If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-163-20776 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.21,"lon":-82.27,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Vinton | |
Municipality: Knox Township | |
Operator Name: BANCEQUITY PETROLEUM CORPORATI | |
Well Pad ID: | |
Farm/Lease Name: SABO | |
License Status: Active Injection | |
License Date: 1983-10-24 | |
Spud Date: 1982-10-17 | |
Spud Drilling Contractor: PLATEAU DRLG | |
Final Drill Date: 1982-10-20 | |
Well Total Depth: 1200.00 ft | |
Configuration: Vertical | |
Latitude: 39.210000 | |
Longitude: -82.270000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
Oil and Gas | 1982-09-14 | Issued Date 9/14/82 Expired Date Acres 0020000 Tool Type RTAF Proposed Formation CLINTON Proposed Depth Proposed Drill Depth |
Original Spud | 1982-10-17 | CONVERT 10-29-83 |
Completed | 1982-10-20 | CONVERT 10-29-83 |
Reached Total Depth | 1982-10-20 | CONVERT 10-29-83 |
CO | 1983-04-27 | 256 OHIO HYDROCARBONS INC GeoDate 9/14/82 |
First Injection | 1983-04-27 | CONVERT 10-29-83 |
Completion Report Received | 1983-07-25 | CONVERT 10-29-83 |
CO | 1983-10-24 | 631 BT ENERGY CORP GeoDate 10/24/83 |
Enhanced Recovery | 1983-10-24 | Issued Date 10/21/83 Expired Date 4/18/84 Acres 0020000 Tool Type NT Proposed Formation BEREA Proposed Depth 00000 Proposed Drill Depth 00000 |
Construction Permit Expires | 1984-04-18 | CONVERT 10-29-83 |
Annulus Pressure Monitoring Approved | 1991-06-05 | CONVERT 10-29-83 |
CO | 1996-04-09 | 4801 BANCEQUITY PETROLEUM CORP GeoDate 10/24/83 |
Last Compliance Report | 2016-12-27 | CONVERT 10-29-83 |
Record Last Modified | 2017-02-15 | CONVERT 10-29-83 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2000-04-14 | 1106 | 1124 | 1 |
2006-09-11 | 1107 | 1124 | 15 |
1106 | 1124 | 1 | |
1107 | 1124 | 15 | |
1106 | 1124 | 1 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 400 Bbl | 20000 | FRAC: 400 BBL H2O, 20M SAND |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
1993 | BT ENERGY CORP | 900.00 | 366.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
1993 | BT ENERGY CORP | Brine | 0 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1023908451 | 2012-6-14 0:00: | ER | No Violations | 1.00 |
-1236010911 | 2006-6-29 0:00: | ER | No Violations | |
-1237978983 | 2011-3-29 0:00: | ER | No Violations | |
-1420549773 | 2011-3-29 0:00: | ER | No Violations | |
-1428155132 | 2019-10-23 0:00 | ER | No Violations | 0.60 |
-1521312934 | 2019-11-6 0:00: | ER | No Violations | 1.00 |
-1534702396 | 2004-7-29 0:00: | ER | No Violations | |
-1562759820 | 2004-3-10 0:00: | ER | No Violations | |
-1600997031 | 2007-4-19 0:00: | ER | No Violations | |
-1633912012 | 2009-9-1 0:00:0 | ER | No Violations | |
-1687847580 | 2011-8-22 0:00: | ER | No Violations | |
-1688561324 | 2003-6-30 0:00: | ER | No Violations | |
-1689930578 | 2016-10-28 0:00 | ER | No Violations | 1.00 |
-1735803030 | 2011-1-4 0:00:0 | ER | No Violations | |
-1753669925 | 2013-3-28 0:00: | ER | No Violations | |
-1792450226 | 2006-7-26 0:00: | ER | No Violations | |
-197576635 | 2007-1-11 0:00: | ER | No Violations | |
-2073458382 | 2013-8-6 0:00:0 | SC | No Violations | 1.00 |
-2105863603 | 2004-1-15 0:00: | ER | No Violations | |
-2139091252 | 2017-5-30 0:00: | SW | No Violations | 1.00 |
-283221751 | 2013-2-12 0:00: | ER | No Violations | 2.00 |
-53299949168810 | 2005-4-20 0:00: | PW | No Violations | |
-598072690 | 2009-3-2 0:00:0 | ER | No Violations | |
-611952704 | 2013-8-26 0:00: | ER | No Violations | 1.00 |
-711617073 | 2008-2-11 0:00: | ER | No Violations | |
-736066798 | 2011-3-29 0:00: | ER | No Violations | |
-820478353 | 2016-3-9 0:00:0 | ER | No Violations | 2.50 |
-884953741 | 2009-6-15 0:00: | ER | No Violations | |
-897092827 | 2015-3-18 0:00: | AM | No Violations | |
-905665271 | 2011-12-13 0:00 | ER | No Violations | |
-933086034 | 2020-6-2 0:00:0 | ER | No Violations | 2.50 |
-956388394 | 2007-11-5 0:00: | ER | No Violations | |
-996209499 | 2019-2-28 0:00: | ER | No Violations | 2.00 |
