If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-163-20312 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.22,"lon":-82.3,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Vinton | |
Municipality: Knox Township | |
Operator Name: J D DRILLING COMPANY | |
Well Pad ID: | |
Farm/Lease Name: MCCATHREN VELMA {ERP #4} | |
License Status: Active Injection | |
License Date: 1982-09-15 | |
Spud Date: 1982-10-02 | |
Spud Drilling Contractor: SERVICE RIG | |
Final Drill Date: 1982-10-20 | |
Well Total Depth: 1313.00 ft | |
Configuration: Vertical | |
Latitude: 39.220000 | |
Longitude: -82.300000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
CO | 1982-09-15 | 116 J D DRILLING CO GeoDate 9/15/82 |
Enhanced Recovery | 1982-09-15 | Issued Date 9/15/82 Expired Date 3/15/83 Acres 0120000 Tool Type CT Proposed Formation BEREA Proposed Depth 01313 Proposed Drill Depth 01313 |
Original Spud | 1982-10-02 | ALSO DRILLED BY ROY GORDON DRILLING CONVERT 9-18-82 PRODUCTION FOUND IN NSR. |
Completed | 1982-10-20 | ALSO DRILLED BY ROY GORDON DRILLING CONVERT 9-18-82 PRODUCTION FOUND IN NSR. |
Reached Total Depth | 1982-10-20 | ALSO DRILLED BY ROY GORDON DRILLING CONVERT 9-18-82 PRODUCTION FOUND IN NSR. |
First Injection | 1982-10-21 | ALSO DRILLED BY ROY GORDON DRILLING CONVERT 9-18-82 PRODUCTION FOUND IN NSR. |
Completion Report Received | 1982-12-28 | ALSO DRILLED BY ROY GORDON DRILLING CONVERT 9-18-82 PRODUCTION FOUND IN NSR. |
Construction Permit Expires | 1983-03-15 | ALSO DRILLED BY ROY GORDON DRILLING CONVERT 9-18-82 PRODUCTION FOUND IN NSR. |
Annulus Pressure Monitoring Approved | 1987-05-29 | ALSO DRILLED BY ROY GORDON DRILLING CONVERT 9-18-82 PRODUCTION FOUND IN NSR. |
Last Compliance Report | 2000-04-13 | ALSO DRILLED BY ROY GORDON DRILLING CONVERT 9-18-82 PRODUCTION FOUND IN NSR. |
Record Last Modified | 2017-02-15 | ALSO DRILLED BY ROY GORDON DRILLING CONVERT 9-18-82 PRODUCTION FOUND IN NSR. |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2000-04-13 | 1303 | 1313 | 0 |
1303 | 1313 | 0 | |
1303 | 1313 | 0 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
NITR | 0 | 14 Qts | 0 |
For data sources see[4]
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1012389586 | 2003-3-25 0:00: | ER | No Violations | |
-1037348980 | 2019-12-19 0:00 | ER | No Violations | 1.80 |
-1041446285 | 2010-3-17 0:00: | ER | No Violations | |
-1236532552 | 2013-1-24 0:00: | ER | No Violations | 1.00 |
-1239644090 | 2011-1-18 0:00: | ER | No Violations | 1.00 |
-1261925949 | 2008-9-11 0:00: | ER | No Violations | |
-143428826 | 2009-3-3 0:00:0 | ER | No Violations | |
-1498602315 | 2008-1-8 0:00:0 | ER | No Violations | |
-1569550209 | 2014-9-15 0:00: | ER | No Violations | 0.70 |
-1585994299 | 2016-7-29 0:00: | ER | No Violations | 1.00 |
-161513594 | 2018-3-22 0:00: | SW | No Violations | 1.00 |
-1643539118 | 2016-3-9 0:00:0 | ER | No Violations | 1.50 |
-1649703930 | 2008-3-24 0:00: | ER | No Violations | |
-1657548908 | 2005-9-7 0:00:0 | ER | No Violations | |
-1687711470 | 2009-10-9 0:00: | AM | No Violations | |
-1730612382 | 2013-7-29 0:00: | ER | No Violations | 1.00 |
-1841085052 | 2020-4-14 0:00: | ER | No Violations | 1.00 |
-1884535310 | 2012-8-30 0:00: | ER | No Violations | 1.20 |
-189290021 | 2015-5-21 0:00: | ER | No Violations | 1.00 |
-190111551 | 2016-2-22 0:00: | ER | No Violations | 2.00 |
-1982937679 | 2016-12-7 0:00: | ER | No Violations | 2.80 |
-1995689757 | 2014-3-4 0:00:0 | ER | No Violations | 3.00 |
-2008999464 | 2014-5-21 0:00: | ER | No Violations | 1.50 |
-2049715836 | 2016-6-9 0:00:0 | ER | No Violations | 0.50 |
-2057163700 | 2019-11-6 0:00: | ER | No Violations | 1.00 |
-2061096150 | 2011-4-11 0:00: | ER | No Violations | |
-2063213100 | 2013-2-28 0:00: | ER | No Violations | 1.00 |
-2138242437 | 2015-3-11 0:00: | ER | No Violations | 2.00 |
-2140942406 | 2008-1-17 0:00: | ER | No Violations | |
-215323413 | 2017-7-18 0:00: | SW | No Violations | 0.20 |
-230200957 | 2007-7-3 0:00:0 | ER | No Violations | |
-267515736 | 2018-7-3 0:00:0 | ER | No Violations | 1.00 |
-291980358 | 2005-6-8 0:00:0 | SW | No Violations | |
-293295334 | 2013-8-5 0:00:0 | ER | No Violations | 1.00 |
-336896338 | 2010-7-8 0:00:0 | ER | No Violations | |
-345684535 | 2015-3-16 0:00: | ER | No Violations | 1.00 |
-373352770 | 2007-1-11 0:00: | ER | No Violations | |
-392076185 | 2011-3-30 0:00: | ER | No Violations | |
-392775226 | 2009-12-9 0:00: | ER | No Violations | |
-457544218 | 2013-5-21 0:00: | SW | No Violations | 1.00 |
-459776944 | 2013-5-21 0:00: | ER | No Violations | 2.50 |
