X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-157-21381

Well Details

Well ID: 34-157-21381
Loading map...
Country: United States
State: Ohio
County: Tuscarawas
Municipality: Salem Township
Operator Name: ARTEX OIL COMPANY
Well Pad ID:
Farm/Lease Name: ROBINSON E M & M L
License Status: Final Restoration
License Date: 2014-07-03
Spud Date: 1972-10-23
Spud Drilling Contractor:
Final Drill Date: 1972-11-26
Well Total Depth: 5150.00 ft
Configuration: Vertical
Latitude: 40.300000
Longitude: -81.510000

For data sources see[1]

Well History

Well Status Well Status Date Comment
CO 1972-10-06 157 LANDPROVEST INC GeoDate 10/6/72
Original Spud 1972-10-23 RE-ISSUE 10-11-72
Completed 1972-11-26 RE-ISSUE 10-11-72
Reached Total Depth 1972-11-26 RE-ISSUE 10-11-72
CO 1994-07-22 2172 NATLAND ENERGY CORP GeoDate 10/6/72
CO 1996-01-12 5352 ARTEX OIL COMPANY GeoDate 10/6/72
APP 2014-07-03 Proposed Formations:CLINTON, Issued Date:7/3/2014, Expired Date:7/2/2016 12:00:00 PM, Drilling unit acres:100, Proposed Well Type:OG, Proposed Well Class:
Plugged/Abandoned 2014-10-21 RE-ISSUE 10-11-72
Construction Permit Expires 2016-07-02 RE-ISSUE 10-11-72
Record Last Modified 2017-02-10 RE-ISSUE 10-11-72

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2006-09-11 5007 5087 19
5007 5087 19
5007 5087 19

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 0 1700 Bbl 50000

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
1984 SPARTA ENERGY CORP 5427.00 0.00 0
1985 SPARTA ENERGY CORP 4714.00 0.00 320
1988 LANDPROVEST INC 1017.00 0.00 153
1989 LANDPROVEST INC 5590.00 0.00 366
1991 LANDPROVEST INC 2669.00 0.00 365
1992 LANDPROVEST INC 4366.00 0.00 366
1993 LANDPROVEST INC 3078.00 0.00 335
1994 NATLAND ENERGY CORP 2414.00 0.00 365
1995 ARTEX OIL COMPANY 2297.00 0.00 365
1996 ARTEX OIL COMPANY 3570.00 0.00 365
1997 ARTEX OIL COMPANY 3305.00 0.00 365
1998 ARTEX OIL COMPANY 2670.00 0.00 0
1999 ARTEX OIL COMPANY 2247.00 0.00 0
2000 ARTEX OIL COMPANY 2302.00 0.00 365
2001 ARTEX OIL COMPANY 2079.00 0.00 365
2002 ARTEX OIL COMPANY 1879.00 0.00 365
2003 ARTEX OIL COMPANY 1577.00 0.00 365
2004 ARTEX OIL COMPANY 1304.00 0.00 365
2005 ARTEX OIL COMPANY 1573.00 0.00 365
2006 ARTEX OIL COMPANY 787.00 0.00 365
2007 ARTEX OIL COMPANY 1204.00 0.00 365
2008 ARTEX OIL COMPANY 949.00 0.00 365
2009 ARTEX OIL COMPANY 981.00 0.00 365
2010 ARTEX OIL COMPANY 1021.00 10.00 365
2011 ARTEX OIL COMPANY 1382.00 0.00 365
2012 ARTEX OIL COMPANY 1465.00 0.00 366
2013 ARTEX OIL COMPANY 1397.00 0.00 365
2015 ARTEX OIL COMPANY 86.00 0.00 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
1984 SPARTA ENERGY CORP Brine 0 0
1985 SPARTA ENERGY CORP Brine 50 320
1988 LANDPROVEST INC Brine 0 153
1989 LANDPROVEST INC Brine 0 366
1991 LANDPROVEST INC Brine 0 365
1992 LANDPROVEST INC Brine 0 366
1993 LANDPROVEST INC Brine 0 335
1994 NATLAND ENERGY CORP Brine 0 365
1995 ARTEX OIL COMPANY Brine 0 365
1996 ARTEX OIL COMPANY Brine 20 365
1997 ARTEX OIL COMPANY Brine 0 365
1998 ARTEX OIL COMPANY Brine
1999 ARTEX OIL COMPANY Brine 17
2000 ARTEX OIL COMPANY Brine 15 365
2001 ARTEX OIL COMPANY Brine 0 365
2002 ARTEX OIL COMPANY Brine 0 365
2003 ARTEX OIL COMPANY Brine 0 365
2004 ARTEX OIL COMPANY Brine 0 365
2005 ARTEX OIL COMPANY Brine 45 365
2006 ARTEX OIL COMPANY Brine 0 365
2007 ARTEX OIL COMPANY Brine 0 365
2008 ARTEX OIL COMPANY Brine 0 365
2009 ARTEX OIL COMPANY Brine 0 365
2010 ARTEX OIL COMPANY Brine 0 365
2011 ARTEX OIL COMPANY Brine 0 365
2012 ARTEX OIL COMPANY Brine 0 366
2013 ARTEX OIL COMPANY Brine 0 365
2015 ARTEX OIL COMPANY Brine 0 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-2067832137 2014-10-16 0:00 PB No Violations 3.00
-495924789 2014-10-20 0:00 PB No Violations 2.00
0000000116 2002-04-08 Production Wells No Violations inspect site found no violations at this time
001252i116 2002-04-08 Production Wells No Violations inspect site found no violations at this time
0495924789 2014-10-20 Plug / Plug Back No Violations On the day of my inspection I found Bishops Well Service had ripped the 4 1/2 inch casing at 1998 feet. The 4 1/2 inch casing was removed from the wellbore, and 2 3/8 tubing was run back into the wellbore to the depth of 2018 feet. A 200 foot rip plug will be set there.
116 2002-4-8 0:00:0 PW No Violations 0.50
1252i116 2002-4-8 0:00:0 PW No Violations 0.50
1413547516 2014-10-17 Plug / Plug Back No Violations On the day of my inspection I found Bishops well service ready to set the Clinton plug through 2 3/8 tubing. The plug is at 4915 feet to 4500 feet. The well circulated on the first plug. There are indications that there is a hole in the 4 1/2 inch casing. The Big lime plug will be set at 3688 feet. A 300 foot plug was set and the well circulated. The 2 3/8 tubing will be pulled out of the wellbore and the well will be shut in for the weekend.
1413892609 2014-10-21 Plug / Plug Back No Violations On the day of my inspection I found Bishop Well Service ready to continue plugging. A rip plug will be set at 2018 to 1818 feet. The Berea plug was set from 1389 to 1150 feet. The bottom of the surface was set from 893 feet to 693 feet. The surface plug was set from 200 feet to 0 feet with good cement returns to surface.
1418752809 2014-12-15 Final Restoration No Violations On the day of my inspection I found that the final restoration has been completed. The site passed final restoration according to ORC 1509.072 (B).
2067832137 2014-10-16 Plug / Plug Back No Violations On the day of my inspection I found Bishops Well Service preparing to plug and abandon the well. The 4 1/2 tubing will be perforated at 3640 feet to 3650 feet with 10 shots. 2 3/8 tubing will be run in the wellbore to set the clinton plug and the of the lime. Cementing will start tomorrow.

For data sources see[9]

References