If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-157-21911 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.5,"lon":-81.31,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Tuscarawas | |
Municipality: Warren Township | |
Operator Name: ECO PRODUCTION LLC | |
Well Pad ID: | |
Farm/Lease Name: DUTTON HATTIE | |
License Status: Final Restoration | |
License Date: 2016-02-03 | |
Spud Date: 1973-04-04 | |
Spud Drilling Contractor: | |
Final Drill Date: 1973-06-05 | |
Well Total Depth: 5350.00 ft | |
Configuration: Vertical | |
Latitude: 40.500000 | |
Longitude: -81.310000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
CO | 1973-03-23 | 1383 OHIO L & M CO INC GeoDate 3/23/73 |
Original Spud | 1973-04-04 | REV. LOC. 4-4-73 |
Completed | 1973-06-05 | REV. LOC. 4-4-73 |
Reached Total Depth | 1973-06-05 | REV. LOC. 4-4-73 |
CO | 1989-10-20 | 1383 OHIO L & M CO INC GeoDate 10/20/89 |
Unknown | 1989-10-20 | Issued Date 10/20/89 Expired Date 10/20/90 Proposed Purpose OG Was Plug Supervised Who Superivsed Plug and Abandon Date |
Change of Owner | 2013-11-13 | Operator changed from 6288, ALLIANCE PETROLEUM CORPORATION to 201, GREEN GAS CO |
APP | 2016-02-03 | Proposed Formations:CLINTON, Issued Date:2/3/2016, Expired Date:2/2/2018 12:00:00 PM, Drilling unit acres:20, Proposed Well Type:OG, Proposed Well Class: |
Plugged/Abandoned | 2016-06-17 | REV. LOC. 4-4-73 |
Change of Owner | 2017-12-08 | Operator changed from 201, GREEN GAS CO to 10021, ECO PRODUCTION LLC |
Record Last Modified | 2017-12-08 | REV. LOC. 4-4-73 |
Construction Permit Expires | 2018-02-02 | REV. LOC. 4-4-73 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2006-09-11 | 5191 | 5197 | 0 |
5191 | 5197 | 0 | |
5191 | 5197 | 0 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 2981 Bbl | 40000 | |||
ACID | 15 | 250 Gal | 0 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
1984 | OHIO L & M CO INC | 2864.00 | 124.00 | 0 |
1985 | L & M PETROLEUM CO | 59.00 | 0.00 | 0 |
1986 | L & M PETROLEUM CO | 7.00 | 0.00 | 365 |
1987 | L & M PETROLEUM CO | 3.00 | 110.00 | 365 |
1990 | OHIO L & M CO INC | 17.00 | 0.00 | 365 |
1991 | OHIO L & M CO INC | 4.00 | 0.00 | 365 |
1993 | OHIO L & M CO INC | 294.00 | 0.00 | 365 |
2010 | ALLIANCE PETROLEUM CORPORATION | 410.00 | 0.00 | 365 |
2011 | ALLIANCE PETROLEUM CORPORATION | 0.00 | 0.00 | 365 |
2012 | ALLIANCE PETROLEUM CORPORATION | 0.00 | 0.00 | 366 |
2013 | ALLIANCE PETROLEUM CORPORATION | 0.00 | 0.00 | 273 |
2014 | GREEN GAS CO | 0.00 | 0.00 | 0 |
2016 | GREEN GAS CO | 0.00 | 0.00 | 0 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
1984 | OHIO L & M CO INC | Brine | 0 | 0 |
1985 | L & M PETROLEUM CO | Brine | 54 | 0 |
1986 | L & M PETROLEUM CO | Brine | 0 | 365 |
1987 | L & M PETROLEUM CO | Brine | 180 | 365 |
1990 | OHIO L & M CO INC | Brine | 0 | 365 |
1991 | OHIO L & M CO INC | Brine | 0 | 365 |
1993 | OHIO L & M CO INC | Brine | 0 | 365 |
2010 | ALLIANCE PETROLEUM CORPORATION | Brine | 0 | 365 |
2011 | ALLIANCE PETROLEUM CORPORATION | Brine | 0 | 365 |
2012 | ALLIANCE PETROLEUM CORPORATION | Brine | 0 | 366 |
2013 | ALLIANCE PETROLEUM CORPORATION | Brine | 0 | 273 |
2014 | GREEN GAS CO | Brine | 0 | 0 |
2016 | GREEN GAS CO | Brine | 0 | 0 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1312704026 | 2016-5-11 0:00: | PW | No Violations | 1.00 |
0044802321 | 2016-01-15 | Administrative Inspection | No Violations | I received a letter from John Davis with Green Gas, stating a new timeline for working on the well. He stated they will clean up the location by April 1, 2016, and complete the plugging before June 9, 2016. I place a phone call to John Davis and let him know that his timeline is acceptable. |