-52499805 | 2009-9-1 0:00:0 | ER | No Violations | |
-551397954 | 2006-1-25 0:00: | ER | No Violations | |
-615516286 | 2012-6-14 0:00: | ER | No Violations | 1.00 |
-71797701 | 2015-8-10 0:00: | ER | No Violations | 0.70 |
-811122013 | 2003-4-21 0:00: | ER | No Violations | |
-825786322 | 2007-1-18 0:00: | ER | No Violations | |
-870234469 | 2005-1-12 0:00: | ER | No Violations | |
-88105518 | 2015-10-15 0:00 | ER | No Violations | 1.00 |
-907894614 | 2010-12-28 0:00 | ER | No Violations | 0.50 |
-922983479 | 2007-11-1 0:00: | ER | No Violations | |
-95719037 | 2017-4-10 0:00: | ER | No Violations | 1.00 |
0000PL2330 | Preliminary Restoration | No Violations | Preliminary Restoration done information from Data Point | |
0001269i11 | 2001-01-17 | Enhanced Recovery Project | Violations Noted | An inspection of the well revealed No ID at the well or tanks , electric line between well and tanks need hung in a safe manner , some brine soils in dike around tank needs removed . |
0041710203 | 2017-05-15 | Enhanced Recovery Project | Violations Noted | Our records indicate that the Division has not received the Enhanced Recovery Annual Report (Form 204) that was due on April 15th for 2016, despite a letter that was sent April 28, 2017 with a deadline of May 12, 2017 to submit the reports requested. please submit the requested Forms to the Division by 5/26/2017. REPORTS RECEIVED 7/3/2017 |
0052499805 | 2009-09-01 | Enhanced Recovery Project | No Violations | A follow-up inspection was conducted with Mr. Jeff Fry, West Region Oil & Gas Supervisor and UIC Field Supervisor. No injection or annulus pressure observed during the inspection. The pump is still leaking and tears in liner have not been addressed. |
005609i206 | 2001-06-01 | Enhanced Recovery Project | No Violations | No violations. |
0071797701 | 2015-08-10 | Enhanced Recovery Project | No Violations | Inspected the containment dike, tank, injection pump, injection line, injection pressure and annulus pressure. Assisted UIC section Geologist in measuring the containment dike. |
0088105518 | 2015-10-15 | Enhanced Recovery Project | No Violations | Inspected the containment dikes, tank, injection pump, injection line, injection pressure and annulus pressure. Dikes were free of fluids. |
0095719037 | 2017-04-10 | Enhanced Recovery Project | No Violations | Inspected the containment dikes, tank, injection pump, injection line, injection pressure and annulus pressure. Identification posted on the tank. The containment dikes are free of fluids. |
0143428826 | 2009-03-03 | Enhanced Recovery Project | No Violations | An inspection revealed no annulus pressure at this time. JD Drilling will be contacted regarding this inspection. |
0161513594 | 2018-03-22 | Salt Water Injection Well | No Violations | The salt water injection well had 24 psi on the annulus and 0 psi on the injection tubing. The dike was relativity free of fluids. Legible identification was posted. |
0166977460 | 2007-04-19 | Enhanced Recovery Project | No Violations | An inspection revealed that fitting will need replaced on annulus side of the well. |
0174466989 | 2009-06-11 | Enhanced Recovery Project | Violations Noted | An inspection revealed 1 to 4 of fluid inside the dike around the well head. High Range Quantabs revealed Cl- as test was stopped after 4.5 units. The pump at this location was leaking and found to contain a constant drip. Approximately ten 4-6 tears were observed in liner 2-3 from top of dike. The dike height is 5. The identification at the storage tank is missing ERP# and the permit number has faded. Correct identification at the storage tank by providing ERP# and permit number (faded). Repair/and or replace liner at well head location. Approximately (10) tears observed. The pump at this location was leaking. Fluid inside dike contains chloride. |
0189290021 | 2015-05-21 | Enhanced Recovery Project | Violations Noted | Inspected the containment dikes, tank, injection pump, injection line, and annulus pressure. The Injection tubing 1/4 needle valve would not open to allow a pressure reading with the state gauge. The annulus had a slight vacuum then went to zero pressure. I notified Jonathan Reese (JD Drilling field supervisor) that the 1/4 injection valve must be replaced and the annulus must be tested. We discussed the fact that they must monitor the annulus pressure. |
