{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.39,"lon":-80.89,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Trumbull | |
Municipality: Bristol Township | |
Operator Name: CEDAR VALLEY ENERGY INC | |
Well Pad ID: | |
Farm/Lease Name: WILLIAMS | |
License Status: Producing | |
License Date: 2013-12-26 | |
Spud Date: 2014-02-01 | |
Spud Drilling Contractor: POULSON DRILLING | |
Final Drill Date: 2014-02-05 | |
Well Total Depth: | |
Configuration: Vertical | |
Latitude: 41.390000 | |
Longitude: -80.890000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2013-12-26 | Proposed Formations:CLINTON, Issued Date:12/26/2013, Expired Date:12/26/2015 12:00:00 PM, Drilling unit acres:42, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2014-02-05 | |
Completion Report Received | 2014-03-10 | |
Construction Permit Expires | 2015-12-26 | |
Record Last Modified | 2019-06-11 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2014-03-11 | 3890 | 3954 | 29 |
3890 | 3954 | 29 | |
3890 | 3954 | 29 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2014-02-20 | H2O | 15 | 85749 Gal | 51500 | Universal Well Services Inc. |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2014 | CEDAR VALLEY ENERGY INC | 1608.00 | 825.00 | 274 |
2015 | CEDAR VALLEY ENERGY INC | 1991.00 | 686.00 | 365 |
2016 | CEDAR VALLEY ENERGY INC | 1978.00 | 523.00 | 365 |
2017 | CEDAR VALLEY ENERGY INC | 1881.00 | 396.00 | 365 |
2018 | CEDAR VALLEY ENERGY INC | 1213.00 | 310.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2014 | CEDAR VALLEY ENERGY INC | Brine | 1712 | 274 |
2015 | CEDAR VALLEY ENERGY INC | Brine | 1190 | 365 |
2016 | CEDAR VALLEY ENERGY INC | Brine | 1178 | 365 |
2017 | CEDAR VALLEY ENERGY INC | Brine | 757 | 365 |
2018 | CEDAR VALLEY ENERGY INC | Brine | 686 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1524349149 | 2019-9-17 0:00: | PW | No Violations | |
-1644358522 | 2014-6-4 0:00:0 | PW | No Violations | 0.50 |
0391815549 | 2014-06-30 | Production Wells | No Violations | I was on location to follow-up on the oil spill clean-up. I found during my inspection all impacted water, soil and grass cleaned. The site was graded. The dike was repaired used clay material. The production equipment and gravel inside the dike was completely clean. |
0392611291 | 2014-06-25 | Production Wells | No Violations | I was on location to follow-up on the clean-up operations for the oil spill. I found during my inspection that the cleaning of the ditch had progressed to within 100 of the tank battery. New dikes were built next to the tank battery to contain the remaining oil. Once Cedar Valley finishes the ditch, the crew will start cleaning inside the tank battery. Follow-up inspections will continue until all of the oil and impacted material is removed. |
1259596808 | 2016-06-03 | Production Wells | No Violations
| |
1394111384 | 2014-03-06 | Completion Testing | No Violations | My inspection found the pits closed. The tank battery was partially built and pumping unit was on location. Restoration needs to be complete by 8/5/2014. |
1403892403 | 2014-06-27 | Production Wells | No Violations | I was on location for a follow-up inspection. I found during my inspection that all of the impacted soil and grass had been piled to one area for removal to an approved landfill. The ditch was completely cleaned of all oil. The production equipment was cleaned. The entire area inside the dike was cleaned of all oil. A Cedar Valley crew was on location actively repairing the dike. I will continue follow-up inspections until clean-up operations are complete. |
1410793670 | 2014-09-15 | Preliminary Restoration | No Violations | I was on location for a preliminary restoration. I found during my inspection the well in production with a pumping unit. The tank battery consisted of a 100 barrel production tank, a 50 barrel brine tank, and a separator. A dike surrounded the production equipment. All of the production equipment had the correct spacing per 1501:9-9-05 (A). Identification signs were posted at the well and production tank. A bull plug was installed on the load line. The site was graded. Vegetation was established. All drilling equipment was removed. Drainage and erosion controls were in place. The pits were filled and closed. All debris was removed. The lease road was in good condition. |
1644358522 | 2014-06-04 | Production Wells | No Violations | I was on location checking on the preliminary restoration progress. I found during my inspection the site had been tilled and graded. The site still needed raked and seeded. Cedar Valley has until 8/5/2014 to complete the restoration. I will follow-up at that time. |
1904150620 | 2014-02-04 | Drill / Deepen / Reopen | No Violations | My inspection found Poulson Drilling at a current depth of 3,128. The pits were properly lined. The lease road was properly stoned and in good condition. |
391815549 | 2014-6-30 0:00: | PW | No Violations | |
392611291 | 2014-6-25 0:00: | PW | No Violations | 1.50 |