X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-163-20312

Well Details

Well ID: 34-163-20312
Loading map...
Country: United States
State: Ohio
County: Vinton
Municipality: Knox Township
Operator Name: J D DRILLING COMPANY
Well Pad ID:
Farm/Lease Name: MCCATHREN VELMA {ERP #4}
License Status: Active Injection
License Date: 1982-09-15
Spud Date: 1982-10-02
Spud Drilling Contractor: SERVICE RIG
Final Drill Date: 1982-10-20
Well Total Depth: 1313.00 ft
Configuration: Vertical
Latitude: 39.220000
Longitude: -82.300000

For data sources see[1]

Well History

Well Status Well Status Date Comment
CO 1982-09-15 116 J D DRILLING CO GeoDate 9/15/82
Enhanced Recovery 1982-09-15 Issued Date 9/15/82 Expired Date 3/15/83 Acres 0120000 Tool Type CT Proposed Formation BEREA Proposed Depth 01313 Proposed Drill Depth 01313
Original Spud 1982-10-02 ALSO DRILLED BY ROY GORDON DRILLING CONVERT 9-18-82 PRODUCTION FOUND IN NSR.
Completed 1982-10-20 ALSO DRILLED BY ROY GORDON DRILLING CONVERT 9-18-82 PRODUCTION FOUND IN NSR.
Reached Total Depth 1982-10-20 ALSO DRILLED BY ROY GORDON DRILLING CONVERT 9-18-82 PRODUCTION FOUND IN NSR.
First Injection 1982-10-21 ALSO DRILLED BY ROY GORDON DRILLING CONVERT 9-18-82 PRODUCTION FOUND IN NSR.
Completion Report Received 1982-12-28 ALSO DRILLED BY ROY GORDON DRILLING CONVERT 9-18-82 PRODUCTION FOUND IN NSR.
Construction Permit Expires 1983-03-15 ALSO DRILLED BY ROY GORDON DRILLING CONVERT 9-18-82 PRODUCTION FOUND IN NSR.
Annulus Pressure Monitoring Approved 1987-05-29 ALSO DRILLED BY ROY GORDON DRILLING CONVERT 9-18-82 PRODUCTION FOUND IN NSR.
Last Compliance Report 2000-04-13 ALSO DRILLED BY ROY GORDON DRILLING CONVERT 9-18-82 PRODUCTION FOUND IN NSR.
Record Last Modified 2017-02-15 ALSO DRILLED BY ROY GORDON DRILLING CONVERT 9-18-82 PRODUCTION FOUND IN NSR.

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2000-04-13 1303 1313 0
1303 1313 0
1303 1313 0

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
NITR 0 14 Qts 0

For data sources see[4]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1012389586 2003-3-25 0:00: ER No Violations
-1037348980 2019-12-19 0:00 ER No Violations 1.80
-1041446285 2010-3-17 0:00: ER No Violations
-1236532552 2013-1-24 0:00: ER No Violations 1.00
-1239644090 2011-1-18 0:00: ER No Violations 1.00
-1261925949 2008-9-11 0:00: ER No Violations
-143428826 2009-3-3 0:00:0 ER No Violations
-1498602315 2008-1-8 0:00:0 ER No Violations
-1569550209 2014-9-15 0:00: ER No Violations 0.70
-1585994299 2016-7-29 0:00: ER No Violations 1.00
-161513594 2018-3-22 0:00: SW No Violations 1.00
-1643539118 2016-3-9 0:00:0 ER No Violations 1.50
-1649703930 2008-3-24 0:00: ER No Violations
-1657548908 2005-9-7 0:00:0 ER No Violations
-1687711470 2009-10-9 0:00: AM No Violations
-1730612382 2013-7-29 0:00: ER No Violations 1.00
-1841085052 2020-4-14 0:00: ER No Violations 1.00
-1884535310 2012-8-30 0:00: ER No Violations 1.20
-189290021 2015-5-21 0:00: ER No Violations 1.00
-190111551 2016-2-22 0:00: ER No Violations 2.00
-1982937679 2016-12-7 0:00: ER No Violations 2.80
-1995689757 2014-3-4 0:00:0 ER No Violations 3.00
-2008999464 2014-5-21 0:00: ER No Violations 1.50
-2049715836 2016-6-9 0:00:0 ER No Violations 0.50
-2057163700 2019-11-6 0:00: ER No Violations 1.00
-2061096150 2011-4-11 0:00: ER No Violations
-2063213100 2013-2-28 0:00: ER No Violations 1.00
-2138242437 2015-3-11 0:00: ER No Violations 2.00
-2140942406 2008-1-17 0:00: ER No Violations