0190111551 | 2016-02-22 | Enhanced Recovery Project | Violations Noted | Inspected the containment dike, tank, injection pump, injection line, injection pressure and annulus pressure. Containment dike has 18 of oil and water in it. I contacted Jonathan Reese and he is sending someone to pump out the dike on 2-23-16. |
0215323413 | 2017-07-18 | Salt Water Injection Well | No Violations | Quarterly UIC inspection. The annulus pressure was 64 PSI, the injection tubing was 49 PSI. Legible identification was posted. No violations noted. |
0230200957 | 2007-07-03 | Enhanced Recovery Project | No Violations | A follow-up inspection revealed that the well is in-compliance. |
0267515736 | 2018-07-03 | Enhanced Recovery Project | No Violations | Inspected the containment dike, tank, injection pump, injection line, injection pressure and annulus pressure. Identification is posted on the tank. The containment dike is free of fluids. |
0291980358 | 2005-06-08 | Salt Water Injection Well | Violations Noted | An inspection of the well revealed ID needs rewrote at well and storage tank, need a new plastic liner around the well and under the water pump, repair leaking water pump. |
0293295334 | 2013-08-05 | Enhanced Recovery Project | No Violations | Dike is free of water. Needle valve on annulus has not been replaced. |
0319345482 | 2006-09-20 | Enhanced Recovery Project | Violations Noted | An inspection was conducted at the facility owned by JD Drilling., on 9/20/2006. During the inspection, it was noted that the identification located at the storage tank contained the wrong permit number, and the dike surrounding the well needs pumped. Also noted was that a mini test would be required. |
0322086560 | 2003-06-30 | Enhanced Recovery Project | No Violations | No violations |
0336896338 | 2010-07-08 | Enhanced Recovery Project | No Violations | An inspection revealed no violations at this time. The lease road has been graded since the last inspection. |
0345684535 | 2015-03-16 | Enhanced Recovery Project | No Violations | Compliance notice follow up. Oil has been removed from the containment dike. Inspected the containment dikes, tank, injection pump, injection line, injection pressure and annulus pressure. Identification posted on tank. |
0358716825 | 2013-09-09 | Enhanced Recovery Project | No Violations | Inspected the containment dike, tank, annulus pressure, and injection pressure. Good identification at the wellhead. Dike is free of water. |
0373352770 | 2007-01-11 | Enhanced Recovery Project | Violations Noted | On 1/11/2007, an inspection revealed that there was no pressure on the annulus side of the well. JD Drilling stated that valve to the well was closed and they were not injecting any fluid, The company stated that this deficiency would be corrected within a week. |
0392076185 | 2011-03-30 | Enhanced Recovery Project | Violations Noted | 1/4 needle valve on injection tubing not operational. Pump was running. I was unable to open needle valve to check pressure. Annulus had zero pressure. I called and talked to Jonathan Reese and he told me that he is planning on replacing the dike liner and working on the well as soon as the weather improves. I told him to schedule a annulus test with me and to replace the 1/4 valve on the injection tubing. |
0392775226 | 2009-12-09 | Enhanced Recovery Project | No Violations | A follow-up inspection revealed positive pressure on the annular side of well and the identification has been corrected. The previously noted tears in liner for the dike around the well (separate from tank) have not been repaired. The P&C has been resolved. |
0397003039 | 2011-08-04 | Enhanced Recovery Project | No Violations | FOLLOW UP TO NOV # 1968072623 Annulus has zero pressure. I called Spence Carpenter and he is scheduling the test for next week. |
0420177134 | 2013-03-01 | Enhanced Recovery Project | No Violations | Witnessed mini test on annulus (600 psi for 15 minutes with no loss in pressure.) |
0433452356 | 2004-03-04 | Enhanced Recovery Project | No Violations | No violations. |
0457544218 | 2013-05-21 | Salt Water Injection Well | No Violations | I accompanied Jon Scott on the inspection of this well. |
0459776944 | 2013-05-21 | Enhanced Recovery Project | No Violations | Inspected the injection pressure, annulus pressure, containment dike and tank. Accompanied by Kip Thompson MRI. |
0460479001 | 2011-11-18 | Enhanced Recovery Project | No Violations | ERP inspection. With Andy Thomas MRI. No violations observed during inspection. |
0533391033 | 2008-05-27 | Enhanced Recovery Project | No Violations | No violations were noted. |