0000UIC742 | 1989-08-01 | Enhanced Recovery Project | No Violations | 1501:9-5-06 prevent cont.& poll |
0000UIC743 | 1989-08-01 | Enhanced Recovery Project | No Violations | 1509.22 (A)(1)(2) storage & disposal |
0000UIC744 | 1989-08-01 | Enhanced Recovery Project | No Violations | 1501:9-5-09 (B)(7) const.& conversion |
0000UIC745 | 1989-08-01 | Enhanced Recovery Project | No Violations | 1509.072 restore distb.land |
0000UIC746 | 1989-08-01 | Enhanced Recovery Project | No Violations | 1501:9-5-05 (H) permit - well I.D |
000UIC1369 | 1992-12-09 | Enhanced Recovery Project | No Violations | 1501: 9-9-05 (A) (9) DIKE FREE OF FLUID |
000UIC1549 | 1994-12-13 | Enhanced Recovery Project | No Violations | 1501: 9-9-05 (A) (9) REMOVE FLUID IN DIKE |
001269i405 | 2001-10-02 | Enhanced Recovery Project | No Violations | |
0028852098 | 2006-11-03 | Enhanced Recovery Project | No Violations | A follow-up inspection conducted on 11/3/2006 revealed that the previously noted violation has not been resolved. The company was contacted by telephone on 11/3/2006 and informed to resolve this violation within a week. |
0035927601 | 2003-10-30 | Enhanced Recovery Project | No Violations | No violations. |
0053287939 | 2015-08-10 | Surface Facility Construction | No Violations | Accompanied UIC Geologist on inspection of the containment dike. |
005609i200 | 2001-05-31 | Enhanced Recovery Project | Violations Noted | An inspection of the well revealed that the fittings on the well head are leaking brine and contaminating the ground around . |
005609i239 | 2001-07-12 | Enhanced Recovery Project | No Violations | Follow - up on NOV , In - Compliance. |
0103765815 | 2005-06-02 | Enhanced Recovery Project | No Violations | Follow-up on NOV, Non-Compliance, pit liner not replaced, dike area does not meet SPCC requirements, pump still leaking brine. |
01269i1230 | 2002-07-23 | Enhanced Recovery Project | No Violations | Pressures on well meet requirements at this time, no violations at this time. |
0154572704 | 2002-11-21 | Enhanced Recovery Project | No Violations | No violations at this time, lease rd will need graded and water breaks in spring. |
0158147749 | 2008-12-22 | Enhanced Recovery Project | No Violations | No violations were noted. Note: Winter conditions at time of the inspection. |
0197576635 | 2007-01-11 | Enhanced Recovery Project | Violations Noted | An inspection conducted on 1/11/2007 revealed that the dike needs pumped and C&P removed from inside the dike. |
0244129028 | 2006-09-25 | Enhanced Recovery Project | No Violations | A follow-up inspection was conducted at the facility owned by Bancequity Petroleum Corp., on 9/25/2006. During the inspection, it was noted that the liner had been repaired however, the dike still needs to be pumped. |
0279345311 | 2007-11-05 | Enhanced Recovery Project | No Violations | No violations were noted. |
0283221751 | 2013-02-12 | Enhanced Recovery Project | No Violations | Upon arrival at the well head I noticed that the 2 in ball valve on the annulus was halfway open, and the 1/4 in valve was closed. After I checked the pressures I left the valves closed. The well is in compliance. I spoke with the pumper who monitors this well and told him that the valves should be left closed after monitoring pressures. |
0305324939 | 2007-08-10 | Enhanced Recovery Project | No Violations | No violations were noted. |
0513806674 | 2008-09-16 | Enhanced Recovery Project | No Violations | No violations were noted. |
0564440338 | 2005-01-26 | Enhanced Recovery Project | No Violations | No violations. |
0566439552 | 2013-03-28 | Enhanced Recovery Project | No Violations | Meet with Mike McPeak at the tank dike. We discussed the need to remove the oil from the dike and to remove the water from the dike. Mike placed absorbent pads on the oil. |
0598072690 | 2009-03-02 | Enhanced Recovery Project | No Violations | An inspection revealed no violations at this time. |
