If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 34-157-25122 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.61,"lon":-81.5,"icon":""}]} |
| Country: United States | |
| State: Ohio | |
| County: Tuscarawas | |
| Municipality: Lawrence Township | |
| Operator Name: SOUND ENERGY CO INC | |
| Well Pad ID: | |
| Farm/Lease Name: KOHL | |
| License Status: Producing | |
| License Date: 2001-08-09 | |
| Spud Date: 2001-11-16 | |
| Spud Drilling Contractor: MARIC DRILLING CO. | |
| Final Drill Date: 2001-11-20 | |
| Well Total Depth: 4715.00 ft | |
| Configuration: Vertical | |
| Latitude: 40.610000 | |
| Longitude: -81.500000 |
For data sources see[1]
| Well Status | Well Status Date | Comment |
|---|---|---|
| APP | 2001-08-09 | Proposed Formations:CLINTON, Issued Date:8/9/2001, Expired Date:8/9/2002 6:00:00 AM, Drilling unit acres:53, Proposed Well Type:OG, Proposed Well Class:POOL |
| Original Spud | 2001-11-16 | RBDMS Rec |
| Completed | 2001-11-20 | RBDMS Rec |
| Reached Total Depth | 2001-11-20 | RBDMS Rec |
| Correction to Well | 2001-12-07 | CHANGE IN ACREAGE TO 51.713 |
| Completion Report Received | 2001-12-26 | RBDMS Rec |
| Construction Permit Expires | 2002-08-09 | RBDMS Rec |
| Change of Owner | 2016-04-13 | Operator changed from 2050, ORION PETRO CORP to 4327, SOUND ENERGY CO INC |
| Record Last Modified | 2017-02-15 | RBDMS Rec |
For data sources see[2]
| Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
|---|---|---|---|
| 2002-01-30 | 4538 | 4620 | 43 |
| 4538 | 4620 | 43 | |
| 4538 | 4620 | 43 |
For data sources see[3]
| Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
|---|---|---|---|---|---|---|
| H2O | 15 | 51600 Gal | 15000 | 500 GALLONS HCL ACID |
For data sources see[4]
| Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 2001 | ORION PETRO CORP | 0.00 | 0.00 | 19 |
| 2002 | ORION PETRO CORP | 10174.00 | 203.00 | 365 |
| 2003 | ORION PETRO CORP | 6380.00 | 65.00 | 365 |
| 2004 | ORION PETRO CORP | 5096.00 | 57.00 | 365 |
| 2005 | ORION PETRO CORP | 5048.00 | 42.00 | 365 |
| 2006 | ORION PETRO CORP | 4101.00 | 0.00 | 365 |
| 2007 | ORION PETRO CORP | 3269.00 | 0.00 | 365 |
| 2008 | ORION PETRO CORP | 3308.00 | 62.00 | 365 |
| 2009 | ORION PETRO CORP | 2828.00 | 0.00 | 365 |
| 2010 | ORION PETRO CORP | 2849.00 | 50.00 | 0 |
| 2011 | ORION PETRO CORP | 2059.00 | 0.00 | 0 |
| 2012 | ORION PETRO CORP | 2041.00 | 0.00 | 366 |
| 2014 | ORION PETRO CORP | 1479.00 | 0.00 | 365 |
| 2015 | ORION PETRO CORP | 1292.00 | 0.00 | 365 |
| 2016 | ORION PETRO CORP | 316.00 | 58.00 | 103 |
| 2017 | SOUND ENERGY CO INC | 1150.00 | 0.00 | 365 |
| 2018 | SOUND ENERGY CO INC | 827.00 | 0.00 | 365 |
| Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
|---|---|---|---|---|
| 2001 | ORION PETRO CORP | Brine | 1415 | 19 |
| 2002 | ORION PETRO CORP | Brine | 165 | 365 |
| 2003 | ORION PETRO CORP | Brine | 50 | 365 |
| 2004 | ORION PETRO CORP | Brine | 0 | 365 |
| 2005 | ORION PETRO CORP | Brine | 20 | 365 |
| 2006 | ORION PETRO CORP | Brine | 0 | 365 |
| 2007 | ORION PETRO CORP | Brine | 0 | 365 |
| 2008 | ORION PETRO CORP | Brine | 0 | 365 |
| 2009 | ORION PETRO CORP | Brine | 365 | |
| 2010 | ORION PETRO CORP | Brine | 0 | 0 |
| 2011 | ORION PETRO CORP | Brine | 0 | |
| 2012 | ORION PETRO CORP | Brine | 0 | 366 |
| 2014 | ORION PETRO CORP | Brine | 0 | 365 |
| 2015 | ORION PETRO CORP | Brine | 0 | 365 |
| 2016 | ORION PETRO CORP | Brine | 0 | 103 |
| 2017 | SOUND ENERGY CO INC | Brine | 0 | 365 |
| 2018 | SOUND ENERGY CO INC | Brine | 75 | 365 |
| Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|
| -1211355809 | 2014-12-30 0:00 | PW | No Violations | 1.50 |
| 1211355809 | 2014-12-30 | Production Wells | No Violations | On the day of my inspection I found an 8 X 4 Wellhead and a 4 X 1.5 wellhead operated by a plunger lift system. A 100 bbl tank, a 50 bbl brine tank, a horizontal separator all in an earthen dike. The site is properly identified and there are no violations at this time. The production reporting is up to date. |
| 1542291189 | 2018-11-15 | Production Wells | No Violations | Upon arrival on location, I witnessed the well was equipped with 4.5 inch diameter casing, 1.5 inch diameter tubing, and a plunger lift system. The valves on the tubing and on the casing were open. Production equipment included a steel 100 barrel tank, a steel 50 barrel tank, a horizonal separator, and a chart recorder with a 2 by .750 inch orifice plate within an earthen dike. The production report was up to date and proper identification was present. |
For data sources see[9]