0537808786 | 2006-10-12 | Enhanced Recovery Project | No Violations | A follow-up inspection conducted on 10/12/2006 revealed that the previously noted violations have been resolved. A mini-test was also performed. After 15 minutes the pressure only dropped from 148psi to 147psi. |
0551397954 | 2006-01-25 | Enhanced Recovery Project | No Violations | No violations, will need tested in spring. |
0607438420 | 2016-02-26 | Enhanced Recovery Project | No Violations | Compliance Notice 3 190111551 follow up inspection. Oil has been removed from the containment dike. Water level in dike is 6. Talked to Jonathan Reese and they are reworking the electric to the sump pump. |
0615516286 | 2012-06-14 | Enhanced Recovery Project | No Violations | Identification needs to be placed on well head and identification on tanks needs re-written. Spoke with Mr. Jonathon Reese about this. He stated he would put his guys right on it. |
0624334270 | 2015-06-08 | Enhanced Recovery Project | No Violations | Compliance Notice # 189290021 Follow up inspection. The 1/4 needle valve on the injection tubing has been replaced. The annulus has zero pressure. I called and talked to Tom Schoonover about the need to maintain the annulus pressure. Annulus test has been scheduled for 6-9-15. |
0653587334 | 2016-03-17 | Enhanced Recovery Project | Violations Noted | Our records indicate that the Division has not received the Enhanced Recovery Annual Report (Form 204) that was due on February 15th for 2015, despite a letter that was sent March 1, 2016 with a deadline of March 15, 2016 to submit the reports requested. Form 204 received 7/13/2017 |
0658638965 | 2011-03-30 | Enhanced Recovery Project | No Violations | FOLLOW UP TO NOV # -392076185 1/4 needle valve on injection tubing not operational. Pump was running. I was unable to open needle valve to check pressure. Annulus had zero pressure. I called and talked to Jonathan Reese and he told me that he is planning on replacing the dike liner and working on the well as soon as the weather improves. I told him to schedule a annulus test with me and to replace the 1/4 valve on the injection tubing. |
0811122013 | 2003-04-21 | Enhanced Recovery Project | No Violations | No violations at this time. |
0819805016 | 2007-12-17 | Enhanced Recovery Project | No Violations | A follow-up inspection revealed non-compliance. The annulus could not be tested, due to a stripped bolt. Vacuum was observed on the injection side of the well. |
0824031274 | 2011-03-30 | Enhanced Recovery Project | No Violations | FOLLOW UP TO NOV # 658638965 FOLLOW UP TO NOV # -392076185 1/4 needle valve on injection tubing not operational. Pump was running. I was unable to open needle valve to check pressure. Annulus had zero pressure. I called and talked to Jonathan Reese and he told me that he is planning on replacing the dike liner and working on the well as soon as the weather improves. I told him to schedule a annulus test with me and to replace the 1/4 valve on the injection tubing. |
0825786322 | 2007-01-18 | Enhanced Recovery Project | No Violations | On 1/18/2007, a inspection was conducted to check the status of annulus pressure. No pressure was observed. Mr. Spence Carpenter, JD Drilling, was contacted and informed of the results. Mr. Carpenter stated that a mini-test would be performed next week. He was also informed that this would be witnessed by the Division of Mineral Resources. |
0857594848 | 2007-02-20 | Enhanced Recovery Project | No Violations | On 2/20/2007, a mini-test was performed on the EOR well with a representative from JD Drilling, Mr. John Reese. This well passed the required test with only 4psi loss in fifteen minutes. Also noted was that a broken valve had released pressure therefore, leading to no pressure on the annulus side of the well. The previously noted violation has been resolved. |
0870234469 | 2005-01-12 | Enhanced Recovery Project | No Violations | No violations. |
0891212815 | 2018-05-04 | Enhanced Recovery Project | Violations Noted | Our records indicate that the Division has not received the 2017 Enhanced Recovery Well Annual Report (Form 204) that was due to the Division by April 15, 2018. Please submit the requested report by June 4, 2018. |
0907894614 | 2010-12-28 | Enhanced Recovery Project | No Violations | An inspection revealed pump running, but no observed pressure on injection side of well with gauge. Snow cover at time of inspection. Also noted, no pressure on the annulus. The inspection will be discussed with the company. |
