If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-155-24084 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.18,"lon":-80.61,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Trumbull | |
Municipality: Hubbard Township | |
Operator Name: PAC DRILLING LLC | |
Well Pad ID: | |
Farm/Lease Name: PATTERSON | |
License Status: Producing | |
License Date: 2013-11-13 | |
Spud Date: 2014-01-14 | |
Spud Drilling Contractor: POULSON DRILLING | |
Final Drill Date: 2014-02-17 | |
Well Total Depth: 5454.00 ft | |
Configuration: Vertical | |
Latitude: 41.180000 | |
Longitude: -80.610000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2013-11-13 | Proposed Formations:CLINTON THRU MEDINA, Issued Date:11/13/2013, Expired Date:11/13/2015 12:00:00 PM, Drilling unit acres:40, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2014-02-17 | |
Completion Report Received | 2014-04-16 | |
Construction Permit Expires | 2014-11-13 | |
Record Last Modified | 2017-02-15 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2014-04-21 | 5140 | 5245 | 36 |
5140 | 5245 | 36 | |
5140 | 5245 | 36 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2014-01-30 | ACID | 0 | 500 Gal | 50000 | Universal Well Services Inc. | On 1/30/2014, I witnessed Universal Well Service stimulate the Clinton Sandstone formation for PAC Drilling. The backside annulus was completely open during the stimulation operations with no failures. There were no casing failures. There was a second breakdown pressure of 1970 psi. A total of 30 balls were dropped. A total of 126,728 gallons of water was used. All of the stimulation equipment operated smoothly for Universal Well Service. |
2014-01-30 | H2O | 20 | 3210 Bbl | 50600 | Universal Well Services Inc. |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2014 | PAC DRILLING LLC | 13621.00 | 712.00 | 360 |
2015 | PAC DRILLING LLC | 11561.00 | 546.00 | 360 |
2016 | PAC DRILLING LLC | 7505.00 | 336.00 | 360 |
2017 | PAC DRILLING LLC | 6350.00 | 291.00 | 360 |
2018 | PAC DRILLING LLC | 5978.00 | 194.00 | 360 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2014 | PAC DRILLING LLC | Brine | 116 | 360 |
2015 | PAC DRILLING LLC | Brine | 50 | 360 |
2016 | PAC DRILLING LLC | Brine | 24 | 360 |
2017 | PAC DRILLING LLC | Brine | 0 | 360 |
2018 | PAC DRILLING LLC | Brine | 0 | 360 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1645034096 | 2020-4-15 0:00: | UP | No Violations | |
-1693452334 | 2014-2-13 0:00: | CT | No Violations | 7.00 |
-751449224 | 2018-5-15 0:00: | UP | No Violations | |
0243331845 | 2017-10-11 | UrbanProduction Wells | Violations Noted | I found the well in production on the day of my inspection. There is still no identification posted at the well. There is no fencing around the well; however, the well is located in a clearing surrounded by thick woodlands. The fencing was waived during the pre--up lines are secure with handles removed from the valves and plugs. The 210 bbl. storage tanks have the required urban safety equipment. There is an identification sign posted at the tank battery. The identification sign is missing the required information per 1501:9-9--e). The fencing around the tank battery was waived during the pre--4085. There is no identification sign on the gate.
PAC needs to: 1) Post an identification sign to be in compliance with 1501:9-9--e) at the tank battery with: Well owners address and phone number Property street address or nearest address to the access road entrance. 4) Post the proper identification sign on the access road gate per 1501:9-9- 3) Post an identification sign at the well per 1501:9-9- |
0751449224 | 2018-05-15 | UrbanProduction Wells | No Violations | I conducted an compliance notice follow-up inspection for compliance notice 243331845. The well was equipped with a plunger lift assembly and the annulus and flow line valves were open. There was still no identification posted at the well. No fencing surrounded the well; however, the fencing was waived during the pre-site inspection. The diked tank battery has three storage tanks and a separator. The pick-up lines are secure with handles removed from the valves and plugs. The 210 BBL storage tanks have the required urban safety equipment. There was an identification sign posted at the tank battery, but was missing the required information per 1501:9-9--e). The fencing around the tank battery was waived during the pre-site inspection. The access road was stable with two locked gates at the entrance and shared with permit #2-4085. Identification was needed on the gate.
