X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-157-23869

Well Details

Well ID: 34-157-23869
Loading map...
Country: United States
State: Ohio
County: Tuscarawas
Municipality: Perry Township
Operator Name: JADCO ENERGY INC
Well Pad ID:
Farm/Lease Name: DICKINSON UNIT
License Status: Producing
License Date: 1983-06-07
Spud Date: 1983-09-14
Spud Drilling Contractor: [[JL COATS [COATS-GOFF]]]
Final Drill Date: 1983-09-20
Well Total Depth: 5750.00 ft
Configuration: Vertical
Latitude: 40.240000
Longitude: -81.390000

For data sources see[1]

Well History

Well Status Well Status Date Comment
CO 1983-06-07 311 STOCKER & SITLER INC GeoDate 6/7/83
Oil and Gas 1983-06-07 Issued Date 6/7/83 Expired Date 12/4/83 Acres 0040000 Tool Type RTA Proposed Formation CLINTON Proposed Depth 05750 Proposed Drill Depth 05750
Original Spud 1983-09-14
Completed 1983-09-20
Reached Total Depth 1983-09-20
Completion Report Received 1983-11-07
Construction Permit Expires 1983-12-04
Change of Owner 1999-11-02 Operator changed from 311, STOCKER & SITLER INC to 6295, KNOX ENERGY INC.
Change of Owner 2002-10-03 Operator changed from 6295, KNOX ENERGY INC. to 5815, JADCO ENERGY INC.
Record Last Modified 2017-02-15

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
1997-06-29 5528 5642 0
5528 5642 0
2006-09-11 5542 5633 15
5542 5633 15
5528 5642 0

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
CO2 0 20 Tons 0
ACID 15 250 Gal 0
H2O 0 2119 Bbl 50000 FRAC, WATER, SAND & CO2

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
1984 STOCKER & SITLER INC 11923.00 946.00 365
1985 STOCKER & SITLER INC 9257.00 420.00 0
1986 STOCKER & SITLER INC 9824.00 0.00 365
1987 STOCKER & SITLER INC 5370.00 200.00 365
1988 STOCKER & SITLER INC 8676.00 0.00 0
1989 STOCKER & SITLER INC 5895.00 31.00 365
1990 STOCKER & SITLER INC 11016.00 31.00 365
1991 STOCKER & SITLER INC 2575.00 91.00 365
1993 STOCKER & SITLER INC 3372.00 95.00 365
1994 STOCKER & SITLER INC 3021.00 184.00 0
1995 STOCKER & SITLER INC 2018.00 0.00 0
1996 STOCKER & SITLER INC 1874.00 96.00 0
1997 STOCKER & SITLER INC 1159.00 0.00 365
1998 STOCKER & SITLER INC 1682.00 35.00 365
1999 STOCKER & SITLER INC 1371.00 0.00 365
2000 KNOX ENERGY INC. 2163.00 88.00 365
2001 KNOX ENERGY INC. 1179.00 11.00 365
2002 JADCO ENERGY INC 346.00 0.00 42
2003 JADCO ENERGY INC 1653.00 0.00 365
2004 JADCO ENERGY INC 2552.00 25.00 365
2005 JADCO ENERGY INC 2239.00 44.00 365
2006 JADCO ENERGY INC 1486.00 0.00 365
2007 ORION PETRO CORP 1113.00 0.00 365
2008 JADCO ENERGY INC 1529.00 0.00 365
2009 JADCO ENERGY INC 678.00 0.00 365
2010 JADCO ENERGY INC 329.00 0.00 365
2011 JADCO ENERGY INC 270.00 20.00 365
2012 JADCO ENERGY INC 1177.00 0.00 366
2013 JADCO ENERGY INC 577.00 0.00 365
2014 JADCO ENERGY INC 201.00 20.00 365
2015 JADCO ENERGY INC 296.00 0.00 365
2016 JADCO ENERGY INC 295.00 0.00 365
2017 JADCO ENERGY INC 836.00 0.00 365
2018 JADCO ENERGY INC 257.00 0.00 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
1984 STOCKER & SITLER INC Brine 0 365
1985 STOCKER & SITLER INC Brine 0 0
1986 STOCKER & SITLER INC Brine 0 365
1987 STOCKER & SITLER INC Brine 0 365
1988 STOCKER & SITLER INC Brine 0 0
1989 STOCKER & SITLER INC Brine 0 365
1990 STOCKER & SITLER INC Brine 0 365
1991 STOCKER & SITLER INC Brine 0 365
1993 STOCKER & SITLER INC Brine 0 365
1994 STOCKER & SITLER INC Brine 0 0
1995 STOCKER & SITLER INC Brine 0 0
1996 STOCKER & SITLER INC Brine 0 0
1997 STOCKER & SITLER INC Brine 2 365
1998 STOCKER & SITLER INC Brine 0 365
1999 STOCKER & SITLER INC Brine 0 365
2000 KNOX ENERGY INC. Brine 0 365
2001 KNOX ENERGY INC. Brine 0 365
2002 KNOX ENERGY INC. Brine 0 365
2003 JADCO ENERGY INC Brine 0 365
2004 JADCO ENERGY INC Brine 15 365
2005 JADCO ENERGY INC Brine 34 365
2006 JADCO ENERGY INC Brine 0 365
2007 JADCO ENERGY INC Brine 0 365
2008 JADCO ENERGY INC Brine 0 365
2009 JADCO ENERGY INC Brine 0 365
2010 JADCO ENERGY INC Brine 0 365
2011 JADCO ENERGY INC Brine 0 365
2012 JADCO ENERGY INC Brine 0 366
2013 JADCO ENERGY INC Brine 0 365
2014 JADCO ENERGY INC Brine 0 365
2015 JADCO ENERGY INC Brine 0 365
2016 JADCO ENERGY INC Brine 0 365
2017 JADCO ENERGY INC Brine 0 365
2018 JADCO ENERGY INC Brine 0 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-151874661 2012-2-22 0:00: PW No Violations
0000PL2984 Preliminary Restoration No Violations Preliminary Restoration done information from Data Point
0151874661 2012-02-22 Production Wells No Violations Arrived on location and met with Mr Sprowl. I checked the well and tank and found the well is equipped with its own tank and meter. No violations this date.
0644469665 2015-06-22 Production Wells No Violations At the request of Terri Sprouls I inspected the well. I found a piece of 10 inch casing sticking up, an 8 X 4 wellhead a 4 X 2 7/8 inch wellhead and a 2 7/8 X 1.5 wellhead. The well was idle with the valves on the off position. The tank battery is made up of one 100 bbl tank and a production separator all in an earthen dike. The tank is properly identified. The production reporting is up to date and there are no violation at this time.
1417016912 2014-11-26 Production Wells No Violations On the request of Terry Sprowl I have made the inspection. The well is made up of a 8 X 4 wellhead and a 4 X 1 1/2 wellhead, and operated by a plunger lift system. The tank battery is made up of one 100 bbl tank and a horizontal separator, all in an earthen dike. On the day of my inspection the well was idle, the valves are in the off position. The tank is not properly identified. I called JADCO Energy and informed them they needed to properly Identify the tank. It is to be done in 7 days
172249633 2019-11-15 0:00 PW No Violations 0.30
644469665 2015-6-22 0:00: PW No Violations 1.00
PL2984 PL No Violations

For data sources see[9]

References