0922983479 | 2007-11-01 | Enhanced Recovery Project | Violations Noted | An inspection revealed that the fittings on the annulus and injection side of the well will need replaced. Unable to test pressure with gauge. |
1012389586 | 2003-03-25 | Enhanced Recovery Project | No Violations | No violations at this time. |
1041446285 | 2010-03-17 | Enhanced Recovery Project | No Violations | An inspection revealed no violations at this time. At 1:50 pm, JD Drilling Co. was notified that annulus does not contain positive pressure. |
1065882941 | 2013-05-20 | Enhanced Recovery Project | No Violations | Inspected the injection pressure, annulus pressure, containment dike and tank. Brine pump has a steady leak, I called Tom well tender and told him that the pump was leaking (brine is contained in a containment dike. Tom said that he will fix the leak and pump out the dike. |
1082723542 | 2018-10-02 | Enhanced Recovery Project | No Violations | Inspected the containment dike, tank, injection pump, injection pressure and annulus pressure. Identification is posted. The containment dike has 6 inches of fresh water in it. I contacted Tom Schoonover and told him to pump out the containment dike. |
1086072014 | 2014-08-20 | Enhanced Recovery Project | No Violations | Inspected the containment dike, tank, injection pump, injection line, annulus pressure and injection pressure. Identification posted on tank. |
1116613111 | 2004-07-29 | Enhanced Recovery Project | No Violations | No violations. |
1123786888 | 2017-12-14 | Salt Water Injection Well | No Violations | My inspection revealed the salt water injection well had 95 psi on the annulus. The injection tubing was on vacuum. The dike was free of fluid. Legible identification was posted. |
1125766409 | 2018-05-08 | Enhanced Recovery Project | No Violations | Inspected the containment dike, tank, injection pump, injection line, injection pressure and annulus pressure. Identification is posted. The containment dike is free of fluids. |
1152882217 | 2006-07-12 | Enhanced Recovery Project | No Violations | On 7/12/2006, an inspection was conducted at the facility owned by JD Drilling Company. No violations were noted. |
1178911361 | 2007-04-26 | Enhanced Recovery Project | Violations Noted | An inspection revealed that fitting has been replaced however, pressure will need to be placed on the annulus. |
1236532552 | 2013-01-24 | Enhanced Recovery Project | No Violations | No violations were found at the well, tank battery or other facilities at this site. There was no fluid in any of the containment dikes. New identification has been posted the tank. Accompanied on inspection by Justin Smith. |
1239105664 | 2007-06-05 | Enhanced Recovery Project | No Violations | A follow-up inspection revealed non-compliance. |
1239644090 | 2011-01-18 | Enhanced Recovery Project | No Violations | An inspection revealed injection at time of inspection. Although the pump was running, no pressure could be obtained on injection side of well. An approximate 10 x 5 area inside the dike at 100 bbl tank location contained oil with applied saw dust. The 100 bbl tank contains a hole at the top. As previous inspections have shown, the liner at both well and tank locations has been torn in several areas most of which are located at top of earthen dike. Mr. Jonathan Reese, a Field Supervisor with JD Drilling was contacted by telephone at 1:21 pm regarding the inspection results. Mr. Reese states that the 100 bbl does contain a hole and will be replaced. He agreed this would be an opportune time to re-construct this facility, while tank was removed to meet current requirements. A drawing will be submitted to Tom Tomastik for review. Mr. Reese was also informed about the injection side of this well not showing any pressure while pumping or observed vacuum. Mr. Reese agreed to evaluate and correct this area of the well. |
1261925949 | 2008-09-11 | Enhanced Recovery Project | No Violations | An inspection revealed no violations. |
1269i11 | 2001-1-17 0:00: | ER | No Violations | |
1269i38509 | 2001-02-15 | Enhanced Recovery Project | No Violations | Follow - up on NOV , In - Complaince . |
1269i3850941 | 2001-2-15 0:00: | ER | No Violations | |
1312857263 | 2008-12-22 | Enhanced Recovery Project | No Violations | An inspection revealed no violations. Note: Winter conditions at time of the inspection. |
1315724025 | 2017-02-27 | Salt Water Injection Well | No Violations | Inspected the containment dike, tank, injection pump, injection line, injection pressure and annulus pressure. Identification is posted on the tank. The containment dike is free of fluids. |
