If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-157-23669 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.37,"lon":-81.41,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Tuscarawas | |
Municipality: Warwick Township | |
Operator Name: EVERFLOW EASTERN PARTNERS LP | |
Well Pad ID: | |
Farm/Lease Name: ZIMMERMAN-ALCO | |
License Status: Producing | |
License Date: 1981-12-03 | |
Spud Date: 1982-04-20 | |
Spud Drilling Contractor: | |
Final Drill Date: 1982-04-25 | |
Well Total Depth: 5088.00 ft | |
Configuration: Vertical | |
Latitude: 40.370000 | |
Longitude: -81.410000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
CO | 1981-12-03 | 84 EVERFLOW EASTERN PTNS L P GeoDate 12/3/81 |
Original Spud | 1982-04-20 | |
Completed | 1982-04-25 | |
Reached Total Depth | 1982-04-25 | |
Record Last Modified | 2019-06-04 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2006-09-11 | 4911 | 4986 | 13 |
4911 | 4986 | 13 | |
4911 | 4986 | 13 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 88000 Gal | 60000 |
For data sources see[4]
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0618245061 | 2018-08-20 | Production Wells | No Violations | Upon arrival on location, I witnessed the well was equipped with 4.5 inch diameter casing, 1.5 inch diameter tubing, and a plunger lift system. The valves were open on the tubing and on the casing. Production equipment included a steel 210 barrel tank, two horizonal separator, and chart recorder with a 2 by 1.250 inch orifice plate within an earthen dike. Domestic gas was being supplied off the separator. The production report was up to date and proper identification was present. |
1457416200 | 2015-02-05 | Production Wells | No Violations | On the date of inspection I found the production equipment consists of a 100bbl steel tank, two horizontal separators, and a flange within a partial earthen dike. The well is equipped with a gas plunger lift system, 1.5 inch tubing, 4.5 inch casing, and 8.625 inch casing. |
1460396581 | 2016-04-11 | Production Wells | No Violations | On the day of my inspection I found a 4 x 1 1/2 wellhead operated by a plunger lift system. The valves are in the open position. The tank battery is made up of one 100 bbl. tank, a horizontal separator, and a recording gauge all in an earthen dike. The tank is properly identified and production reporting is up to date. There are no violations at this time. |
618245061 | 2018-8-20 0:00: | PW | No Violations | 0.30 |
For data sources see[9]