If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-157-21834 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.5,"lon":-81.62,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Tuscarawas | |
Municipality: Sugar Creek Township | |
Operator Name: RIVERSIDE PETROLEUM & PROD. | |
Well Pad ID: | |
Farm/Lease Name: SHEPFER & MOOMAW BROS | |
License Status: Producing | |
License Date: 1972-12-15 | |
Spud Date: 1973-04-23 | |
Spud Drilling Contractor: | |
Final Drill Date: 1973-12-20 | |
Well Total Depth: 4490.00 ft | |
Configuration: Vertical | |
Latitude: 40.500000 | |
Longitude: -81.620000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
CO | 1972-12-15 | 139 MB OPERATING CO INC GeoDate 12/15/72 |
Original Spud | 1973-04-23 | REV. LOC. 3-14-73 |
Completed | 1973-12-20 | REV. LOC. 3-14-73 |
Reached Total Depth | 1973-12-20 | REV. LOC. 3-14-73 |
Change of Owner | 2000-06-30 | Operator changed from 139, MB OPERATING CO INC to 6674, GREAT LAKES ENERGY PTNSHP LLC |
Change of Owner | 2001-04-03 | Operator changed from 6674, GREAT LAKES ENERGY PTNSHP LLC to 6868, RIVERSIDE PETROLEUM & PROD. |
Record Last Modified | 2014-06-20 | REV. LOC. 3-14-73 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2006-09-11 | 4349 | 4395 | 0 |
4349 | 4395 | 0 | |
4349 | 4395 | 0 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 88000 Gal | 0 | AVG, PUMP RATE 61.45 BPM; AVG. PRESS W/SD. 2000#; HHP USED 3011 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
1984 | RESOURCE AMERICA INC | 2681.00 | 70.00 | 365 |
1985 | RESOURCE AMERICA INC | 2179.00 | 0.00 | 365 |
1987 | RESOURCE AMERICA INC | 1407.00 | 0.00 | 365 |
1988 | MB OPERATING CO INC | 1810.00 | 0.00 | 366 |
1989 | MB OPERATING CO INC | 1609.00 | 0.00 | 365 |
1990 | MB OPERATING CO INC | 1363.00 | 0.00 | 365 |
1991 | MB OPERATING CO INC | 1370.00 | 0.00 | 365 |
1992 | MB OPERATING CO INC | 800.00 | 0.00 | 366 |
1993 | MB OPERATING CO INC | 507.00 | 0.00 | 365 |
1994 | MB OPERATING CO INC | 356.00 | 0.00 | 365 |
1995 | MB OPERATING CO INC | 15.00 | 0.00 | 365 |
1996 | MB OPERATING CO INC | 0.00 | 0.00 | 366 |
1997 | MB OPERATING CO INC | 0.00 | 0.00 | 365 |
1999 | MB OPERATING CO INC | 0.00 | 0.00 | 273 |
2001 | RIVERSIDE PETROLEUM & PROD. | 0.00 | 0.00 | 0 |
2002 | RIVERSIDE PETROLEUM & PROD. | 1990.00 | 63.00 | 300 |
2003 | RIVERSIDE PETROLEUM & PROD. | 0.00 | 0.00 | 0 |
2004 | RIVERSIDE PETROLEUM & PROD. | 262.00 | 0.00 | 250 |
2005 | RIVERSIDE PETROLEUM & PROD. | 275.00 | 16.00 | 365 |
2006 | RIVERSIDE PETROLEUM & PROD. | 755.00 | 39.00 | 365 |
2007 | RIVERSIDE PETROLEUM & PROD. | 519.00 | 0.00 | 365 |
2008 | RIVERSIDE PETROLEUM & PROD. | 755.00 | 19.00 | 365 |
2009 | RIVERSIDE PETROLEUM & PROD. | 947.00 | 29.00 | 365 |
2010 | RIVERSIDE PETROLEUM & PROD. | 1125.00 | 12.00 | 365 |
2011 | RIVERSIDE PETROLEUM & PROD. | 811.00 | 7.00 | 365 |
2012 | RIVERSIDE PETROLEUM & PROD. | 1020.00 | 20.00 | 366 |
2013 | RIVERSIDE PETROLEUM & PROD. | 2674.00 | 25.00 | 365 |
2014 | RIVERSIDE PETROLEUM & PROD. | 2315.00 | 22.00 | 365 |
2015 | RIVERSIDE PETROLEUM & PROD. | 2396.00 | 13.00 | 365 |
2016 | RIVERSIDE PETROLEUM & PROD. | 2396.00 | 8.00 | 365 |
2017 | RIVERSIDE PETROLEUM & PROD. | 1471.00 | 5.00 | 365 |
2018 | RIVERSIDE PETROLEUM & PROD. | 671.00 | 20.00 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
1499964206 | 2017-07-13 | Production Wells | No Violations | On the day of my inspection I found the well equipped with 8 5/8 inch diameter casing, 4 1/2 inch diameter casing, and 1 1/2 inch diameter tubing, operated by a plunger lift system. The production equipment is made up of one 100 bbl. steel tank, a horizontal separator. The well is properly Identified, and the production reporting is up to date. |
1591343241 | 2019-11-1 0:00: | PW | No Violations | 0.40 |
For data sources see[9]