Well Details

Well ID: 34-155-24088
Loading map...
Country: United States
State: Ohio
County: Trumbull
Municipality: Bristol Township
Operator Name: CEDAR VALLEY ENERGY INC
Well Pad ID:
Farm/Lease Name: WILLIAMS
License Status: Producing
License Date: 2013-12-26
Spud Date: 2014-02-01
Spud Drilling Contractor: POULSON DRILLING
Final Drill Date: 2014-02-05
Well Total Depth:
Configuration: Vertical
Latitude: 41.390000
Longitude: -80.890000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2013-12-26 Proposed Formations:CLINTON, Issued Date:12/26/2013, Expired Date:12/26/2015 12:00:00 PM, Drilling unit acres:42, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2014-02-05
Completion Report Received 2014-03-10
Construction Permit Expires 2015-12-26
Record Last Modified 2019-06-11

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2014-03-11 3890 3954 29
3890 3954 29
3890 3954 29

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2014-02-20 H2O 15 85749 Gal 51500 Universal Well Services Inc.

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2014 CEDAR VALLEY ENERGY INC 1608.00 825.00 274
2015 CEDAR VALLEY ENERGY INC 1991.00 686.00 365
2016 CEDAR VALLEY ENERGY INC 1978.00 523.00 365
2017 CEDAR VALLEY ENERGY INC 1881.00 396.00 365
2018 CEDAR VALLEY ENERGY INC 1213.00 310.00 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2014 CEDAR VALLEY ENERGY INC Brine 1712 274
2015 CEDAR VALLEY ENERGY INC Brine 1190 365
2016 CEDAR VALLEY ENERGY INC Brine 1178 365
2017 CEDAR VALLEY ENERGY INC Brine 757 365
2018 CEDAR VALLEY ENERGY INC Brine 686 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1524349149 2019-9-17 0:00: PW No Violations
-1644358522 2014-6-4 0:00:0 PW No Violations 0.50
0391815549 2014-06-30 Production Wells No Violations I was on location to follow-up on the oil spill clean-up. I found during my inspection all impacted water, soil and grass cleaned. The site was graded. The dike was repaired used clay material. The production equipment and gravel inside the dike was completely clean.
0392611291 2014-06-25 Production Wells No Violations I was on location to follow-up on the clean-up operations for the oil spill. I found during my inspection that the cleaning of the ditch had progressed to within 100 of the tank battery. New dikes were built next to the tank battery to contain the remaining oil. Once Cedar Valley finishes the ditch, the crew will start cleaning inside the tank battery. Follow-up inspections will continue until all of the oil and impacted material is removed.
1259596808 2016-06-03 Production Wells No Violations


The equipment on the site consists of the following:


1 Mechanical separator 1 Production well

1394111384 2014-03-06 Completion Testing No Violations My inspection found the pits closed. The tank battery was partially built and pumping unit was on location. Restoration needs to be complete by 8/5/2014.
1403892403 2014-06-27 Production Wells No Violations I was on location for a follow-up inspection. I found during my inspection that all of the impacted soil and grass had been piled to one area for removal to an approved landfill. The ditch was completely cleaned of all oil. The production equipment was cleaned. The entire area inside the dike was cleaned of all oil. A Cedar Valley crew was on location actively repairing the dike. I will continue follow-up inspections until clean-up operations are complete.
1410793670 2014-09-15 Preliminary Restoration No Violations I was on location for a preliminary restoration. I found during my inspection the well in production with a pumping unit. The tank battery consisted of a 100 barrel production tank, a 50 barrel brine tank, and a separator. A dike surrounded the production equipment. All of the production equipment had the correct spacing per 1501:9-9-05 (A). Identification signs were posted at the well and production tank. A bull plug was installed on the load line. The site was graded. Vegetation was established. All drilling equipment was removed. Drainage and erosion controls were in place. The pits were filled and closed. All debris was removed. The lease road was in good condition.
1644358522 2014-06-04 Production Wells No Violations I was on location checking on the preliminary restoration progress. I found during my inspection the site had been tilled and graded. The site still needed raked and seeded. Cedar Valley has until 8/5/2014 to complete the restoration. I will follow-up at that time.
1904150620 2014-02-04 Drill / Deepen / Reopen No Violations My inspection found Poulson Drilling at a current depth of 3,128. The pits were properly lined. The lease road was properly stoned and in good condition.
391815549 2014-6-30 0:00: PW No Violations
392611291 2014-6-25 0:00: PW No Violations 1.50

For data sources see[9]