0611952704 | 2013-08-26 | Enhanced Recovery Project | No Violations | Inspected the unloading pad, containment dike, tanks, injection line, annulus pressure, and injection pressure. Containment dike is free of water. |
0665010897 | 2010-03-23 | Enhanced Recovery Project | No Violations | An inspection revealed no violations at this time. Note: EOR well takes water from Gardiner wells Permit Nos. 867, 908 and Zimmerman wells, Permit Nos. 759, 760, 781. |
0686987659 | 2013-07-17 | Surface Facility Construction | No Violations | Meet with Mike McPeak at the tank battery and review the unloading pad plan and measure the containment dike. |
0711617073 | 2008-02-11 | Enhanced Recovery Project | No Violations | No violations were noted. |
0736066798 | 2011-03-29 | Enhanced Recovery Project | No Violations | FOLLOW UP TO NOV # -1420549773 FOLLOW UP TO NOV # -1237978983 Good identification. Tank dike liner has two cuts in liner and two holes in liner. A scald / seep area 35 by 6 has formed bellow the dike. Pictures were taken of the liner and the seep. I called Tom Fischietto and told him the dike liner must be repaired or replaced. Seep was tested with High End Quantab read 5 on strip, 1601 ppm Cl. |
0820478353 | 2016-03-09 | Enhanced Recovery Project | No Violations | Inspected the unloading pad, containment dike, tanks, injection pump, injection line, injection pressure, and annulus pressure. Witnessed a Bancequity truck unloading on the pad. The truck pumped water out of the containment dike and into the tank. Identification posted at the well and facility. |
0869259392 | 2014-09-17 | Enhanced Recovery Project | No Violations | Repairs have been made to the injection line and valves have been replaced. Injection line was tested at 345 psi for 15 minutes with no loss. |
0884953741 | 2009-06-15 | Enhanced Recovery Project | No Violations | An inspection revealed no violations at this time. New identification displayed at the well. |
0897092827 | 2015-03-18 | Administrative Inspection | No Violations | Received a call from Mike McPeak that they have ordered a murphy switch for the injection pump. It is scheduled to be installed on 3-19-15. The injection pump has been shut off. |
0905665271 | 2011-12-13 | Enhanced Recovery Project | No Violations | Dike has multiple small holes in liner. Accompanied by Andy Thomas MRI. Andy called pumper and informed him of the repairs needed on the dike. We retuned to the dike later in the day and found repairs on going. Repairs were completed. |
0956388394 | 2007-11-05 | Enhanced Recovery Project | No Violations | No violations were noted. |
0964806857 | 2016-12-21 | Enhanced Recovery Project | No Violations | Mechanical Integrity Test. Tested the annulus at 345 psi, at 5 minutes 345 psi, at 15 minutes 345 psi. |
0970774203 | 2005-09-07 | Enhanced Recovery Project | No Violations | Follow-up on NOV, In-Compliance. |
0996209499 | 2019-02-28 | Enhanced Recovery Project | No Violations | Inspected the unloading pad, containment dike, tanks, injection pump, injection pressure and annulus pressure. The containment dike and tanks show signs of the tank overflowing. The oil has been cleaned up inside the dike. The brine is being removed now. The oil and brine was contained with in the dike. Mike McPeak was on site and told me that a float switch froze and allowed the tanks to overflow into the containment dike. |
1022257135 | 2017-07-14 | Salt Water Injection Well | No Violations | Quarterly UIC inspection. The annulus pressure was 610 PSI, the injection tubing was 48 PSI. Legible identification was posted. No violations noted. |
1023908451 | 2012-06-14 | Enhanced Recovery Project | No Violations | Identification is fading on the well head but is clear on the tank battery. Mr. Jess Hess was made aware of this. |
1033381006 | 2013-04-04 | Enhanced Recovery Project | No Violations | Oil in dike has been cleaned up. Violation resolved. |
103765815 | 2005-6-2 0:00:0 | ER | No Violations | |
