If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-157-22048 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.47,"lon":-81.27,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Tuscarawas | |
Municipality: Union Township | |
Operator Name: AIM ENERGY LLC | |
Well Pad ID: | |
Farm/Lease Name: EDWARDS DALLAS | |
License Status: Producing | |
License Date: 1973-09-07 | |
Spud Date: 1973-09-15 | |
Spud Drilling Contractor: ARMSTRONG DRLG | |
Final Drill Date: 1973-09-21 | |
Well Total Depth: 5557.00 ft | |
Configuration: Vertical | |
Latitude: 40.470000 | |
Longitude: -81.270000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
CO | 1973-09-07 | 18 MUTUAL OIL & GAS CO GeoDate 9/7/73 |
Original Spud | 1973-09-15 | |
Completed | 1973-09-21 | |
Reached Total Depth | 1973-09-21 | |
Completion Report Received | 1974-04-08 | |
Change of Owner | 2000-12-27 | Operator changed from 18, MUTUAL OIL & GAS CO to 6288, ALLIANCE PETROLEUM CORPORATION |
Change of Owner | 2007-02-22 | Operator changed from 6288, ALLIANCE PETROLEUM CORPORATION to 8175, AIM ENERGY LLC |
Record Last Modified | 2017-02-15 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2003-11-24 | 5428 | 5475 | 17 |
5428 | 5475 | 17 | |
5428 | 5475 | 17 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 1315 Bbl | 50000 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
1984 | MUTUAL OIL & GAS CO | 2721.00 | 1542.00 | 0 |
1985 | MUTUAL OIL & GAS CO | 3649.00 | 1438.00 | 0 |
2001 | OHIO L & M CO INC | 56.00 | 696.00 | 365 |
2002 | OHIO L & M CO INC | 0.00 | 437.00 | 365 |
2003 | OHIO L & M CO INC | 0.00 | 347.00 | 365 |
2004 | OHIO L & M CO INC | 41.00 | 252.00 | 365 |
2005 | OHIO L & M CO INC | 5.00 | 346.00 | 365 |
2006 | ALLIANCE PETROLEUM CORPORATION | 440.00 | 232.00 | 365 |
2007 | AIM ENERGY LLC | 736.00 | 181.00 | 365 |
2008 | AIM ENERGY LLC | 356.00 | 209.00 | 365 |
2009 | AIM ENERGY LLC | 1871.00 | 0.00 | 365 |
2010 | AIM ENERGY LLC | 614.00 | 200.00 | 365 |
2011 | AIM ENERGY LLC | 175.00 | 256.00 | 0 |
2012 | AIM ENERGY LLC | 182.00 | 237.00 | 366 |
2013 | AIM ENERGY LLC | 573.00 | 221.00 | 365 |
2014 | AIM ENERGY LLC | 245.00 | 205.00 | 365 |
2015 | AIM ENERGY LLC | 162.00 | 202.00 | 365 |
2016 | AIM ENERGY LLC | 76.00 | 190.00 | 365 |
2017 | AIM ENERGY LLC | 680.00 | 210.00 | 365 |
2018 | AIM ENERGY LLC | 310.00 | 136.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
1984 | MUTUAL OIL & GAS CO | Brine | 0 | 0 |
1985 | MUTUAL OIL & GAS CO | Brine | 225 | 0 |
2001 | OHIO L & M CO INC | Brine | 0 | 365 |
2002 | OHIO L & M CO INC | Brine | 0 | 365 |
2003 | OHIO L & M CO INC | Brine | 0 | 365 |
2004 | OHIO L & M CO INC | Brine | 0 | 365 |
2005 | OHIO L & M CO INC | Brine | 0 | 365 |
2006 | ALLIANCE PETROLEUM CORPORATION | Brine | 0 | 365 |
2007 | AIM ENERGY LLC | Brine | 25 | 365 |
2008 | AIM ENERGY LLC | Brine | 23 | 365 |
2009 | AIM ENERGY LLC | Brine | 0 | 365 |
2010 | AIM ENERGY LLC | Brine | 89 | 365 |
2011 | AIM ENERGY LLC | Brine | 220 | |
2012 | AIM ENERGY LLC | Brine | 124 | 366 |
2013 | AIM ENERGY LLC | Brine | 16 | 365 |
2014 | AIM ENERGY LLC | Brine | 19 | 365 |
2015 | AIM ENERGY LLC | Brine | 27 | 365 |
2016 | AIM ENERGY LLC | Brine | 59 | 365 |
2017 | AIM ENERGY LLC | Brine | 54 | 365 |
2018 | AIM ENERGY LLC | Brine | 37 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0983623818 | 2018-11-05 | Production Wells | No Violations | Upon my arrival on location, I witnessed the well was equipped with 4.5 inch diameter casing, 2.375 inch tubing, rods, and a pumping unit ran with an electric motor. The valves on the tubing and on the casing were in the open position. The production equipment included a steel 210 barrel tank, a vertical separator and a chart recorder with a 2 by .125 inch orifice plate within an earthen dike. The earthen dike area was being shared with the Edwards 2 (2353) and the Edwards 3 (2393). The production report was up to date and proper identification was present. |
983623818 | 2018-11-5 0:00: | PW | No Violations | 0.80 |
For data sources see[9]