1322483267 | 2011-11-18 | Enhanced Recovery Project | No Violations | Accompanied Jon Scott on inspection. |
135257816 | 2020-7-8 0:00:0 | ER | No Violations | 2.50 |
1390794281 | 2019-4-29 0:00: | ER | No Violations | 2.10 |
139166845 | 2020-3-5 0:00:0 | ER | No Violations | 1.00 |
1403201701 | 2014-06-19 | Enhanced Recovery Project | No Violations | Inspect containment dike, tank, injection line, injection pump, injection pressure and annulus pressure. Containment dike free of water. Identification posted on the 100 barrel steel tank. Injection pump was in operation during inspection. |
1412259342 | 2014-10-02 | Enhanced Recovery Project | Violations Noted | Inspected the containment dike, tank, injection pump, injection line, annulus pressure and injection pressure. The annulus and injection tubing were on vacuum. I called Jonathan Reese and told him to shut the well in today (10-2-14) and to schedule a mechanical integrity test. |
1412270082 | 2014-10-02 | Enhanced Recovery Project | No Violations | Mechanical Integrity Test. Added 2 gallons fresh water to annulus. Pressured annulus to 820 psi. Tested for 15 minutes with no loss. |
1433871556 | 2015-06-09 | Enhanced Recovery Project | No Violations | Compliance Notice # 189290021 Follow up inspection. Tested annulus at 840 psi for 15 minutes with a loss of 35 psi. The wellhead had a small leak that was observed during the test. A new 1/4 needle valve was installed on the injection tubing. Inspected the containment dike, tank, injection pump, injection line, injection pressure and annulus pressure. |
1457700749 | 2016-03-10 | Enhanced Recovery Project | No Violations | Compliance notice # 190111551 follow up inspection. The containment dike sump pump is operational. Containment dike had approximately 6 of fluid. Oil has been removed from the dike. I talked to the well tender onsite about the need to keep the containment dike free of fluids. He told me that they are working on adjustments to the pump so that it will remove more fluid. |
1498602315 | 2008-01-08 | Enhanced Recovery Project | No Violations | A follow-up inspection revealed non-compliance. |
1560408343 | 2011-05-05 | Enhanced Recovery Project | No Violations | Replacing dike liner with 30 mill liner. Also placing liner around injection well. |
1569550209 | 2014-09-15 | Enhanced Recovery Project | No Violations | Inspected containment dike, tank, injection pump, annulus pressure and injection pressure. Identification posted on tank. Access road has been improved with grading and gravel on the entrance. |
1585994299 | 2016-07-29 | Enhanced Recovery Project | No Violations | Inspected the containment dike, tank, injection pump, injection line, injection pressure, and annulus pressure. Identification posted on the tank. The containment dikes are free of fluids. |
1625976338 | 2019-01-28 | Enhanced Recovery Project | No Violations | Inspected the containment dike, tank, injection pump, injection line, injection pressure. Identification is posted on the tank. The containment dike has approximately 3 inches of ice. |
1634206011 | 2015-03-12 | Enhanced Recovery Project | No Violations | Compliance notice follow up. Tested the annulus at 330 psi for 15 minutes with no loss in pressure. Used filters have been removed from location. The oil and water in the containment dike has not been removed. The sump pump needs to be replaced. |
1643539118 | 2016-03-09 | Enhanced Recovery Project | No Violations | Compliance notice # 190111551 follow up inspection. A crew from JD Drilling was on site working on installing new electric lines to the containment dike sump pump. Containment dike had approximately 10 of fluid. Oil has been removed from the dike. |
1649703930 | 2008-03-24 | Enhanced Recovery Project | No Violations | A follow-up inspection revealed positive pressure has been placed on the annulus. The previously noted violation has been resolved. |
1657548908 | 2005-09-07 | Enhanced Recovery Project | No Violations | Follow-up on NOV, Non-Complaince, request company be placed on Permit Hold List. |
166977460 | 2007-4-19 0:00: | ER | No Violations | |
1687711470 | 2009-10-09 | Administrative Inspection | No Violations | Called Mr. Reese Johnson with JD Drilling today at 9:06 am regarding liner at well and positive pressure on annulus. In regards to pressure, he was informed that I would like to witness a monthly mini-test if they elect to leave pressure at zero. Mr. Johnson states that they will start on this next week. |
1695290630 | 2003-10-30 | Enhanced Recovery Project | No Violations | No violations. |