1213620774 | 2008-05-28 | Enhanced Recovery Project | Violations Noted | An inspection revealed no pressure on the annulus side of the well. The company was contacted by telephone and states that this issue will be resolved within a week. |
1218387822 | 2008-06-30 | Enhanced Recovery Project | No Violations | A follow-up inspection revealed compliance. |
1236010911 | 2006-06-29 | Enhanced Recovery Project | No Violations | Lightning struck a 210 bbl storage tank, sometime the day before. The tank landed on US Rt. 50. Most of what spilled was contained inside the dike. The tank was recovered. Repairs were underway at the facility. |
1236405942 | 2010-06-30 | Enhanced Recovery Project | No Violations | An inspection revealed no violations. |
1237978983 | 2011-03-29 | Enhanced Recovery Project | Violations Noted | Good identification. Tank dike liner has two cuts in liner and two holes in liner. A scald / seep area 35 by 6 has formed bellow the dike. Pictures were taken of the liner and the seep. I called Tom Fischietto and told him the dike liner must be repaired or replaced. Seep was tested with High End Quantab read 5 on strip, 1601 ppm Cl. |
1269i1230 | 2002-7-23 0:00: | ER | No Violations | |
1269i405 | 2001-10-2 0:00: | ER | No Violations | |
1269i85057 | 2001-01-17 | Enhanced Recovery Project | No Violations | An inspection of the well revealed that a union on the flow line at the well is leaking brine and needs repaired or replaced. Also contaminated soils need cleaned up. Spoke to Mike the pumper and told him of the violations. |
1269i850577 | 2001-1-17 0:00: | ER | No Violations | |
1281485028 | 2007-06-26 | Enhanced Recovery Project | No Violations | No violations were noted. |
1285594297 | 2010-09-23 | Enhanced Recovery Project | No Violations | An inspection revealed no violations. Note: The gauge utilized for this inspection will require calibration. |
1328114967 | 2009-12-09 | Enhanced Recovery Project | No Violations | An inspection revealed no violations. |
1346432590 | 2012-08-31 | Enhanced Recovery Project | No Violations | No violations were noted at the time of inspection. |
1374648217 | 2006-06-22 | Enhanced Recovery Project | No Violations | There were no violations at the time of inspection. |
1376486764 | 2013-08-12 | Surface Facility Construction | No Violations | Unloading pad is constructed. The pad has a curb around the perimeter and is sloped to a sump pit. The sump pit is plumbed directly to the 210 barrel tank. A submersible pump is in the sump pit. Containment dike is free of water. |
1384879071 | 2013-11-19 | Salt Water Injection Well | No Violations | Status inspection, the enhanced recover well has a new concrete unloading pad. The dike has a small amount of water due to heavy rains. I have contacted Mike Mc peak with Bancequity to pump the water out of the dike. |
1384957953 | 2013-11-19 | Enhanced Recovery Project | No Violations | Inspected unloading pad, containment dike, tanks, Injection pump, Injection pressure, and annulus pressure. Good identification at the well. Accompanied by Inspector Kip Thompson. |
1396377566 | 2014-04-01 | Enhanced Recovery Project | No Violations | Inspected the containment dike, tanks, injection pump, unloading pad, injection pressure, and annulus pressure. Identification posted at the tank containment dike and wellhead. |
1403899244 | 2014-06-27 | Enhanced Recovery Project | Violations Noted | Inspected the unloading pad, containment dike, tanks, injection pump, annulus pressure, injection pressure, and witnessed Bancequity brine truck unloading on the pad. Walked the injection line from the containment dike to the well. At GPS N39.21908 W 082.27486 I noticed a wet area beside the injection line and fluid running down the rut in the access road. A high end Quantab was used to check the chlorides. The chlorides were over 6508 ppm Cl. I called Mike McPeak and told him of the leak. Mike sent a crew to shut off the injection pump and to drain the injection line. Repairs are on going. |
