If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-155-24100 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.24,"lon":-80.57,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Trumbull | |
Municipality: Brookfield Township | |
Operator Name: HIGHLAND FIELD SERVICES LLC | |
Well Pad ID: | |
Farm/Lease Name: HIGHLAND BROOKFIELD (SWIW #36) | |
License Status: Not Drilled | |
License Date: 2017-06-21 | |
Spud Date: | |
Spud Drilling Contractor: | |
Final Drill Date: | |
Well Total Depth: | |
Configuration: Vertical | |
Latitude: 41.240000 | |
Longitude: -80.570000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2017-06-21 | Proposed Formations:KNOX THRU ROME, Issued Date:6/21/2017, Expired Date:6/21/2018 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:SWD, Proposed Well Class:SWIW |
Construction Permit Expires | 2018-06-21 | |
Record Last Modified | 2018-11-01 |
For data sources see[2]
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1089880229 | 2018-1-11 0:00: | SW | No Violations | 0.30 |
-1122686144 | 2018-3-19 0:00: | ND | No Violations | 2.50 |
-1693850613 | 2017-11-17 0:00 | SW | No Violations | 1.00 |
-227330767 | 2017-11-27 0:00 | SW | No Violations | 0.40 |
-671419258 | 2017-12-18 0:00 | SW | No Violations | 1.00 |
0227330767 | 2017-11-27 | Salt Water Injection Well | No Violations | |
0671419258 | 2017-12-18 | Salt Water Injection Well | No Violations | I found Glenn O. Hawbaker (GOH) working on the access road. There are no violations at this time. |
0969440338 | 2018-01-04 | Salt Water Injection Well | No Violations | |
0978179345 | 2018-02-16 | Salt Water Injection Well | No Violations | I found Glenn O. Hawbaker (GOH) spreading stone on the access road. Four (4) dump trucks full of stone arrived on location during my inspection. There are no violations at this time. |
1089880229 | 2018-01-11 | Salt Water Injection Well | No Violations | I found Glenn O. Hawbaker (GOH) working on the access road. There are no violations at this time. |
1122686144 | 2018-03-19 | Not Drilled | No Violations | I found Glenn O. Hawbaker (GOH) on site working on the access road and the well pad for the Highland #1. I spoke with Bill Johnson, GOH General Superintendent, and Mike Beers, GOH Site Foreman. Mr. Johnson stated GOH has a projected completion date of April 4, 2018 for the access road and the well pad for the Highland #5. |
1382275042 | 2017-12-04 | Salt Water Injection Well | No Violations | I found Glenn O. Hawbaker (GOH) working on the access road. There are no violations at this time. |
1693850613 | 2017-11-17 | Salt Water Injection Well | No Violations | |
969440338 | 2018-1-4 0:00:0 | SW | No Violations | 0.50 |
978179345 | 2018-2-16 0:00: | SW | No Violations | 0.30 |
For data sources see[3]