1730612382 | 2013-07-29 | Enhanced Recovery Project | No Violations | Inspected the containment dike, tank, injection pump, injection line, injection pressure, and annulus pressure. Identification is posted on the tank. The annulus needle valve needs to be replaced. The containment dike at the wellhead is half full of water. I contacted The pumper Tom and he is going to pump out the dike into the tank on Thursday 8-1-13. |
1736802770 | 2019-04-29 | Enhanced Recovery Project | Violations Noted | Our records indicate that the Division has not received the Enhanced Recovery Annual Report (Form 204) that was due on April 15th for 2018, Please submit the Form 204 to the Division by 5/29/2019. |
174466989 | 2009-6-11 0:00: | ER | No Violations | |
1779018484 | 2016-10-12 | Enhanced Recovery Project | No Violations | Inspected the containment dikes, tank, injection pump, injection line, injection pressure, and annulus pressure. Identification posted on the tank. The containment dikes are free of fluids. |
1859197594 | 2019-7-25 0:00: | ER | No Violations | 3.00 |
1877307834 | 2019-5-6 0:00:0 | ER | No Violations | 4.30 |
1884535310 | 2012-08-30 | Enhanced Recovery Project | No Violations | No violations were noted at the time of inspection. |
1890774168 | 2016-02-24 | Enhanced Recovery Project | No Violations | Compliance Notice # 190111551 follow up inspection. Containment dike has 10 of fluid in the dike. Absorbent pads are being used to remove the oil in the dike. |
1918628717 | 2011-08-04 | Enhanced Recovery Project | No Violations | FOLLOW UP TO NOV # 397003039 FOLLOW UP TO NOV # 1968072623 Annulus has zero pressure. I called Spence Carpenter and he is scheduling the test for next week. |
1940613417 | 2004-01-15 | Enhanced Recovery Project | No Violations | No violations. |
1968072623 | 2011-08-04 | Enhanced Recovery Project | Violations Noted | Annulus has zero pressure. I called Spence Carpenter and he is scheduling the test for next week. |
1982937679 | 2016-12-07 | Enhanced Recovery Project | No Violations | Inspected the containment dikes, tank, injection pump, injection line, injection pressure (zero psi) and annulus pressure (370 psi). Identification posted on the tank. |
1995689757 | 2014-03-04 | Enhanced Recovery Project | No Violations | Inspected the containment dike, tank, injection pump, injection pressure and annulus pressure. Identification is posted on the 100 barrel steel tank with in the containment dike. |
2008999464 | 2014-05-21 | Enhanced Recovery Project | No Violations | Inspected the containment dike, tank, injection pump, injection line, annulus pressure, and injection pressure. Good identification posted on tank. |
2044468772 | 2013-01-25 | Enhanced Recovery Project | No Violations | I accompanied Andy Thomas on the inspection of this well. |
2049715836 | 2016-06-09 | Enhanced Recovery Project | No Violations | Inspected the containment dikes, tank, injection pump, injection line, injection pressure, and annulus pressure. Identification posted on the tank. Tank containment dike has 6 of water in it. |
2061096150 | 2011-04-11 | Enhanced Recovery Project | No Violations | Liner is ripped worse than last inspection. 1/4 needle valve still needs replaced. I called Jonathan Reese and told him the liner ripped more during the last storm. He told me that they are scheduling the work, but the weather is hindering them. They are waiting for two dry days. Possibly end of week. |
2063213100 | 2013-02-28 | Enhanced Recovery Project | Violations Noted | Inspected containment dike, injection pressure and annulus pressure. Accompanied by Kip Thompson MRI 2. Annulus had zero pressure. Fluid was observed in the annulus at the surface. I called Jonathan Reese and a mini test was scheduled for 3-1-13. |
2063720365 | 2011-01-04 | Enhanced Recovery Project | No Violations | An inspection revealed no injection or annulus pressure. The pump was not running at time of inspection. Identification faded at tank, and housekeeping needed at the well. Oil was observed on surface of water inside the dike, due to placement of old filter at well location measuring approx 10 x 2. The company will be notified of inspection results. |
