 1.10
1595885042 2015-09-04 Drill / Deepen / Reopen No Violations The rig was drilling with mud, at 8001 feet. All conditions were acceptable.
160927544 2015-10-9 0:00: PL No Violations
1704104916 2016-07-22 Salt Water Injection Well No Violations A contractor was pumping on the well in order to preform a pressure fall-off test. All conditions were acceptable.
1727853444 2015-09-03 Salt Water Injection Well No Violations The rig was tripping out the bit, at a depth of 7801 feet.
173107134 2017-2-24 0:00: SW No Violations
1764066196 2015-09-01 Drill / Deepen / Reopen No Violations The rig was drilling, on air, at 7140 feet. All conditions were acceptable.
1767865252 2016-11-22 Salt Water Injection Well No Violations The injection well and surface facility were inspected as a result of a complaint. The complainant claimed there was an explosion onsite.

There was no report of an explosion with the local fire department. Onsite, there was no evidence of an explosion. The well tender knew nothing about an explosion. There were no violations found at the time.

1809431495 2015-08-24 Drill / Deepen / Reopen No Violations I was on location for a status check. During my inspection, I found Wildcat actively drilling the intermediate hole. Pits are in good repair.
1814598043 2015-08-18 Salt Water Injection Well No Violations The cellar installation was complete. The frac tanks, on location, were lined up along the perimeter. All conditions were acceptable.
1861192794 2019-6-10 0:00: SW No Violations 1.20
190006507 2016-10-27 0:00 SW No Violations
1910927979 2018-01-17 Salt Water Injection Well No Violations I was on location to inspect the UIC facility. The facility operator was on location and the injection well was in operation on the day of my inspection. I found no further issues with frozen piping due to the recent extreme cold temperature. I observed no spills or leaks. There are no violations at this time.
1932755338 2015-10-08 Preliminary Restoration No Violations A neighbor complained about the dust produced during the pit solidification process. Once the well owner was aware of the complaint, care was taken to prevent airborne dust. An inspection did not find dust leaving the wellsite. There were no violations.
1934338743 2016-07-18 Salt Water Injection Well No Violations The injection line was tested with 1950 psi. of pressure. There was no pressure loss during fifteen minutes.
1936800081 2016-06-30 Salt Water Injection Well No Violations At the time of my inspection, I found KTCA constructing the buildings for the pump house and office. The pumps are in place in the pump house. The catwalk has been installed between the storage tanks. The canopy has been installed for the off-loading area.
1953092253 2015-08-17 Salt Water Injection Well No Violations The cellar was installed. All conditions of the wellsite were acceptable.
1988399841 2015-09-30 Salt Water Injection Well No Violations A mechanical integrity test (MIT) was performed on the newly drilled well. A pressure of 2010 psi. was placed on the tubing-casing annulus. The MIT passed without a loss, during the fifteen minute test period.
2020925693 2019-10-2 0:00: SW No Violations 0.90
2032614474 2015-08-29 Urban Drill / Deepen / Reopen No Violations I was on site to witness the casing integrity test for this saltwater injection well. The test requires a thirty minute hold time and no more than a 10 percent decrease in the pressure over that time. The test started at 4:37 pm with a starting pressure of 1870 psi and ended at 5:07 pm with a final pressure of 1730 psi. During the testing period, I witnessed leaking at the Blow-out preventor (BOP) threads. It was observed during the thirty minutes that the pressure decrease was not greater than 10 percent. The casing integrity test was passed.
2034812136 2015-08-21 Drill / Deepen / Reopen No Violations The drilling contractor was reaming the conductor hole with a 22 inch bit. All conditions were acceptable.
2118727582 2016-02-23 Salt Water Injection Well No Violations I was on location for a status check. During my inspection, I found Hall & Associates on location installing nine monitoring wells around the site. There are no violation at this time.
2128666891 2018-05-02 Salt Water Injection Well No Violations I was on location for an UIC facility inspection. The injection well was in operation on the day of my inspection. A facility operator was on location. Identification signs are posted. There are no violations at this time.
2130429023 2015-09-15 Drill / Deepen / Reopen No Violations I was on location for a status check. During my inspection, I found Wildcat Drilling rigging down and moving off location. Pits shall be closed by 11/15/2015. Follow-up inspection will be conducted.
238660210 2015-8-17 0:00: DD No Violations 1.00
272888157 2020-7-27 0:00: SW No Violations 2.00
307900009 2015-10-7 0:00: PL No Violations
348285569 2016-8-17 0:00: SC No Violations
352939280 2015-8-20 0:00: DD No Violations 0.70
424748874 2015-8-19 0:00: DD No Violations 1.00
427665158 2020-3-31 0:00: SW No Violations 0.50
491074566 2015-8-21 0:00: DD No Violations 1.00
576253152 2016-12-29 0:00 SW No Violations
579121939 2015-8-22 0:00: DD No Violations
628795184 2019-1-28 0:00: SW No Violations 1.40
66407184 2017-2-25 0:00: SW No Violations
688315172 2015-9-6 0:00:0 DD No Violations
898869729 2018-2-5 0:00:0 SW No Violations 0.40