If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-157-23103 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.44,"lon":-81.43,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Tuscarawas | |
Municipality: Goshen Township | |
Operator Name: SOUND ENERGY CO INC | |
Well Pad ID: | |
Farm/Lease Name: ZADRA JULIUS J & GOLDIE | |
License Status: Producing | |
License Date: 1978-04-28 | |
Spud Date: 1978-06-20 | |
Spud Drilling Contractor: | |
Final Drill Date: 1978-06-25 | |
Well Total Depth: 5286.00 ft | |
Configuration: Vertical | |
Latitude: 40.440000 | |
Longitude: -81.430000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
CO | 1978-04-28 | 2050 ORION PETRO CORP GeoDate 4/28/78 |
Original Spud | 1978-06-20 | |
Completed | 1978-06-25 | |
Reached Total Depth | 1978-06-25 | |
Change of Owner | 2010-04-01 | Operator changed from 2050, ORION PETRO CORP to 4327, SOUND ENERGY CO INC |
Record Last Modified | 2013-10-03 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2006-09-11 | 5107 | 5183 | 7 |
5107 | 5183 | 7 | |
5107 | 5183 | 7 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 80000 Gal | 0 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
1984 | ORION ENERGY CORP | 9732.00 | 0.00 | 365 |
1985 | ORION PETRO CORP | 10040.00 | 0.00 | 365 |
1986 | ORION PETRO CORP | 9812.00 | 72.00 | 365 |
1987 | ORION PETRO CORP | 8070.00 | 0.00 | 365 |
1988 | ORION PETRO CORP | 5879.00 | 0.00 | 365 |
1989 | ORION PETRO CORP | 6.00 | 0.00 | 365 |
1990 | ORION PETRO CORP | 5115.00 | 0.00 | 365 |
1992 | ORION PETRO CORP | 4974.00 | 44.00 | 365 |
1993 | ORION PETRO CORP | 5408.00 | 0.00 | 365 |
1994 | ORION PETRO CORP | 4642.00 | 0.00 | 365 |
1995 | ORION PETRO CORP | 4034.00 | 0.00 | 0 |
1996 | ORION PETRO CORP | 4893.00 | 0.00 | 0 |
1997 | ORION PETRO CORP | 4341.00 | 0.00 | 0 |
1998 | ORION PETRO CORP | 4077.00 | 0.00 | 365 |
1999 | ORION PETRO CORP | 3651.00 | 0.00 | 365 |
2000 | ORION PETRO CORP | 3619.00 | 0.00 | 365 |
2001 | ORION PETRO CORP | 3589.00 | 0.00 | 365 |
2002 | ORION PETRO CORP | 3042.00 | 0.00 | 365 |
2003 | ORION PETRO CORP | 3038.00 | 0.00 | 365 |
2004 | ORION PETRO CORP | 2275.00 | 0.00 | 365 |
2005 | ORION PETRO CORP | 2389.00 | 0.00 | 365 |
2006 | ORION PETRO CORP | 2469.00 | 0.00 | 365 |
2007 | ORION PETRO CORP | 1815.00 | 0.00 | 365 |
2008 | ORION PETRO CORP | 1425.00 | 0.00 | 365 |
2009 | ORION PETRO CORP | 1587.00 | 36.00 | 365 |
2010 | ORION PETRO CORP | 388.00 | 0.00 | 0 |
2011 | SOUND ENERGY CO INC | 1142.00 | 0.00 | 365 |
2012 | SOUND ENERGY CO INC | 1701.00 | 0.00 | 366 |
2013 | SOUND ENERGY CO INC | 697.00 | 0.00 | 365 |
2014 | SOUND ENERGY CO INC | 728.00 | 0.00 | 365 |
2015 | SOUND ENERGY CO INC | 508.00 | 0.00 | 365 |
2016 | SOUND ENERGY CO INC | 602.00 | 0.00 | 365 |
2017 | SOUND ENERGY CO INC | 869.00 | 0.00 | 365 |
2018 | SOUND ENERGY CO INC | 837.00 | 0.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
1984 | ORION ENERGY CORP | Brine | 0 | 365 |
1985 | ORION PETRO CORP | Brine | 16 | 365 |
1986 | ORION PETRO CORP | Brine | 38 | 365 |
1987 | ORION PETRO CORP | Brine | 24 | 365 |
1988 | ORION PETRO CORP | Brine | 19 | 365 |
1989 | ORION PETRO CORP | Brine | 1 | 365 |
1990 | ORION PETRO CORP | Brine | 0 | 365 |
1992 | ORION PETRO CORP | Brine | 40 | 365 |
1993 | ORION PETRO CORP | Brine | 0 | 365 |
1994 | ORION PETRO CORP | Brine | 0 | 365 |
1995 | ORION PETRO CORP | Brine | 0 | 0 |
1996 | ORION PETRO CORP | Brine | 0 | 0 |
1997 | ORION PETRO CORP | Brine | 0 | |
1998 | ORION PETRO CORP | Brine | 30 | 365 |
1999 | ORION PETRO CORP | Brine | 0 | 365 |
2000 | ORION PETRO CORP | Brine | 0 | 365 |
2001 | ORION PETRO CORP | Brine | 0 | 365 |
2002 | ORION PETRO CORP | Brine | 0 | 365 |
2003 | ORION PETRO CORP | Brine | 0 | 365 |
2004 | ORION PETRO CORP | Brine | 0 | 365 |
2005 | ORION PETRO CORP | Brine | 0 | 365 |
2006 | ORION PETRO CORP | Brine | 0 | 365 |
2007 | ORION PETRO CORP | Brine | 45 | 365 |
2008 | ORION PETRO CORP | Brine | 0 | 365 |
2009 | ORION PETRO CORP | Brine | 365 | |
2010 | ORION PETRO CORP | Brine | 0 | 0 |
2011 | SOUND ENERGY CO INC | Brine | 0 | 365 |
2012 | SOUND ENERGY CO INC | Brine | 0 | 366 |
2013 | SOUND ENERGY CO INC | Brine | 0 | 365 |
2014 | SOUND ENERGY CO INC | Brine | 0 | 365 |
2015 | SOUND ENERGY CO INC | Brine | 0 | 365 |
2016 | SOUND ENERGY CO INC | Brine | 41 | 365 |
2017 | SOUND ENERGY CO INC | Brine | 0 | 365 |
2018 | SOUND ENERGY CO INC | Brine | 0 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-908045008 | 2012-8-29 0:00: | DD | No Violations | |
0423206080 | 2017-09-20 | Production Wells | No Violations | On the day of my inspection I found the well equipped with 8 5/8 inch diameter casing, 4 1/2 inch diameter casing, and 1 1/2 inch diameter tubing, operated by a plunger lift system. The production equipment is made up of one 100 bbl. steel tank, a concrete vault, a horizontal separator, and a recording gauge. The production reporting is up to date. The tank need a new ID. I Phoned Bruce Levengood to have it replaced. |
0908045008 | 2012-08-29 | Drill / Deepen / Reopen | No Violations | On location for surface cement job, 20 pipe set at 309 with 760 sacks. Got cement returns to surface. |
423206080 | 2017-9-20 0:00: | PW | No Violations | 1.50 |
For data sources see[9]