If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-157-23024 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.48,"lon":-81.41,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Tuscarawas | |
Municipality: Goshen Township | |
Operator Name: G & O RESOURCES LTD | |
Well Pad ID: | |
Farm/Lease Name: RUTHLEDGE ROBERT | |
License Status: Producing | |
License Date: 1977-12-05 | |
Spud Date: 1977-12-15 | |
Spud Drilling Contractor: | |
Final Drill Date: 1977-12-21 | |
Well Total Depth: 4975.00 ft | |
Configuration: Vertical | |
Latitude: 40.480000 | |
Longitude: -81.410000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
CO | 1977-12-05 | 5 PENINSULA GROUP INC GeoDate 12/5/77 |
Original Spud | 1977-12-15 | |
Completed | 1977-12-21 | |
Reached Total Depth | 1977-12-21 | |
CO | 1991-11-13 | 201 GREEN GAS CO GeoDate 12/5/77 |
CO | 1992-08-25 | 4280 JRD ENERGY GeoDate 12/5/77 |
Change of Owner | 1997-08-04 | Operator changed from 4280, JRD ENERGY to 5894, G & O RESOURCES LTD |
Record Last Modified | 2019-06-04 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2006-09-11 | 4832 | 4848 | 11 |
4832 | 4848 | 11 | |
4832 | 4848 | 11 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 72000 Gal | 60000 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
1985 | TIPKA BARTLO OIL & GAS CO | 3793.00 | 61.00 | 0 |
1986 | TIPKA BARTLO OIL & GAS CO | 3723.00 | 69.00 | 365 |
1987 | TIPKA BARTLO OIL & GAS CO | 2696.00 | 67.00 | 365 |
1988 | TIPKA BARTLO OIL & GAS CO | 2336.00 | 67.00 | 365 |
1990 | PENINSULA GROUP INC | 3612.00 | 0.00 | 365 |
1991 | PENINSULA GROUP INC | 2597.00 | 66.00 | 365 |
1992 | JRD ENERGY | 2097.00 | 62.00 | 365 |
1993 | JRD ENERGY | 2162.00 | 96.00 | 365 |
1994 | JRD ENERGY | 2123.00 | 33.00 | 365 |
1995 | JRD ENERGY | 2033.00 | 91.00 | 365 |
1996 | JRD ENERGY | 2362.00 | 69.00 | 365 |
1997 | JRD ENERGY | 1112.00 | 44.00 | 197 |
1998 | G & O RESOURCES LTD | 2174.00 | 65.00 | 365 |
1999 | G & O RESOURCES LTD | 1738.00 | 0.00 | 360 |
2000 | G & O RESOURCES LTD | 1724.00 | 59.00 | 360 |
2001 | G & O RESOURCES LTD | 1746.00 | 16.00 | 365 |
2002 | G & O RESOURCES LTD | 2560.00 | 80.00 | 365 |
2003 | G & O RESOURCES LTD | 1815.00 | 0.00 | 365 |
2004 | G & O RESOURCES LTD | 2199.00 | 87.00 | 365 |
2005 | G & O RESOURCES LTD | 1655.00 | 0.00 | 365 |
2006 | G & O RESOURCES LTD | 1758.00 | 0.00 | 365 |
2007 | G & O RESOURCES LTD | 1073.00 | 24.00 | 365 |
2008 | G & O RESOURCES LTD | 538.00 | 35.00 | 366 |
2009 | G & O RESOURCES LTD | 946.00 | 0.00 | 365 |
2010 | G & O RESOURCES LTD | 1994.00 | 28.00 | 365 |
2011 | G & O RESOURCES LTD | 1416.00 | 0.00 | 365 |
2012 | G & O RESOURCES LTD | 2154.00 | 0.00 | 366 |
2013 | G & O RESOURCES LTD | 1223.00 | 45.00 | 365 |
2014 | G & O RESOURCES LTD | 1841.00 | 60.00 | 365 |
2015 | G & O RESOURCES LTD | 1494.00 | 39.00 | 365 |
2016 | G & O RESOURCES LTD | 1942.00 | 21.00 | 365 |
2017 | G & O RESOURCES LTD | 1706.00 | 18.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
1985 | TIPKA BARTLO OIL & GAS CO | Brine | 0 | 0 |
1986 | TIPKA BARTLO OIL & GAS CO | Brine | 0 | 365 |
1987 | TIPKA BARTLO OIL & GAS CO | Brine | 30 | 365 |
1988 | TIPKA BARTLO OIL & GAS CO | Brine | 0 | 365 |
1990 | PENINSULA GROUP INC | Brine | 70 | 365 |
1991 | PENINSULA GROUP INC | Brine | 0 | 365 |
1992 | JRD ENERGY | Brine | 50 | 365 |
1993 | JRD ENERGY | Brine | 0 | 365 |
1994 | JRD ENERGY | Brine | 0 | 365 |
1995 | JRD ENERGY | Brine | 0 | 365 |
1996 | JRD ENERGY | Brine | 0 | 365 |
1997 | JRD ENERGY | Brine | 0 | 197 |
1998 | G & O RESOURCES LTD | Brine | 35 | 365 |
1999 | G & O RESOURCES LTD | Brine | 0 | 360 |
2000 | G & O RESOURCES LTD | Brine | 0 | 360 |
2001 | G & O RESOURCES LTD | Brine | 0 | 365 |
2002 | G & O RESOURCES LTD | Brine | 78 | 365 |
2003 | G & O RESOURCES LTD | Brine | 24 | 365 |
2004 | G & O RESOURCES LTD | Brine | 70 | 365 |
2005 | G & O RESOURCES LTD | Brine | 9 | 365 |
2006 | G & O RESOURCES LTD | Brine | 53 | 365 |
2007 | G & O RESOURCES LTD | Brine | 28 | 365 |
2008 | G & O RESOURCES LTD | Brine | 57 | 366 |
2009 | G & O RESOURCES LTD | Brine | 27 | 365 |
2010 | G & O RESOURCES LTD | Brine | 0 | 365 |
2011 | G & O RESOURCES LTD | Brine | 33 | 365 |
2012 | G & O RESOURCES LTD | Brine | 0 | 366 |
2013 | G & O RESOURCES LTD | Brine | 53 | 365 |
2014 | G & O RESOURCES LTD | Brine | 0 | 365 |
2015 | G & O RESOURCES LTD | Brine | 21 | 365 |
2016 | G & O RESOURCES LTD | Brine | 20 | 365 |
2017 | G & O RESOURCES LTD | Brine | 8 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-364244214 | 2018-7-6 0:00:0 | PW | No Violations | 0.30 |
0364244214 | 2018-07-06 | Production Wells | No Violations | Upon arrival on location, I witnessed the well was equipped 4.5 inch diameter casing, 1.5 inch diameter tubing, and a plunger lift system. The valves on the tubing were open and closed on the casing. Production equipment included a steel 100 barrel tank, a concrete vault, a horizonal separator, and chart recorder within an earthen dike. The production report was up to date and proper identification was present. |
For data sources see[9]