1405446606 | 2014-07-01 | Enhanced Recovery Project | No Violations | Injection line leak has been repaired. A new joint of 2 inch steel line was installed and the injection line was tested on 6-27-14 by Mike McPeak. |
1410888164 | 2014-09-16 | Enhanced Recovery Project | Violations Noted | Inspected containment dike, tanks, unloading pad, injection pump, injection line, annulus pressure and injection pressure. Identification is posted at well. Walked injection line. A 12 by 3 damp scald area was observed next to the 2 steel injection line. Close examination of that section of line revealed 2 pin holes that were seeping brine. I marked the location with orange marking tape and called Mike McPeak and told him about the problem. Mike dispatched a crew to the site. Repairs are ongoing. The maximum injection pressure is 320 psi. The injection tubing was 406 psi. The line has been shut off to make repairs. I talked to Mike about installing a pressure cut off switch to prevent exceeding the maximum injection pressure. |
1410898494 | 2014-09-16 | Enhanced Recovery Project | No Violations | Injection line has been repaired. Injection pressure was reduced. Injection line has air that needs to be removed before the line can be tested. Line test is scheduled for 9-17-14. |
1420549773 | 2011-03-29 | Enhanced Recovery Project | No Violations | FOLLOW UP TO NOV # -1237978983 Good identification. Tank dike liner has two cuts in liner and two holes in liner. A scald / seep area 35 by 6 has formed bellow the dike. Pictures were taken of the liner and the seep. I called Tom Fischietto and told him the dike liner must be repaired or replaced. Seep was tested with High End Quantab read 5 on strip, 1601 ppm Cl. |
1426701791 | 2015-03-18 | Enhanced Recovery Project | Violations Noted | Inspected the unloading pad, containment dike, tanks, injection pump, injection line, injection pressure and annulus pressure. The injection pressure was 360 psi on the state issued gauge. The maximum injection pressure is 320 psi. Reduce the injection pressure. |
1433966257 | 2015-06-10 | Enhanced Recovery Project | No Violations | Inspected the containment dike, tanks, unloading pad, injection pump, injection pressure and annulus pressure. |
1445366975 | 2015-10-20 | Enhanced Recovery Project | No Violations | Inspected the unloading pad, containment dike, tanks, injection pump, injection line, injection pressure and annulus pressure. Identification posted at the well and dike. |
1465563289 | 2016-06-09 | Enhanced Recovery Project | No Violations | Inspected the unloading pad, containment dike, tanks, injection pump, injection line, injection pressure and annulus pressure. Identification posted. Containment dike is free of fluids. One 3/4 hole in the liner was marked with orange tape. Mike McPeak was notified of the location of the hole in the liner. |
1472049459 | 2016-08-22 | Enhanced Recovery Project | No Violations | Inspected the unloading pad, containment dike, tanks, injection pump, injection pressure and annulus pressure. Identification posted. |
1472749874 | 2016-09-01 | Enhanced Recovery Project | No Violations | Inspected the containment dike, tanks, unloading pad, injection pump, injection line, injection pressure and annulus pressure. Identification posted. Containment dike is free of fluids. |
1529435425 | 2018-06-05 | Enhanced Recovery Project | No Violations | Inspected the unloading pad, containment dike, tanks, injection pump, injection pressure and annulus pressure. Witnessed a Bancequity brine truck unloading on the pad. Identification is posted at the well and facility. The containment dike is free of fluids. |
1534702396 | 2004-07-29 | Enhanced Recovery Project | No Violations | No violations |
1537196739 | 2018-09-11 | Enhanced Recovery Project | No Violations | Inspected the unloading pad, containment dike, tanks, injection pump, injection pressure and annulus pressure. Identification posted at the well and facility. Bancequity brine truck pumping out the containment pit during inspection. |