-215323413 2017-7-18 0:00: SW No Violations 0.20
-230200957 2007-7-3 0:00:0 ER No Violations
-267515736 2018-7-3 0:00:0 ER No Violations 1.00
-291980358 2005-6-8 0:00:0 SW No Violations
-293295334 2013-8-5 0:00:0 ER No Violations 1.00
-336896338 2010-7-8 0:00:0 ER No Violations
-345684535 2015-3-16 0:00: ER No Violations 1.00
-373352770 2007-1-11 0:00: ER No Violations
-392076185 2011-3-30 0:00: ER No Violations
-392775226 2009-12-9 0:00: ER No Violations
-457544218 2013-5-21 0:00: SW No Violations 1.00
-459776944 2013-5-21 0:00: ER No Violations 2.50
-52499805 2009-9-1 0:00:0 ER No Violations
-551397954 2006-1-25 0:00: ER No Violations
-615516286 2012-6-14 0:00: ER No Violations 1.00
-71797701 2015-8-10 0:00: ER No Violations 0.70
-811122013 2003-4-21 0:00: ER No Violations
-825786322 2007-1-18 0:00: ER No Violations
-870234469 2005-1-12 0:00: ER No Violations
-88105518 2015-10-15 0:00 ER No Violations 1.00
-907894614 2010-12-28 0:00 ER No Violations 0.50
-922983479 2007-11-1 0:00: ER No Violations
-95719037 2017-4-10 0:00: ER No Violations 1.00
0000PL2330 Preliminary Restoration No Violations Preliminary Restoration done information from Data Point
0001269i11 2001-01-17 Enhanced Recovery Project Violations Noted An inspection of the well revealed No ID at the well or tanks , electric line between well and tanks need hung in a safe manner , some brine soils in dike around tank needs removed .
0041710203 2017-05-15 Enhanced Recovery Project Violations Noted Our records indicate that the Division has not received the Enhanced Recovery Annual Report (Form 204) that was due on April 15th for 2016, despite a letter that was sent April 28, 2017 with a deadline of May 12, 2017 to submit the reports requested. please submit the requested Forms to the Division by 5/26/2017. REPORTS RECEIVED 7/3/2017
0052499805 2009-09-01 Enhanced Recovery Project No Violations A follow-up inspection was conducted with Mr. Jeff Fry, West Region Oil & Gas Supervisor and UIC Field Supervisor. No injection or annulus pressure observed during the inspection. The pump is still leaking and tears in liner have not been addressed.
005609i206 2001-06-01 Enhanced Recovery Project No Violations No violations.
0071797701 2015-08-10 Enhanced Recovery Project No Violations Inspected the containment dike, tank, injection pump, injection line, injection pressure and annulus pressure. Assisted UIC section Geologist in measuring the containment dike.
0088105518 2015-10-15 Enhanced Recovery Project No Violations Inspected the containment dikes, tank, injection pump, injection line, injection pressure and annulus pressure. Dikes were free of fluids.
0095719037 2017-04-10 Enhanced Recovery Project No Violations Inspected the containment dikes, tank, injection pump, injection line, injection pressure and annulus pressure. Identification posted on the tank. The containment dikes are free of fluids.
0143428826 2009-03-03 Enhanced Recovery Project No Violations An inspection revealed no annulus pressure at this time. JD Drilling will be contacted regarding this inspection.
0161513594 2018-03-22 Salt Water Injection Well No Violations The salt water injection well had 24 psi on the annulus and 0 psi on the injection tubing. The dike was relativity free of fluids. Legible identification was posted.
0166977460 2007-04-19 Enhanced Recovery Project No Violations An inspection revealed that fitting will need replaced on annulus side of the well.