PAC needs to: 1) Post an identification sign to be in compliance with 1501:9-9--e) at the tank battery with: Well owners address and phone number Property street address or nearest address to the access road entrance. 4) Post the proper identification sign on the access road gate per 1501:9-9- 3) Post an identification sign at the well per 1501:9-9- |
0984558491 | 2017-03-21 | UrbanProduction Wells | No Violations
--up lines have plugs, but no locks. The 210 bbl. storage tanks have the required urban safety equipment. A deduct meter and 31 day chart dated 1 March 2017 is installed at the separator. There is an identification sign posted at the tank battery. The identification sign is missing the required information per 1501:9-9-05(E)(1)(a-e). There is no danger, keep out and no smoking sign(s) posted. The fencing around the tank battery was waived during the pre--4085. There is no lock or identification sign on the gate. The equipment on the pad consists of the following:
| |
1390837587 | 2014-01-16 | Drill / Deepen / Reopen | No Violations | I witnessed Universal Well Service cement the surface casing for PAC Drilling. Poulson Drilling drilled a 11 Hole #2 to 787 RBK (rig floor) and set 8.625 casing to 770 RBK with 2 centralizers. The casing was 23 lbs per ft. The bottom of the Berea Sandstone was logged at 632. Universal established circulation with 2 barrels of fresh water, then ran 12 barrel of sweep and 5 barrels of a fresh water spacer. Next, the operator pumped 150 sacks of Unifill Lite as the lead cement followed by 125 sacks of Type 1 as the tail cement. The cement was displaced to 750 with 48 barrels of fresh water. After 20 minutes, the cement held static at surface within the annulus of the casing. |
1407159042 | 2014-08-04 | UrbanPreliminary Restoration | No Violations | I was on location for an urban preliminary restoration. I found during my inspection the well site graded. The site was well vegetated. The pits were filled and closed. All debris was removed. Erosion and drainage controls are in place. The well was in production with a plunger lift unit. The tank battery consisted of two, 210 barrel production tanks, a 50 barrel brine tank and a separator. A dike surrounded the production equipment. The production equipment had the correct spacing. The proper identification was posted. Plugs were installed on the load lines. Urban safety equipment was installed on both production tanks. The lease road was in good condition. The tank battery was located in an isolated and wooded area; fencing was waived on the pre-site inspection. Urban preliminary restoration passed. |
1427181320 | 2014-01-14 | Drill / Deepen / Reopen | No Violations | I witnessed Universal Well Service cement the conductor casing for PAC Drilling. Poulson Drilling drilled a 14.75 Hole #1 to 93 RBK (rig floor) and set 11.75 casing to 84 RBK. The rig floor was 5 above ground level. The casing had a weight of 32 pounds per foot. The Universal operator established circulation with 3 barrels of fresh water. Next, the operator mixed and pumped 20 barrels of gel and 5 barrels of fresh water spacing followed by 125 sacks of Type 1 cement. The cement was displaced to 69 with 8 barrels of fresh water. I witnessed 9 barrels of good cement returned to surface. The cement held static at surface after 20 minutes. |
1551453206 | 2019-03-01 | UrbanProduction Wells | No Violations | I conducted an compliance notice follow-up inspection for compliance notice 243331845, regarding multiple compliance issues related to urban rule requirements. At the time of this inspection, identification still needed to be posted at the well. There was an identification sign posted at the tank battery, but was still missing the required information per 1501:9-9-05E(1)(a-e). The lease road gates were not locked, at the time of this inspection and the identification still has not been installed on the gate.
PAC needs to: 1) Post an identification sign to be in compliance with 1501:9-9-05E(1)(a-e) at the tank battery with: Well owners address and phone number Property street address or nearest address to the access road entrance. 2) Post the proper identification sign on the access road gate per 1501:9-9-05E(1)(f). 3) Post an identification sign at the well per 1501:9-9-05E(2). 4) Install the locks on both access gates. |
1693452334 | 2014-02-13 | Completion Testing | No Violations | My inspection found the pits closed. PAC Drilling used 75 tons of Kiln Dust supplied by Chemtech. I noticed no violations at this time. |
243331845 | 2017-10-11 0:00 | UP | No Violations | 0.30 |
984558491 | 2017-3-21 0:00: | UP | No Violations | 0.60 |
Inspection ID | Violation ID | Violation Date | Violation Code | Violation Comments |
---|---|---|---|---|
0243331845 | US-OH-122469 | 2017-12-26 | ID (a-i) |
For data sources see[9]