1540837975 | 2018-10-29 | Enhanced Recovery Project | No Violations | Inspected the unloading pad, containment dike, tanks, injection pump, injection pressure and annulus pressure. Identification posted. The containment dike has 4 inches of fluid in the low portion of the containment dike. |
154572704 | 2002-11-21 0:00 | ER | No Violations | |
1553402716 | 2014-06-27 | Enhanced Recovery Project | No Violations | FOLLOW UP TO NOV # 1403899244 Inspected the unloading pad, containment dike, tanks, injection pump, annulus pressure, injection pressure, and witnessed Bancequity brine truck unloading on the pad. Walked the injection line from the containment dike to the well. At GPS N39.21908 W 082.27486 I noticed a wet area beside the injection line and fluid running down the rut in the access road. A high end Quantab was used to check the chlorides. The chlorides were over 6508 ppm Cl. I called Mike McPeak and told him of the leak. Mike sent a crew to shut off the injection pump and to drain the injection line. Repairs are on going. |
1562759820 | 2004-03-10 | Enhanced Recovery Project | No Violations | No violations at this time |
1567187143 | 2019-8-26 0:00: | ER | No Violations | 2.00 |
158147749 | 2008-12-22 0:00 | ER | No Violations | |
1582849048 | 2018-03-19 | Salt Water Injection Well | No Violations | My inspection revealed the salt water injection well was on vacuum on the injection tubing and had 90 psi on the annulus. The well had a legible identification. |
1583753998 | 2020-3-4 0:00:0 | ER | No Violations | 3.50 |
1600997031 | 2007-04-19 | Enhanced Recovery Project | No Violations | An inspection revealed that previously noted violation has not been resolved. |
1633912012 | 2009-09-01 | Enhanced Recovery Project | No Violations | An inspection was conducted with Mr. Jeff Fry, West Region Oil & Gas Supervisor and UIC Field Supervisor. No violations were noted. |
1687847580 | 2011-08-22 | Enhanced Recovery Project | No Violations | No violations observed during inspection. |
1688561324 | 2003-06-30 | Enhanced Recovery Project | No Violations | No violations |
1689930578 | 2016-10-28 | Enhanced Recovery Project | No Violations | Inspected the unloading pad, containment dike, tanks, injection pump, injection line, injection pressure and annulus pressure. Identification posted. The containment dike is free of fluids. |
1735803030 | 2011-01-04 | Enhanced Recovery Project | No Violations | An inspection revealed injection and annulus pressures were 16/18 respectively. A courtesy notice was provided to the company to watch for pressure equalization. No violations were noted. |
1748670014 | 2006-11-13 | Enhanced Recovery Project | No Violations | A follow-up inspection on 11/13/2006 revealed that the previously noted violations have been resolved. |
1753669925 | 2013-03-28 | Enhanced Recovery Project | Violations Noted | Inspected injection pressure and annulus pressure. Tank dike has small amount oil at the base of the tank. Approximately 2 gallons oil. Lower level of the dike has approximately 8 water in it. I called Mike McPeak and he is going to meet with me later today. I told mike to remove the oil and to pump out the water and put it into the tank for injection. |
1791898742 | 2015-07-29 | Enhanced Recovery Project | No Violations | Inspected the surface facility, containment dike, tanks, injection pump, walked the injection line, injection pressure, and annulus pressure. |
1792450226 | 2006-07-26 | Enhanced Recovery Project | Violations Noted | An inspection was conducted at the facility owned by Bancequity Petroleum Corp., on 7/26/2006. During the inspection, it was noted that the dike needs to be pumped and liner repaired. |
1827155620 | 2011-12-13 | Enhanced Recovery Project | No Violations | Accompanied Jon Scott on UIC inspection. |
1876909324 | 2017-12-11 | Salt Water Injection Well | No Violations | My inspection revealed the well had 160 psi on the annulus and 4 psi on the injection tubing. The well has a legible identification posted. |