0174466989 2009-06-11 Enhanced Recovery Project Violations Noted An inspection revealed 1 to 4 of fluid inside the dike around the well head. High Range Quantabs revealed Cl- as test was stopped after 4.5 units. The pump at this location was leaking and found to contain a constant drip. Approximately ten 4-6 tears were observed in liner 2-3 from top of dike. The dike height is 5. The identification at the storage tank is missing ERP# and the permit number has faded. Correct identification at the storage tank by providing ERP# and permit number (faded). Repair/and or replace liner at well head location. Approximately (10) tears observed. The pump at this location was leaking. Fluid inside dike contains chloride.
0189290021 2015-05-21 Enhanced Recovery Project Violations Noted Inspected the containment dikes, tank, injection pump, injection line, and annulus pressure. The Injection tubing 1/4 needle valve would not open to allow a pressure reading with the state gauge. The annulus had a slight vacuum then went to zero pressure. I notified Jonathan Reese (JD Drilling field supervisor) that the 1/4 injection valve must be replaced and the annulus must be tested. We discussed the fact that they must monitor the annulus pressure.
0190111551 2016-02-22 Enhanced Recovery Project Violations Noted Inspected the containment dike, tank, injection pump, injection line, injection pressure and annulus pressure. Containment dike has 18 of oil and water in it. I contacted Jonathan Reese and he is sending someone to pump out the dike on 2-23-16.
0215323413 2017-07-18 Salt Water Injection Well No Violations Quarterly UIC inspection. The annulus pressure was 64 PSI, the injection tubing was 49 PSI. Legible identification was posted. No violations noted.
0230200957 2007-07-03 Enhanced Recovery Project No Violations A follow-up inspection revealed that the well is in-compliance.
0267515736 2018-07-03 Enhanced Recovery Project No Violations Inspected the containment dike, tank, injection pump, injection line, injection pressure and annulus pressure. Identification is posted on the tank. The containment dike is free of fluids.
0291980358 2005-06-08 Salt Water Injection Well Violations Noted An inspection of the well revealed ID needs rewrote at well and storage tank, need a new plastic liner around the well and under the water pump, repair leaking water pump.
0293295334 2013-08-05 Enhanced Recovery Project No Violations Dike is free of water. Needle valve on annulus has not been replaced.
0319345482 2006-09-20 Enhanced Recovery Project Violations Noted An inspection was conducted at the facility owned by JD Drilling., on 9/20/2006. During the inspection, it was noted that the identification located at the storage tank contained the wrong permit number, and the dike surrounding the well needs pumped. Also noted was that a mini test would be required.
0322086560 2003-06-30 Enhanced Recovery Project No Violations No violations
0336896338 2010-07-08 Enhanced Recovery Project No Violations An inspection revealed no violations at this time. The lease road has been graded since the last inspection.
0345684535 2015-03-16 Enhanced Recovery Project No Violations Compliance notice follow up. Oil has been removed from the containment dike. Inspected the containment dikes, tank, injection pump, injection line, injection pressure and annulus pressure. Identification posted on tank.
0358716825 2013-09-09 Enhanced Recovery Project No Violations Inspected the containment dike, tank, annulus pressure, and injection pressure. Good identification at the wellhead. Dike is free of water.
0373352770 2007-01-11 Enhanced Recovery Project Violations Noted On 1/11/2007, an inspection revealed that there was no pressure on the annulus side of the well. JD Drilling stated that valve to the well was closed and they were not injecting any fluid, The company stated that this deficiency would be corrected within a week.
0392076185 2011-03-30 Enhanced Recovery Project Violations Noted 1/4 needle valve on injection tubing not operational. Pump was running. I was unable to open needle valve to check pressure. Annulus had zero pressure. I called and talked to Jonathan Reese and he told me that he is planning on replacing the dike liner and working on the well as soon as the weather improves. I told him to schedule a annulus test with me and to replace the 1/4 valve on the injection tubing.
0392775226 2009-12-09 Enhanced Recovery Project No Violations A follow-up inspection revealed positive pressure on the annular side of well and the identification has been corrected. The previously noted tears in liner for the dike around the well (separate from tank) have not been repaired. The P&C has been resolved.
0397003039 2011-08-04 Enhanced Recovery Project No Violations FOLLOW UP TO NOV # 1968072623 Annulus has zero pressure. I called Spence Carpenter and he is scheduling the test for next week.
0420177134 2013-03-01 Enhanced Recovery Project No Violations Witnessed mini test on annulus (600 psi for 15 minutes with no loss in pressure.)
