If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-157-24569 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.4,"lon":-81.69,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Tuscarawas | |
Municipality: Bucks Township | |
Operator Name: RHDK OIL & GAS LLC/DBA RED HIL | |
Well Pad ID: | |
Farm/Lease Name: ARNOLD HAROLD UNIT | |
License Status: Producing | |
License Date: 1987-08-19 | |
Spud Date: 1987-09-12 | |
Spud Drilling Contractor: CUBBY DRLG | |
Final Drill Date: 1987-09-17 | |
Well Total Depth: 6921.00 ft | |
Configuration: Vertical | |
Latitude: 40.400000 | |
Longitude: -81.690000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
CO | 1987-08-19 | 168 RED HILL DEVELOPMENT GeoDate 8/19/87 |
Oil and Gas | 1987-08-19 | Issued Date 8/19/87 Expired Date 8/18/88 Acres 0140000 Tool Type CRAF Proposed Formation ROSE RUN Proposed Depth 06921 Proposed Drill Depth 06921 |
Original Spud | 1987-09-12 | PERMIT EXPIRED. |
Completed | 1987-09-17 | PERMIT EXPIRED. |
Reached Total Depth | 1987-09-17 | PERMIT EXPIRED. |
Construction Permit Expires | 1988-08-18 | PERMIT EXPIRED. |
Completion Report Received | 1990-01-19 | PERMIT EXPIRED. |
Record Last Modified | 2017-02-15 | PERMIT EXPIRED. |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2006-09-11 | 6699 | 6701 | 3 |
6699 | 6701 | 3 | |
6699 | 6701 | 3 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
ACID | 0 | 1000 Gal | 0 | ACIDIZED W/1000 GAL HCL |
For data sources see[4]
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-258882266 | 2017-10-31 0:00 | PW | No Violations | 0.50 |
-948398703 | 2017-7-24 0:00: | PW | No Violations | 0.50 |
0000PL2451 | Preliminary Restoration | No Violations | Preliminary Restoration done information from Data Point | |
0258882266 | 2017-10-31 | Production Wells | No Violations | Upon arrival on location I found the rig crew ready to drill out the bridge plug and cleanout to bottom of the wellbore. |
0948398703 | 2017-07-24 | Production Wells | No Violations | On the day of my inspection I found the well equipped with 8 5/8 inch diameter casing, 4 1/2 inch diameter casing, and 2 3/8 inch diameter tubing, operated by a plunger lift system. The production equipment is made up of one 210 bbl. steel tank, a horizontal production separator, all in an earthen dike. The production reporting is up to date, and the tank are properly identified. |
1314905412 | 2017-10-04 | Work Over Reconditioning | No Violations | This well has a hole in the 8-5/8 casing at 37. The 4-1/2 casing was uscrewed at 968 and a DV tool was run back in the hole in the string and they srcewed back on at 968. The DV tool is at 926. The DV tool did not open properly but did open. Halliburton Services broke circulation and pumped 35 bbls of gel and 10 bbls of water ahead of 51 bbls of cement. 9 bbls of good cement were returned to the surface. Cement circulated thru the 8-5/8 x 11-3/4 annulus and the 4-1/2 x 8-5/8 annulus. A pressure test was not achieved as the DV tool apparently did not close properly. The well was shut in to wait until the cement set. |
1504005258 | 2017-08-28 | Production Wells | No Violations | Upon arrival on location if found that the rig crew had run 3/4 inch diameter tubing to a depth of 90 feet. They began grouting from that depth, circulation was established and the cement was pumped. |
1504115042 | 2017-08-30 | Production Wells | No Violations | Upon arrival on location I met with Chris Kimble with Red Hill. Way to complete the project was discussed. The concern is that a coal seam is corroding the 8 5/8 inch diameter casing and can attack the 4 1/2 inch diameter casing. Different options were discussed and forward on the Mike Moreland and Brent Bear for approval. A concern was raised about plugging down the road. |
1506446600 | 2017-09-26 | Production Wells | No Violations | |
1787592428 | 2020-9-8 0:00:0 | PW | No Violations | 0.30 |
1816474371 | 2017-09-18 | Production Wells | No Violations | Upon arrival on location I found that the rig crew had left for the day. Trying to get an update on the progress of the well. |
PL2451 | PL | No Violations |
For data sources see[9]