If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 34-157-24753 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.62,"lon":-81.55,"icon":""}]} |
| Country: United States | |
| State: Ohio | |
| County: Tuscarawas | |
| Municipality: Franklin Township | |
| Operator Name: SOUND ENERGY CO INC | |
| Well Pad ID: | |
| Farm/Lease Name: ANDREAS F COMM #2 | |
| License Status: Producing | |
| License Date: 1990-12-11 | |
| Spud Date: 1991-02-09 | |
| Spud Drilling Contractor: [[P&R INC [PEEK & ROWAN]]] | |
| Final Drill Date: 1991-02-15 | |
| Well Total Depth: 4553.00 ft | |
| Configuration: Vertical | |
| Latitude: 40.620000 | |
| Longitude: -81.550000 |
For data sources see[1]
| Well Status | Well Status Date | Comment |
|---|---|---|
| CO | 1989-12-21 | 182 BELDEN & BLAKE CO GeoDate 12/21/89 |
| Oil and Gas | 1989-12-21 | Issued Date 12/21/89 Expired Date 12/21/90 Acres 0040000 Tool Type CRAF Proposed Formation CLINTON/ROSE Proposed Depth 00000 Proposed Drill Depth 00000 |
| CO | 1990-12-11 | 182 BELDEN & BLAKE CO GeoDate 12/11/90 |
| Oil and Gas | 1990-12-11 | Issued Date 12/11/90 Expired Date 12/11/91 Acres 0040000 Tool Type CRAF Proposed Formation CL/ROSE RUN Proposed Depth 04553 Proposed Drill Depth 04553 |
| Original Spud | 1991-02-09 | RI 12-15-90 |
| Completed | 1991-02-15 | RI 12-15-90 |
| Reached Total Depth | 1991-02-15 | RI 12-15-90 |
| Completion Report Received | 1991-02-27 | RI 12-15-90 |
| Construction Permit Expires | 1991-12-11 | RI 12-15-90 |
| Change of Owner | 1998-08-17 | Operator changed from 182, BELDEN & BLAKE CORPORATION to 1966, PETROX INC |
| Change of Owner | 1998-08-19 | Operator changed from 1966, PETROX INC to 4327, SOUND ENERGY CO INC |
| Record Last Modified | 2017-02-15 | RI 12-15-90 |
For data sources see[2]
| Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
|---|---|---|---|
| 1997-06-29 | 4283 | 4413 | 0 |
| 4283 | 4413 | 0 | |
| 2006-09-11 | 4300 | 4400 | 40 |
| 4300 | 4400 | 40 | |
| 4283 | 4413 | 0 |
For data sources see[3]
| Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
|---|---|---|---|---|---|---|
| H2O | 0 | 2000 Bbl | 30000 | FRAC:WATER/SAND |
For data sources see[4]
| Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 1991 | BELDEN & BLAKE CORPORATION | 4758.00 | 0.00 | 365 |
| 1992 | BELDEN & BLAKE CORPORATION | 2908.00 | 0.00 | 360 |
| 1993 | BELDEN & BLAKE CORPORATION | 1465.00 | 0.00 | 362 |
| 1994 | BELDEN & BLAKE CORPORATION | 1190.00 | 97.00 | 295 |
| 1995 | BELDEN & BLAKE CORPORATION | 1460.00 | 0.00 | 332 |
| 1996 | BELDEN & BLAKE CORPORATION | 750.00 | 0.00 | 303 |
| 1997 | BELDEN & BLAKE CORPORATION | 306.00 | 0.00 | 92 |
| 1998 | SOUND ENERGY CO INC | 0.00 | 0.00 | 365 |
| 1999 | SOUND ENERGY CO INC | 826.00 | 0.00 | 365 |
| 2000 | SOUND ENERGY CO INC | 1094.00 | 54.00 | 365 |
| 2001 | SOUND ENERGY CO INC | 1128.00 | 0.00 | 365 |
| 2002 | SOUND ENERGY CO INC | 967.00 | 0.00 | 365 |
| 2003 | SOUND ENERGY CO INC | 804.00 | 0.00 | 365 |
| 2004 | SOUND ENERGY CO INC | 804.00 | 20.00 | 365 |
| 2005 | SOUND ENERGY CO INC | 793.00 | 0.00 | 365 |
| 2006 | SOUND ENERGY CO INC | 838.00 | 0.00 | 365 |
| 2007 | SOUND ENERGY CO INC | 726.00 | 0.00 | 365 |
| 2008 | SOUND ENERGY CO INC | 592.00 | 0.00 | 365 |
| 2009 | SOUND ENERGY CO INC | 414.00 | 0.00 | 365 |
| 2010 | SOUND ENERGY CO INC | 324.00 | 0.00 | 365 |
| 2011 | SOUND ENERGY CO INC | 357.00 | 0.00 | 365 |
| 2012 | SOUND ENERGY CO INC | 395.00 | 0.00 | 366 |
| 2013 | SOUND ENERGY CO INC | 389.00 | 0.00 | 365 |
| 2014 | SOUND ENERGY CO INC | 198.00 | 0.00 | 365 |
| 2015 | SOUND ENERGY CO INC | 138.00 | 0.00 | 365 |
| 2016 | SOUND ENERGY CO INC | 141.00 | 0.00 | 365 |
| 2017 | SOUND ENERGY CO INC | 168.00 | 0.00 | 365 |
| 2018 | SOUND ENERGY CO INC | 141.00 | 0.00 | 365 |
| Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|
| -504660212 | 2015-4-15 0:00: | PW | No Violations | 0.50 |
| -614161700 | 2020-8-25 0:00: | PW | No Violations | 0.70 |
| 0504660212 | 2015-04-15 | Production Wells | No Violations | On the day of my inspection I found 10 inch casing, a 8 X 4 wellhead with a 4 inch valve on top. The well is operated with a jet Star production lift. The tank battery is made up of one 210 bbl tank, one 50 bbl tank, and a horizontal separator all in an earthen dike. The tank is properly identified, and the production reporting is up to date. There are no violations at this time. |
| 1366077319 | 2003-10-16 | Preliminary Restoration | No Violations |
For data sources see[9]