0433452356 2004-03-04 Enhanced Recovery Project No Violations No violations.
0457544218 2013-05-21 Salt Water Injection Well No Violations I accompanied Jon Scott on the inspection of this well.
0459776944 2013-05-21 Enhanced Recovery Project No Violations Inspected the injection pressure, annulus pressure, containment dike and tank. Accompanied by Kip Thompson MRI.
0460479001 2011-11-18 Enhanced Recovery Project No Violations ERP inspection. With Andy Thomas MRI. No violations observed during inspection.
0533391033 2008-05-27 Enhanced Recovery Project No Violations No violations were noted.
0537808786 2006-10-12 Enhanced Recovery Project No Violations A follow-up inspection conducted on 10/12/2006 revealed that the previously noted violations have been resolved. A mini-test was also performed. After 15 minutes the pressure only dropped from 148psi to 147psi.
0551397954 2006-01-25 Enhanced Recovery Project No Violations No violations, will need tested in spring.
0607438420 2016-02-26 Enhanced Recovery Project No Violations Compliance Notice 3 190111551 follow up inspection. Oil has been removed from the containment dike. Water level in dike is 6. Talked to Jonathan Reese and they are reworking the electric to the sump pump.
0615516286 2012-06-14 Enhanced Recovery Project No Violations Identification needs to be placed on well head and identification on tanks needs re-written. Spoke with Mr. Jonathon Reese about this. He stated he would put his guys right on it.
0624334270 2015-06-08 Enhanced Recovery Project No Violations Compliance Notice # 189290021 Follow up inspection. The 1/4 needle valve on the injection tubing has been replaced. The annulus has zero pressure. I called and talked to Tom Schoonover about the need to maintain the annulus pressure. Annulus test has been scheduled for 6-9-15.
0653587334 2016-03-17 Enhanced Recovery Project Violations Noted Our records indicate that the Division has not received the Enhanced Recovery Annual Report (Form 204) that was due on February 15th for 2015, despite a letter that was sent March 1, 2016 with a deadline of March 15, 2016 to submit the reports requested. Form 204 received 7/13/2017
0658638965 2011-03-30 Enhanced Recovery Project No Violations FOLLOW UP TO NOV # -392076185 1/4 needle valve on injection tubing not operational. Pump was running. I was unable to open needle valve to check pressure. Annulus had zero pressure. I called and talked to Jonathan Reese and he told me that he is planning on replacing the dike liner and working on the well as soon as the weather improves. I told him to schedule a annulus test with me and to replace the 1/4 valve on the injection tubing.
0811122013 2003-04-21 Enhanced Recovery Project No Violations No violations at this time.
0819805016 2007-12-17 Enhanced Recovery Project No Violations A follow-up inspection revealed non-compliance. The annulus could not be tested, due to a stripped bolt. Vacuum was observed on the injection side of the well.
0824031274 2011-03-30 Enhanced Recovery Project No Violations FOLLOW UP TO NOV # 658638965 FOLLOW UP TO NOV # -392076185 1/4 needle valve on injection tubing not operational. Pump was running. I was unable to open needle valve to check pressure. Annulus had zero pressure. I called and talked to Jonathan Reese and he told me that he is planning on replacing the dike liner and working on the well as soon as the weather improves. I told him to schedule a annulus test with me and to replace the 1/4 valve on the injection tubing.
0825786322 2007-01-18 Enhanced Recovery Project No Violations On 1/18/2007, a inspection was conducted to check the status of annulus pressure. No pressure was observed. Mr. Spence Carpenter, JD Drilling, was contacted and informed of the results. Mr. Carpenter stated that a mini-test would be performed next week. He was also informed that this would be witnessed by the Division of Mineral Resources.
0857594848 2007-02-20 Enhanced Recovery Project No Violations On 2/20/2007, a mini-test was performed on the EOR well with a representative from JD Drilling, Mr. John Reese. This well passed the required test with only 4psi loss in fifteen minutes. Also noted was that a broken valve had released pressure therefore, leading to no pressure on the annulus side of the well. The previously noted violation has been resolved.
0870234469 2005-01-12 Enhanced Recovery Project No Violations No violations.
0891212815 2018-05-04 Enhanced Recovery Project Violations Noted Our records indicate that the Division has not received the 2017 Enhanced Recovery Well Annual Report (Form 204) that was due to the Division by April 15, 2018. Please submit the requested report by June 4, 2018.
