If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-157-23807 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.5,"lon":-81.49,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Tuscarawas | |
Municipality: Dover Township | |
Operator Name: SOUND ENERGY CO INC | |
Well Pad ID: | |
Farm/Lease Name: COOPER G COMM | |
License Status: Producing | |
License Date: 1982-11-29 | |
Spud Date: 1982-11-29 | |
Spud Drilling Contractor: ARMSTRONG DRLG | |
Final Drill Date: 1982-12-03 | |
Well Total Depth: 4766.00 ft | |
Configuration: Vertical | |
Latitude: 40.500000 | |
Longitude: -81.490000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
CO | 1982-11-29 | 584 UNION CAMP CORP GeoDate 11/29/82 |
Oil and Gas | 1982-11-29 | Issued Date 11/29/82 Expired Date 5/28/83 Acres 0100241 Tool Type RTA Proposed Formation CLINTON Proposed Depth 04766 Proposed Drill Depth 04766 |
Original Spud | 1982-11-29 | |
Completed | 1982-12-03 | |
Reached Total Depth | 1982-12-03 | |
Completion Report Received | 1982-12-09 | |
Construction Permit Expires | 1983-05-28 | |
Change of Owner | 2003-09-30 | Operator changed from 584, UNION CAMP CORP to 4327, SOUND ENERGY CO INC |
Record Last Modified | 2015-09-24 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
1997-06-29 | 0 | 0 | |
0 | 0 | ||
2006-09-11 | 4585 | 4673 | 18 |
4585 | 4673 | 18 | |
0 | 0 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 0 | 0 | FRAC: H2O |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
1985 | BELDEN & BLAKE CORPORATION | 0.00 | 48.00 | 0 |
1986 | BELDEN & BLAKE CORPORATION | 0.00 | 56.00 | 365 |
1988 | BELDEN & BLAKE CORPORATION | 0.00 | 0.00 | 121 |
1993 | UNION CAMP CORP | 1214.00 | 0.00 | 365 |
1997 | UNION CAMP CORP | 0.00 | 0.00 | 0 |
1998 | UNION CAMP CORP | 0.00 | 0.00 | 365 |
1999 | UNION CAMP CORP | 0.00 | 0.00 | 0 |
2000 | UNION CAMP CORP | 0.00 | 0.00 | 365 |
2001 | UNION CAMP CORP | 0.00 | 0.00 | 365 |
2002 | UNION CAMP CORP | 0.00 | 0.00 | 365 |
2003 | SOUND ENERGY CO INC | 402.00 | 0.00 | 365 |
2004 | SOUND ENERGY CO INC | 1805.00 | 0.00 | 365 |
2005 | SOUND ENERGY CO INC | 1220.00 | 73.00 | 365 |
2006 | SOUND ENERGY CO INC | 777.00 | 0.00 | 365 |
2007 | SOUND ENERGY CO INC | 757.00 | 0.00 | 365 |
2008 | SOUND ENERGY CO INC | 802.00 | 0.00 | 365 |
2009 | SOUND ENERGY CO INC | 888.00 | 0.00 | 365 |
2010 | SOUND ENERGY CO INC | 1166.00 | 0.00 | 365 |
2011 | SOUND ENERGY CO INC | 832.00 | 0.00 | 365 |
2012 | SOUND ENERGY CO INC | 799.00 | 0.00 | 366 |
2013 | SOUND ENERGY CO INC | 1032.00 | 0.00 | 365 |
2014 | SOUND ENERGY CO INC | 921.00 | 92.00 | 365 |
2015 | SOUND ENERGY CO INC | 1208.00 | 0.00 | 365 |
2016 | SOUND ENERGY CO INC | 938.00 | 0.00 | 365 |
2017 | SOUND ENERGY CO INC | 897.00 | 0.00 | 365 |
2018 | SOUND ENERGY CO INC | 361.00 | 0.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
1985 | BELDEN & BLAKE CORPORATION | Brine | 14 | 0 |
1986 | BELDEN & BLAKE CORPORATION | Brine | 28 | 365 |
1988 | BELDEN & BLAKE CORPORATION | Brine | 25 | 121 |
1993 | UNION CAMP CORP | Brine | 0 | 365 |
1997 | UNION CAMP CORP | Brine | 0 | 0 |
1998 | UNION CAMP CORP | Brine | 0 | 365 |
1999 | UNION CAMP CORP | Brine | 0 | 0 |
2000 | UNION CAMP CORP | Brine | 0 | 365 |
2001 | UNION CAMP CORP | Brine | 0 | 365 |
2002 | UNION CAMP CORP | Brine | 0 | 365 |
2003 | SOUND ENERGY CO INC | Brine | 0 | 365 |
2004 | SOUND ENERGY CO INC | Brine | 0 | 365 |
2005 | SOUND ENERGY CO INC | Brine | 40 | 365 |
2006 | SOUND ENERGY CO INC | Brine | 0 | 365 |
2007 | SOUND ENERGY CO INC | Brine | 0 | 365 |
2008 | SOUND ENERGY CO INC | Brine | 0 | 365 |
2009 | SOUND ENERGY CO INC | Brine | 0 | 365 |
2010 | SOUND ENERGY CO INC | Brine | 0 | 365 |
2011 | SOUND ENERGY CO INC | Brine | 45 | 365 |
2012 | SOUND ENERGY CO INC | Brine | 0 | 366 |
2013 | SOUND ENERGY CO INC | Brine | 18 | 365 |
2014 | SOUND ENERGY CO INC | Brine | 18 | 365 |
2015 | SOUND ENERGY CO INC | Brine | 0 | 365 |
2016 | SOUND ENERGY CO INC | Brine | 0 | 365 |
2017 | SOUND ENERGY CO INC | Brine | 0 | 365 |
2018 | SOUND ENERGY CO INC | Brine | 0 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0000PL3032 | Preliminary Restoration | No Violations | Preliminary Restoration done information from Data Point | |
0055252340 | 2017-08-15 | Production Wells | No Violations | This is a producing swab well. There were no problems noted at the time of the inspection. |
429678260 | 2020-10-19 0:00 | PW | No Violations | 0.50 |
55252340 | 2017-8-15 0:00: | PW | No Violations | |
PL3032 | PL | No Violations |
For data sources see[9]