2138242437 | 2015-03-11 | Enhanced Recovery Project | Violations Noted | Inspected the containment dikes, tank, injection pump, injection line, injection pressure and annulus pressure. The injection pump containment has 7 inches of water in it with a thin skim of oil on top of the water. The annulus pressure was zero. The injection pump was in operation during the inspection. There were two used filters out side of the containment dike. I called Jonathan Reese and told him to dispose of the filters in an EPA approved landfill, pump out the containment dike into the tank. Clean up the oil in the dike. Pressure test the annulus. The annulus test is scheduled for 3-12-15. |
2140942406 | 2008-01-17 | Enhanced Recovery Project | No Violations | A follow-up inspection revealed non-compliance. |
2145933323 | 2010-09-22 | Enhanced Recovery Project | No Violations | An inspection revealed no violations. Note: The gauge utilized for this inspection will require calibration. |
319345482 | 2006-9-20 0:00: | ER | No Violations | |
322086560 | 2003-6-30 0:00: | ER | No Violations | |
358716825 | 2013-9-9 0:00:0 | ER | No Violations | 1.00 |
397003039 | 2011-8-4 0:00:0 | ER | No Violations | |
41710203 | 2017-5-15 0:00: | ER | No Violations | |
420177134 | 2013-3-1 0:00:0 | ER | No Violations | |
433452356 | 2004-3-4 0:00:0 | ER | No Violations | |
460479001 | 2011-11-18 0:00 | ER | No Violations | |
533391033 | 2008-5-27 0:00: | ER | No Violations | |
537808786 | 2006-10-12 0:00 | ER | No Violations | |
5609i206 | 2001-6-1 0:00:0 | ER | No Violations | |
607438420 | 2016-2-26 0:00: | ER | No Violations | 2.00 |
624334270 | 2015-6-8 0:00:0 | ER | No Violations | 3.00 |
653587334 | 2016-3-17 0:00: | ER | No Violations | |
658638965 | 2011-3-30 0:00: | ER | No Violations | |
7188920 | 2020-9-1 0:00:0 | ER | No Violations | 2.50 |
819805016 | 2007-12-17 0:00 | ER | No Violations | |
824031274 | 2011-3-30 0:00: | ER | No Violations | |
857594848 | 2007-2-20 0:00: | ER | No Violations | |
891212815 | 2018-5-4 0:00:0 | ER | No Violations | |
iTOMK00010 | 2001-01-17 | Enhanced Recovery Project | Violations Noted | |
iTOMK000102 | 2001-1-17 0:00: | ER | No Violations | |
iTOMK000109 | 2001-1-17 0:00: | ER | No Violations | |
PL2330 | PL | No Violations |
Inspection ID | Violation ID | Violation Date | Violation Code | Violation Comments |
---|---|---|---|---|
0001269i11 | US-OH-107244 | 2001-01-19 | Pollution/Contamination | |
0001269i11 | US-OH-107245 | 2001-01-19 | Violation of safety distance reauirements | |
0001269i11 | US-OH-107246 | 2001-01-19 | Insufficient/No identification | |
0041710203 | US-OH-124441 | 2017-07-10 | 9-5-10E | Failure to file enhanced recovery annual report |
0174466989 | US-OH-117336 | 2009-07-01 | Pollution/Contamination | |
0174466989 | US-OH-117337 | 2009-07-01 | Insufficient/No identification | |
0189290021 | US-OH-119012 | 2015-06-10 | Violation of injection tubing/fitting requirements | |
0189290021 | US-OH-119013 | 2015-06-10 | Failure to monitor annulus pressure | |
0190111551 | US-OH-118903 | 2016-03-21 | Pollution/Contamination | |
0291980358 | US-OH-123034 | 2005-06-13 | Insufficient/No identification | |
0291980358 | US-OH-123035 | 2005-06-13 | Failure to monitor annulus pressure | |
0291980358 | US-OH-123036 | 2005-06-13 | Pits not liquid tight/Improper construction or use | |
0319345482 | US-OH-123304 | 2006-09-21 | Failure to conduct or pass mech. integrity test | |
0319345482 | US-OH-123305 | 2006-09-21 | Failure to monitor annulus pressure | |
0319345482 | US-OH-123306 | 2006-10-02 | Insufficient/No identification | |
0373352770 | US-OH-123940 | 2007-01-17 | Failure to monitor annulus pressure | |
0392076185 | US-OH-124163 | 2011-04-06 | Violation of injection tubing/fitting requirements | |
0392076185 | US-OH-124164 | 2011-04-06 | Failure to monitor annulus pressure | |
0653587334 | US-OH-127408 | 2017-07-13 | 9-5-10(E) | Failure to monitor pressures or volumes/failure to file |
0891212815 | US-OH-130180 | 2018-08-03 | Failure to file enhanced recovery annual report | |
0922983479 | US-OH-130548 | 2007-11-06 | Violation of injection tubing/fitting requirements | |
1178911361 | US-OH-104763 | 2007-05-11 | Failure to monitor annulus pressure | |
1412259342 | US-OH-112136 | 2014-10-03 | Mechanical failure/contamination | |
1736802770 | US-OH-117247 | 2019-05-09 | Failure to file enhanced recovery annual report | |
1968072623 | US-OH-119884 | 2011-08-13 | Failure to monitor annulus pressure | |
2063213100 | US-OH-121028 | 2013-03-07 | Failure to monitor annulus pressure | |
2138242437 | US-OH-121942 | 2015-03-26 | Pollution/Contamination | |
2138242437 | US-OH-121943 | 2015-03-26 | Failure to monitor annulus pressure | |
iTOMK00010 | US-OH-131644 | Pollution/Contamination | ||
iTOMK00010 | US-OH-131645 | Violation of safety distance reauirements |
For data sources see[5]