0907894614 2010-12-28 Enhanced Recovery Project No Violations An inspection revealed pump running, but no observed pressure on injection side of well with gauge. Snow cover at time of inspection. Also noted, no pressure on the annulus. The inspection will be discussed with the company.
0922983479 2007-11-01 Enhanced Recovery Project Violations Noted An inspection revealed that the fittings on the annulus and injection side of the well will need replaced. Unable to test pressure with gauge.
1012389586 2003-03-25 Enhanced Recovery Project No Violations No violations at this time.
1041446285 2010-03-17 Enhanced Recovery Project No Violations An inspection revealed no violations at this time. At 1:50 pm, JD Drilling Co. was notified that annulus does not contain positive pressure.
1065882941 2013-05-20 Enhanced Recovery Project No Violations Inspected the injection pressure, annulus pressure, containment dike and tank. Brine pump has a steady leak, I called Tom well tender and told him that the pump was leaking (brine is contained in a containment dike. Tom said that he will fix the leak and pump out the dike.
1082723542 2018-10-02 Enhanced Recovery Project No Violations Inspected the containment dike, tank, injection pump, injection pressure and annulus pressure. Identification is posted. The containment dike has 6 inches of fresh water in it. I contacted Tom Schoonover and told him to pump out the containment dike.
1086072014 2014-08-20 Enhanced Recovery Project No Violations Inspected the containment dike, tank, injection pump, injection line, annulus pressure and injection pressure. Identification posted on tank.
1116613111 2004-07-29 Enhanced Recovery Project No Violations No violations.
1123786888 2017-12-14 Salt Water Injection Well No Violations My inspection revealed the salt water injection well had 95 psi on the annulus. The injection tubing was on vacuum. The dike was free of fluid. Legible identification was posted.
1125766409 2018-05-08 Enhanced Recovery Project No Violations Inspected the containment dike, tank, injection pump, injection line, injection pressure and annulus pressure. Identification is posted. The containment dike is free of fluids.
1152882217 2006-07-12 Enhanced Recovery Project No Violations On 7/12/2006, an inspection was conducted at the facility owned by JD Drilling Company. No violations were noted.
1178911361 2007-04-26 Enhanced Recovery Project Violations Noted An inspection revealed that fitting has been replaced however, pressure will need to be placed on the annulus.
1236532552 2013-01-24 Enhanced Recovery Project No Violations No violations were found at the well, tank battery or other facilities at this site. There was no fluid in any of the containment dikes. New identification has been posted the tank. Accompanied on inspection by Justin Smith.
1239105664 2007-06-05 Enhanced Recovery Project No Violations A follow-up inspection revealed non-compliance.
1239644090 2011-01-18 Enhanced Recovery Project No Violations An inspection revealed injection at time of inspection. Although the pump was running, no pressure could be obtained on injection side of well. An approximate 10 x 5 area inside the dike at 100 bbl tank location contained oil with applied saw dust. The 100 bbl tank contains a hole at the top. As previous inspections have shown, the liner at both well and tank locations has been torn in several areas most of which are located at top of earthen dike. Mr. Jonathan Reese, a Field Supervisor with JD Drilling was contacted by telephone at 1:21 pm regarding the inspection results. Mr. Reese states that the 100 bbl does contain a hole and will be replaced. He agreed this would be an opportune time to re-construct this facility, while tank was removed to meet current requirements. A drawing will be submitted to Tom Tomastik for review. Mr. Reese was also informed about the injection side of this well not showing any pressure while pumping or observed vacuum. Mr. Reese agreed to evaluate and correct this area of the well.
1261925949 2008-09-11 Enhanced Recovery Project No Violations An inspection revealed no violations.
1269i11 2001-1-17 0:00: ER No Violations
1269i38509 2001-02-15 Enhanced Recovery Project No Violations Follow - up on NOV , In - Complaince .
1269i3850941 2001-2-15 0:00: ER No Violations
1312857263 2008-12-22 Enhanced Recovery Project No Violations An inspection revealed no violations. Note: Winter conditions at time of the inspection.
1315724025 2017-02-27 Salt Water Injection Well No Violations Inspected the containment dike, tank, injection pump, injection line, injection pressure and annulus pressure. Identification is posted on the tank. The containment dike is free of fluids.
