Well ID: 34-157-24449
Loading map...
Country: United States
State: Ohio
County: Coshocton
Municipality: Adams Township
Operator Name: HAWKE INC
Well Pad ID:
Farm/Lease Name: WOOD CHARLES LENORA
License Status: Producing
License Date: 1986-08-07
Spud Date: 1986-09-05
Spud Drilling Contractor: CUBBY DRLG
Final Drill Date: 1986-09-13
Well Total Depth: 6892.00 ft
Configuration: Vertical
Latitude: 40.370000
Longitude: -81.690000

For data sources see[1]

Well History

Well Status Well Status Date Comment
Oil and Gas 1986-08-07 Issued Date 8/7/86 Expired Date 8/7/87 Acres 0000000 Tool Type RTAF Proposed Formation Proposed Depth 06892 Proposed Drill Depth 06892
Original Spud 1986-09-03
Completed 1986-09-13
Plugged Back 1986-09-13
Reached Total Depth 1986-09-13
CO 1986-11-04 3893 HAWKEYE INC GeoDate 8/7/86
Completion Report Received 1986-11-13
Construction Permit Expires 1987-08-07
Record Last Modified 2019-06-14

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2006-09-11 4317 4396 21
4317 4396 21
4317 4396 21

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 0 90000 Gal 10000 FRAC: H2O,SAND

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
1987 WOOD CHARLES L 18425.00 259.00 365
1988 WOOD CHARLES L 10405.00 192.00 365
1989 WOOD CHARLES L 4365.00 37.00 365
1990 WOOD CHARLES L 6727.00 0.00 365
1991 HAWKE INC 5430.00 0.00 365
1992 HAWKE INC 4195.00 0.00 365
1993 HAWKE INC 2830.00 0.00 365
1994 HAWKE INC 3480.00 223.00 365
1995 HAWKE INC 2788.00 324.00 365
1996 HAWKE INC 1442.00 125.00 365
1997 HAWKE INC 2410.00 137.00 365
1998 HAWKE INC 2595.00 144.00 365
2000 HAWKE INC 335.00 95.00 365
2001 HAWKE INC 1145.00 49.00 365
2002 HAWKE INC 2210.00 46.00 365
2003 HAWKE INC 670.00 0.00 365
2004 HAWKE INC 967.00 48.00 365
2005 HAWKE INC 860.00 38.00 365
2006 HAWKE INC 849.00 74.00 365
2007 HAWKE INC 1237.00 37.00 365
2008 HAWKE INC 1385.00 82.00 365
2009 HAWKE INC 1396.00 44.00 365
2010 HAWKE INC 1214.00 42.00 365
2011 HAWKE INC 1146.00 60.00 365
2012 HAWKE INC 879.00 102.00 366
2014 HAWKE INC 850.00 55.00 365
2015 HAWKE INC 800.00 50.00 365
2016 HAWKE INC 500.00 20.00 360
2017 HAWKE INC 400.00 20.00 300
2018 HAWKE INC 50.00 25.00 125

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
1987 WOOD CHARLES L Brine 560 365
1988 WOOD CHARLES L Brine 600 365
1989 WOOD CHARLES L Brine 434 365
1990 WOOD CHARLES L Brine 340 365
1991 HAWKE INC Brine 200 365
1992 HAWKE INC Brine 200 365
1993 HAWKE INC Brine 0 365
1994 HAWKE INC Brine 1100 365
1995 HAWKE INC Brine 1288 365
1996 HAWKE INC Brine 700 365
1997 HAWKE INC Brine 120 365
1998 HAWKE INC Brine 0 365
2000 HAWKE INC Brine 30 365
2001 HAWKE INC Brine 0 365
2002 HAWKE INC Brine 0 365
2003 HAWKE INC Brine 0 365
2004 HAWKE INC Brine 0 365
2005 HAWKE INC Brine 0 365
2006 HAWKE INC Brine 0 365
2007 HAWKE INC Brine 70 365
2008 HAWKE INC Brine 76 365
2009 HAWKE INC Brine 22 365
2010 HAWKE INC Brine 0 365
2011 HAWKE INC Brine 0 365
2012 HAWKE INC Brine 44 366
2014 HAWKE INC Brine 25 365
2015 HAWKE INC Brine 25 365
2016 HAWKE INC Brine 20 360
2017 HAWKE INC Brine 20 300
2018 HAWKE INC Brine 10 125

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-293866716 2012-5-25 0:00: PW No Violations 4.00
-744169329 2012-5-24 0:00: PW No Violations 10.00
0000PL2554 Preliminary Restoration No Violations Preliminary Restoration done information from Data Point
0293866716 2012-05-25 Production Wells No Violations I returned to the Regula Pond where the clean up of oil on and around the pond is underway. I met the clean up crew of Greg Wood and Bob Smith on site. The excavated repair site where the 2 inch production line had a previous leaked has not collected any oil. It was closed in and the area we trenched was filled in and closed. The 2nd side of the stream, where the oil entered the pond, had the contaminated soil removed and clean fill put back in its place. The booms are to remain a week or so after the clean up is completed to be sure that all of the oil has been collected. DNR Inspector Grimm will advise when to remove the booms and also approve the final grading.
0332480232 2018-07-16 Production Wells No Violations Upon arrival on location, I witnessed the well was equipped with 4.5 inch diameter casing, 2.375 inch diameter tubing, rods, and a pumping unit operated with a natural gas motor. The well was shut in at the time of the inspection. Production equipment included a steel 210 barrel tanks, a horizonal separator, and a plastic 50 barrel tank within an earthen dike. The production equipment was being shared with the Wood (4448). The production report was up to date and proper identification was in place.
0744169329 2012-05-24 Production Wells No Violations I met Greg Wood and Bob Smith (Smith Trenching and Excavating) and began the clean up. The first thing done was to dig up the gas line where it had been repaired several months ago. After excavating to the previous repair section I conducted a pressure test of the 2 inch steel production line. The line held pressure with no decline. This excavated section was left open to see if any oil collected overnight. Smith excavating also dug along the production line, 40 toward the pond, to see if a point of entry could be established for the oil into the pond. No pathway was discovered. Two (2) floating oil booms were installed along the stream end of the pond, just past the cattails and tall grass. The total length of each boom was around 200. Clean up of the oil contaminated soil was started, with one single axle dump truck load removed to Kimble Landfill. Clean up will continue on Friday.
2134514054 2012-05-23 Production Wells No Violations I met with DNR Inspector Barry Grimm to review an oil spill on the Regula Pond. Clean-up activities are scheduled to begin on 5/24 and I will be in charge of clean-up activities during his absence.
332480232 2018-7-16 0:00: PW No Violations 0.20
PL2554 PL No Violations