0890398584 | 2015-12-10 | Production Wells | Violations Noted | I received a call from Kyle and Denise Dalcoma to do an inspection of the well on their property. I found that the trees and brush has grown over the top of the pump unit, and it appears that the well has not been produced for some time. The electric motor to operate the pumping unit has been removed and the horse head bridle is not hooked up. The valve were in the off position. Records indicate that 2010 was the last year for production, and there is no reported production for 2014. The owner/operator shall submit a written plugging schedule to Inspector Randy Akins at 2207 Reiser Ave. New Philadelphia, Ohio, 44663 within 30 day, per OAC 1501:9-11-05(B), and plug the well within 180 days. The owner/operator will be notified if the plugging schedule is approved or denied. |
1026700376 | 2016-06-14 | Production Wells | No Violations | Upon arrival on location I found that the crew is preparing for the service rig. The brush has been removed, and Thompson Well service is moving on location on June 15, 2016 To plug the well. |
1059511873 | 2015-11-13 | Production Wells | No Violations | I received a request form Kyle and Denise Dalcoma for an inspection of the well. On the day of my inspection I found a 4 X 2 inch wellhead with 2 inch tubing and rods. Operated by a pump jack. There is no motor to run the pump jack and the bridle cable is broken and is not connected to the horse head. The valves are in the closed position. There has not been any production scene 2010. |
1312704026 | 2016-05-11 | Production Wells | No Violations | This is a follow up inspection to an NOV issued on 12/11/2015 There has been no change in the status of the well. It is still idle and the valves are in the closed position. Green Gas has agreed to start site prep in April of 2016, and complete plugging by June 2016. At this time Green gas has not started to clean up the well location at this time. |
1452086614 | 2016-01-06 | Administrative Inspection | No Violations | I phone John Davis and advised him that his letter of 12/29/2015 was not approved, and that he need to re-submit a timeline that completed the plugging by the 180 day period, ending on 06/09/2016 |
1466000979 | 2016-06-15 | Plug / Plug Back | No Violations | Upon arrival on location I found that Thompson well service has moved in on location and are preparing to plug the well. They are pulling the rods getting ready to set the bottom plug. |
1466082086 | 2016-06-16 | Plug / Plug Back | No Violations | Upon arrival on location I found the rig crew ready to set the bottom plug from 5207 to 4800 feet with 30 sacks of class A with 2 % Gel. The 2 3/8 inch tubing is being removed from the wellbore. |
1466101067 | 2016-06-16 | Plug / Plug Back | No Violations | Arrive on site today with Inspector Akins and Scheiner to begin plugging this well. Thompson Well Service has 2 3/8 inch diameter tubing at 5240 ft. to set the bottom plug. Petroset Cementing Service set the first plug at 5240 ft. to 5040 ft. with 30 sacks of class A cement at 14.8 lb. and a yield of 1.26 After setting the bottom plug Thompson Well Service will pull all of the tubing out of the well. They will go back inside the 4 1/2 inch diameter casing and try to rip beginning at 4900 ft. and look for a telegraph. They plan to have the tubing out and the casing ripped so they can be ready to continue plugging at 7:30 AM Friday morning. |
1466184967 | 2016-06-17 | Plug / Plug Back | No Violations | |
1466433268 | 2016-06-20 | Plug / Plug Back | No Violations | On the day of my inspection I found the rig crew has reclaimed the location. The 8 5/8 inch casing has been cut off and the pit has been filled in. The location is ready for seeding and mulching. The NOV has been completed and ready to close. |
1479316779 | 2016-11-16 | Final Restoration | No Violations | On the day of my inspection, I found that the final restoration has been completed. The site passed final restoration according to ORC 1509.072 (B). |
44802321 | 2016-1-15 0:00: | AM | No Violations | 0.50 |
890398584 | 2015-12-10 0:00 | PW | No Violations |
Inspection ID | Violation ID | Violation Date | Violation Code | Violation Comments |
---|---|---|---|---|
0890398584 | US-OH-130168 | 2016-11-25 | General Safety | |
0890398584 | US-OH-130169 | 2016-11-25 | Well shall be plugged |
For data sources see[9]