1322483267 2011-11-18 Enhanced Recovery Project No Violations Accompanied Jon Scott on inspection.
135257816 2020-7-8 0:00:0 ER No Violations 2.50
1390794281 2019-4-29 0:00: ER No Violations 2.10
139166845 2020-3-5 0:00:0 ER No Violations 1.00
1403201701 2014-06-19 Enhanced Recovery Project No Violations Inspect containment dike, tank, injection line, injection pump, injection pressure and annulus pressure. Containment dike free of water. Identification posted on the 100 barrel steel tank. Injection pump was in operation during inspection.
1412259342 2014-10-02 Enhanced Recovery Project Violations Noted Inspected the containment dike, tank, injection pump, injection line, annulus pressure and injection pressure. The annulus and injection tubing were on vacuum. I called Jonathan Reese and told him to shut the well in today (10-2-14) and to schedule a mechanical integrity test.
1412270082 2014-10-02 Enhanced Recovery Project No Violations Mechanical Integrity Test. Added 2 gallons fresh water to annulus. Pressured annulus to 820 psi. Tested for 15 minutes with no loss.
1433871556 2015-06-09 Enhanced Recovery Project No Violations Compliance Notice # 189290021 Follow up inspection. Tested annulus at 840 psi for 15 minutes with a loss of 35 psi. The wellhead had a small leak that was observed during the test. A new 1/4 needle valve was installed on the injection tubing. Inspected the containment dike, tank, injection pump, injection line, injection pressure and annulus pressure.
1457700749 2016-03-10 Enhanced Recovery Project No Violations Compliance notice # 190111551 follow up inspection. The containment dike sump pump is operational. Containment dike had approximately 6 of fluid. Oil has been removed from the dike. I talked to the well tender onsite about the need to keep the containment dike free of fluids. He told me that they are working on adjustments to the pump so that it will remove more fluid.
1498602315 2008-01-08 Enhanced Recovery Project No Violations A follow-up inspection revealed non-compliance.
1560408343 2011-05-05 Enhanced Recovery Project No Violations Replacing dike liner with 30 mill liner. Also placing liner around injection well.
1569550209 2014-09-15 Enhanced Recovery Project No Violations Inspected containment dike, tank, injection pump, annulus pressure and injection pressure. Identification posted on tank. Access road has been improved with grading and gravel on the entrance.
1585994299 2016-07-29 Enhanced Recovery Project No Violations Inspected the containment dike, tank, injection pump, injection line, injection pressure, and annulus pressure. Identification posted on the tank. The containment dikes are free of fluids.
1625976338 2019-01-28 Enhanced Recovery Project No Violations Inspected the containment dike, tank, injection pump, injection line, injection pressure. Identification is posted on the tank. The containment dike has approximately 3 inches of ice.
1634206011 2015-03-12 Enhanced Recovery Project No Violations Compliance notice follow up. Tested the annulus at 330 psi for 15 minutes with no loss in pressure. Used filters have been removed from location. The oil and water in the containment dike has not been removed. The sump pump needs to be replaced.
1643539118 2016-03-09 Enhanced Recovery Project No Violations Compliance notice # 190111551 follow up inspection. A crew from JD Drilling was on site working on installing new electric lines to the containment dike sump pump. Containment dike had approximately 10 of fluid. Oil has been removed from the dike.
1649703930 2008-03-24 Enhanced Recovery Project No Violations A follow-up inspection revealed positive pressure has been placed on the annulus. The previously noted violation has been resolved.
1657548908 2005-09-07 Enhanced Recovery Project No Violations Follow-up on NOV, Non-Complaince, request company be placed on Permit Hold List.
166977460 2007-4-19 0:00: ER No Violations
1687711470 2009-10-09 Administrative Inspection No Violations Called Mr. Reese Johnson with JD Drilling today at 9:06 am regarding liner at well and positive pressure on annulus. In regards to pressure, he was informed that I would like to witness a monthly mini-test if they elect to leave pressure at zero. Mr. Johnson states that they will start on this next week.
1695290630 2003-10-30 Enhanced Recovery Project No Violations No violations.
