If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-157-21161 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.43,"lon":-81.35,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Tuscarawas | |
Municipality: Mill Township | |
Operator Name: SOUND ENERGY CO INC | |
Well Pad ID: | |
Farm/Lease Name: GUNDY LEO E& DOREEN | |
License Status: Producing | |
License Date: 1989-10-23 | |
Spud Date: 1969-10-29 | |
Spud Drilling Contractor: | |
Final Drill Date: 1969-11-05 | |
Well Total Depth: 5275.00 ft | |
Configuration: Vertical | |
Latitude: 40.430000 | |
Longitude: -81.350000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
CO | 1969-07-24 | 2543 TIPKA ENERGY DEVLOP CO GeoDate 7/24/69 |
Original Spud | 1969-10-29 | |
Completed | 1969-11-05 | |
Reached Total Depth | 1969-11-05 | |
CO | 1989-10-23 | 2543 TIPKA ENERGY DEVLOP CO GeoDate 10/23/89 |
Unknown | 1989-10-23 | Issued Date 10/23/89 Expired Date 10/23/90 Proposed Purpose OG Was Plug Supervised Who Superivsed Plug and Abandon Date |
Construction Permit Expires | 1990-10-23 | |
Record Last Modified | 2013-10-03 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2006-09-11 | 5110 | 5154 | 0 |
5110 | 5154 | 0 | |
5110 | 5154 | 0 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
N2 | 0 | 115 Mscf | 0 | |||
ACID | 0 | 500 Gal | 0 | MUD ACID. | ||
H2O | 0 | 1300 Bbl | 65000 |
For data sources see[4]
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-182535956 | 2018-12-24 0:00 | PW | No Violations | 1.00 |
0182535956 | 2018-12-24 | Production Wells | No Violations | Upon my arrival on location, I witnessed the well was equipped with 4.5 inch diameter casing and a 4.5 inch concoil plunger lift system. The casing valves was in the open position. The production equipment included two steel 100 barrel tanks, a plastic 50 barrel tank,and a horizonal separator within an earthen dike. A chart recorder with a 2 by .500 orifice plate was located across the creek. The production report was up to date and proper identification was present. |
For data sources see[9]