1966902367 | 2015-03-19 | Enhanced Recovery Project | No Violations | Company has installed a Murphy pressure cut off switch on the injection line. The cut off is set for 300 psi. |
2073458382 | 2013-08-06 | Surface Facility Construction | No Violations | New unloading pad has been formed up and is ready to pour concrete. |
2105863603 | 2004-01-15 | Enhanced Recovery Project | No Violations | No violations. |
2139091252 | 2017-05-30 | Salt Water Injection Well | No Violations | Salt water injection well inspection. The injection pressure was 12 PSI, the annulus pressure was 38 PSI. No violations noted. |
244129028 | 2006-9-25 0:00: | ER | No Violations | |
279345311 | 2007-11-5 0:00: | ER | No Violations | |
28852098 | 2006-11-3 0:00: | ER | No Violations | |
305324939 | 2007-8-10 0:00: | ER | No Violations | |
35927601 | 2003-10-30 0:00 | ER | No Violations | |
513806674 | 2008-9-16 0:00: | ER | No Violations | |
53287939 | 2015-8-10 0:00: | SC | No Violations | 0.50 |
5329994916 | 2005-04-20 | Production Wells | No Violations | An inspection of the tank pad revealed brine leaking from small dike below tank pad with 30 bbl tank, brine has killed an area approx 30 x30, C & P soils will need removed. Water pump leaking allowing brine to flow onto ground area, Liner in dike has several holes and does not meet requirements. Dike not large enough and does not meet SPCC requirements. Spoke to pumper about violations. |
5609i200 | 2001-5-31 0:00: | ER | No Violations | |
5609i239 | 2001-7-12 0:00: | ER | No Violations | |
564440338 | 2005-1-26 0:00: | ER | No Violations | |
566439552 | 2013-3-28 0:00: | ER | No Violations | 0.50 |
665010897 | 2010-3-23 0:00: | ER | No Violations | |
686987659 | 2013-7-17 0:00: | SC | No Violations | 4.00 |
869259392 | 2014-9-17 0:00: | ER | No Violations | 2.50 |
964806857 | 2016-12-21 0:00 | ER | No Violations | 1.00 |
970774203 | 2005-9-7 0:00:0 | ER | No Violations | |
990976635 | 2019-5-1 0:00:0 | ER | No Violations | 3.00 |
iTOMK00010 | 2001-01-17 | Enhanced Recovery Project | Violations Noted | |
iTOMK000105 | 2001-1-17 0:00: | ER | No Violations | |
iTOMK00013 | 2001-05-31 | Enhanced Recovery Project | No Violations | 1509.22(A); 1501:9-5-06; 1509.23; 1501:9-9-05 (A) (9) POLLUTION AND KEEP DIKE FREE OF FLUIDS |
iTOMK000138 | 2001-5-31 0:00: | ER | No Violations | |
UIC1369 | 1992-12-9 0:00: | ER | No Violations | |
UIC1549 | 1994-12-13 0:00 | ER | No Violations | |
UIC742 | 1989-8-1 0:00:0 | ER | No Violations | |
UIC743 | 1989-8-1 0:00:0 | ER | No Violations | |
UIC744 | 1989-8-1 0:00:0 | ER | No Violations | |
UIC745 | 1989-8-1 0:00:0 | ER | No Violations | |
UIC746 | 1989-8-1 0:00:0 | ER | No Violations |
Inspection ID | Violation ID | Violation Date | Violation Code | Violation Comments |
---|---|---|---|---|
005609i200 | US-OH-126226 | 2001-05-31 | Pollution/Contamination | |
005609i200 | US-OH-126227 | 2001-05-31 | No SPCC dike/or failure to keep dike free of water or oil | |
0197576635 | US-OH-119966 | 2007-01-22 | Contamination at storage facility (permit after 6/1/82) | |
1213620774 | US-OH-105603 | 2008-06-16 | Failure to monitor annulus pressure | |
1237978983 | US-OH-106346 | 2011-04-04 | Contamination at storage facility (permit after 6/1/82) | |
1403899244 | US-OH-111938 | 2014-07-18 | Pollution/Contamination | |
1410888164 | US-OH-112092 | 2014-09-22 | Pollution/Contamination | |
1410888164 | US-OH-112093 | 2014-09-22 | Exceeding maximum allowable injection pressure | |
1426701791 | US-OH-112427 | 2015-03-26 | Exceeding maximum allowable injection pressure | |
1753669925 | US-OH-117439 | 2013-04-05 | Contamination at storage facility (permit after 6/1/82) | |
1792450226 | US-OH-117882 | 2006-08-07 | No SPCC dike/or failure to keep dike free of water or oil | |
1792450226 | US-OH-117883 | 2006-08-04 | Contamination at storage facility (permit after 6/1/82) | |
iTOMK00010 | US-OH-131649 | Pollution/Contamination | ||
iTOMK00010 | US-OH-131650 | Violation of injection tubing/fitting requirements |
For data sources see[9]