1730612382 2013-07-29 Enhanced Recovery Project No Violations Inspected the containment dike, tank, injection pump, injection line, injection pressure, and annulus pressure. Identification is posted on the tank. The annulus needle valve needs to be replaced. The containment dike at the wellhead is half full of water. I contacted The pumper Tom and he is going to pump out the dike into the tank on Thursday 8-1-13.
1736802770 2019-04-29 Enhanced Recovery Project Violations Noted Our records indicate that the Division has not received the Enhanced Recovery Annual Report (Form 204) that was due on April 15th for 2018, Please submit the Form 204 to the Division by 5/29/2019.
174466989 2009-6-11 0:00: ER No Violations
1779018484 2016-10-12 Enhanced Recovery Project No Violations Inspected the containment dikes, tank, injection pump, injection line, injection pressure, and annulus pressure. Identification posted on the tank. The containment dikes are free of fluids.
1859197594 2019-7-25 0:00: ER No Violations 3.00
1877307834 2019-5-6 0:00:0 ER No Violations 4.30
1884535310 2012-08-30 Enhanced Recovery Project No Violations No violations were noted at the time of inspection.
1890774168 2016-02-24 Enhanced Recovery Project No Violations Compliance Notice # 190111551 follow up inspection. Containment dike has 10 of fluid in the dike. Absorbent pads are being used to remove the oil in the dike.
1918628717 2011-08-04 Enhanced Recovery Project No Violations FOLLOW UP TO NOV # 397003039 FOLLOW UP TO NOV # 1968072623 Annulus has zero pressure. I called Spence Carpenter and he is scheduling the test for next week.
1940613417 2004-01-15 Enhanced Recovery Project No Violations No violations.
1968072623 2011-08-04 Enhanced Recovery Project Violations Noted Annulus has zero pressure. I called Spence Carpenter and he is scheduling the test for next week.
1982937679 2016-12-07 Enhanced Recovery Project No Violations Inspected the containment dikes, tank, injection pump, injection line, injection pressure (zero psi) and annulus pressure (370 psi). Identification posted on the tank.
1995689757 2014-03-04 Enhanced Recovery Project No Violations Inspected the containment dike, tank, injection pump, injection pressure and annulus pressure. Identification is posted on the 100 barrel steel tank with in the containment dike.
2008999464 2014-05-21 Enhanced Recovery Project No Violations Inspected the containment dike, tank, injection pump, injection line, annulus pressure, and injection pressure. Good identification posted on tank.
2044468772 2013-01-25 Enhanced Recovery Project No Violations I accompanied Andy Thomas on the inspection of this well.
2049715836 2016-06-09 Enhanced Recovery Project No Violations Inspected the containment dikes, tank, injection pump, injection line, injection pressure, and annulus pressure. Identification posted on the tank. Tank containment dike has 6 of water in it.
2061096150 2011-04-11 Enhanced Recovery Project No Violations Liner is ripped worse than last inspection. 1/4 needle valve still needs replaced. I called Jonathan Reese and told him the liner ripped more during the last storm. He told me that they are scheduling the work, but the weather is hindering them. They are waiting for two dry days. Possibly end of week.
2063213100 2013-02-28 Enhanced Recovery Project Violations Noted Inspected containment dike, injection pressure and annulus pressure. Accompanied by Kip Thompson MRI 2. Annulus had zero pressure. Fluid was observed in the annulus at the surface. I called Jonathan Reese and a mini test was scheduled for 3-1-13.
2063720365 2011-01-04 Enhanced Recovery Project No Violations An inspection revealed no injection or annulus pressure. The pump was not running at time of inspection. Identification faded at tank, and housekeeping needed at the well. Oil was observed on surface of water inside the dike, due to placement of old filter at well location measuring approx 10 x 2. The company will be notified of inspection results.
2138242437 2015-03-11 Enhanced Recovery Project Violations Noted Inspected the containment dikes, tank, injection pump, injection line, injection pressure and annulus pressure. The injection pump containment has 7 inches of water in it with a thin skim of oil on top of the water. The annulus pressure was zero. The injection pump was in operation during the inspection. There were two used filters out side of the containment dike. I called Jonathan Reese and told him to dispose of the filters in an EPA approved landfill, pump out the containment dike into the tank. Clean up the oil in the dike. Pressure test the annulus. The annulus test is scheduled for 3-12-15.
2140942406 2008-01-17 Enhanced Recovery Project No Violations A follow-up inspection revealed non-compliance.
2145933323 2010-09-22 Enhanced Recovery Project No Violations An inspection revealed no violations. Note: The gauge utilized for this inspection will require calibration.
319345482 2006-9-20 0:00: ER No Violations
322086560 2003-6-30 0:00: ER No Violations
358716825 2013-9-9 0:00:0 ER No Violations 1.00
397003039 2011-8-4 0:00:0 ER No Violations
41710203 2017-5-15 0:00: ER No Violations
420177134 2013-3-1 0:00:0 ER No Violations
433452356 2004-3-4 0:00:0 ER No Violations
460479001 2011-11-18 0:00 ER No Violations
533391033 2008-5-27 0:00: ER No Violations
537808786 2006-10-12 0:00 ER No Violations
5609i206 2001-6-1 0:00:0 ER No Violations
607438420 2016-2-26 0:00: ER No Violations 2.00
624334270 2015-6-8 0:00:0 ER No Violations 3.00
653587334 2016-3-17 0:00: ER No Violations
658638965 2011-3-30 0:00: ER No Violations
7188920 2020-9-1 0:00:0 ER No Violations 2.50
819805016 2007-12-17 0:00 ER No Violations
824031274 2011-3-30 0:00: ER No Violations
857594848 2007-2-20 0:00: ER No Violations
891212815 2018-5-4 0:00:0 ER No Violations
iTOMK00010 2001-01-17 Enhanced Recovery Project Violations Noted
iTOMK000102 2001-1-17 0:00: ER No Violations
iTOMK000109 2001-1-17 0:00: ER No Violations
PL2330 PL No Violations

Violations Commited

Inspection ID Violation ID Violation Date Violation Code Violation Comments
0001269i11 US-OH-107244 2001-01-19 Pollution/Contamination
0001269i11 US-OH-107245 2001-01-19 Violation of safety distance reauirements
0001269i11 US-OH-107246 2001-01-19 Insufficient/No identification
0041710203 US-OH-124441 2017-07-10 9-5-10E Failure to file enhanced recovery annual report
0174466989 US-OH-117336 2009-07-01 Pollution/Contamination
0174466989 US-OH-117337 2009-07-01 Insufficient/No identification
0189290021 US-OH-119012 2015-06-10 Violation of injection tubing/fitting requirements
0189290021 US-OH-119013 2015-06-10 Failure to monitor annulus pressure
0190111551 US-OH-118903 2016-03-21 Pollution/Contamination
0291980358 US-OH-123034 2005-06-13 Insufficient/No identification
0291980358 US-OH-123035 2005-06-13 Failure to monitor annulus pressure
0291980358 US-OH-123036 2005-06-13 Pits not liquid tight/Improper construction or use
0319345482 US-OH-123304 2006-09-21 Failure to conduct or pass mech. integrity test
0319345482 US-OH-123305 2006-09-21 Failure to monitor annulus pressure
0319345482 US-OH-123306 2006-10-02 Insufficient/No identification
0373352770 US-OH-123940 2007-01-17 Failure to monitor annulus pressure
0392076185 US-OH-124163 2011-04-06 Violation of injection tubing/fitting requirements
0392076185 US-OH-124164 2011-04-06 Failure to monitor annulus pressure
0653587334 US-OH-127408 2017-07-13 9-5-10(E) Failure to monitor pressures or volumes/failure to file
0891212815 US-OH-130180 2018-08-03 Failure to file enhanced recovery annual report
0922983479 US-OH-130548 2007-11-06 Violation of injection tubing/fitting requirements
1178911361 US-OH-104763 2007-05-11 Failure to monitor annulus pressure
1412259342 US-OH-112136 2014-10-03 Mechanical failure/contamination
1736802770 US-OH-117247 2019-05-09 Failure to file enhanced recovery annual report
1968072623 US-OH-119884 2011-08-13 Failure to monitor annulus pressure
2063213100 US-OH-121028 2013-03-07 Failure to monitor annulus pressure
2138242437 US-OH-121942 2015-03-26 Pollution/Contamination
2138242437 US-OH-121943 2015-03-26 Failure to monitor annulus pressure
iTOMK00010 US-OH-131644 Pollution/Contamination
iTOMK00010 US-OH-131645 Violation of safety distance reauirements

For data sources see[5]

References