Well Details

Well ID: 34-163-20776
Loading map...
Country: United States
State: Ohio
County: Vinton
Municipality: Knox Township
Operator Name: BANCEQUITY PETROLEUM CORPORATI
Well Pad ID:
Farm/Lease Name: SABO
License Status: Active Injection
License Date: 1983-10-24
Spud Date: 1982-10-17
Spud Drilling Contractor: PLATEAU DRLG
Final Drill Date: 1982-10-20
Well Total Depth: 1200.00 ft
Configuration: Vertical
Latitude: 39.210000
Longitude: -82.270000

For data sources see[1]

Well History

Well Status Well Status Date Comment
Oil and Gas 1982-09-14 Issued Date 9/14/82 Expired Date Acres 0020000 Tool Type RTAF Proposed Formation CLINTON Proposed Depth Proposed Drill Depth
Original Spud 1982-10-17 CONVERT 10-29-83
Completed 1982-10-20 CONVERT 10-29-83
Reached Total Depth 1982-10-20 CONVERT 10-29-83
CO 1983-04-27 256 OHIO HYDROCARBONS INC GeoDate 9/14/82
First Injection 1983-04-27 CONVERT 10-29-83
Completion Report Received 1983-07-25 CONVERT 10-29-83
CO 1983-10-24 631 BT ENERGY CORP GeoDate 10/24/83
Enhanced Recovery 1983-10-24 Issued Date 10/21/83 Expired Date 4/18/84 Acres 0020000 Tool Type NT Proposed Formation BEREA Proposed Depth 00000 Proposed Drill Depth 00000
Construction Permit Expires 1984-04-18 CONVERT 10-29-83
Annulus Pressure Monitoring Approved 1991-06-05 CONVERT 10-29-83
CO 1996-04-09 4801 BANCEQUITY PETROLEUM CORP GeoDate 10/24/83
Last Compliance Report 2016-12-27 CONVERT 10-29-83
Record Last Modified 2017-02-15 CONVERT 10-29-83

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2000-04-14 1106 1124 1
2006-09-11 1107 1124 15
1106 1124 1
1107 1124 15
1106 1124 1

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 0 400 Bbl 20000 FRAC: 400 BBL H2O, 20M SAND

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
1993 BT ENERGY CORP 900.00 366.00 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
1993 BT ENERGY CORP Brine 0 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1023908451 2012-6-14 0:00: ER No Violations 1.00
-1236010911 2006-6-29 0:00: ER No Violations
-1237978983 2011-3-29 0:00: ER No Violations
-1420549773 2011-3-29 0:00: ER No Violations
-1428155132 2019-10-23 0:00 ER No Violations 0.60
-1521312934 2019-11-6 0:00: ER No Violations 1.00
-1534702396 2004-7-29 0:00: ER No Violations
-1562759820 2004-3-10 0:00: ER No Violations
-1600997031 2007-4-19 0:00: ER No Violations
-1633912012 2009-9-1 0:00:0 ER No Violations
-1687847580 2011-8-22 0:00: ER No Violations
-1688561324 2003-6-30 0:00: ER No Violations
-1689930578 2016-10-28 0:00 ER No Violations 1.00
-1735803030 2011-1-4 0:00:0 ER No Violations
-1753669925 2013-3-28 0:00: ER No Violations
-1792450226 2006-7-26 0:00: ER No Violations
-197576635 2007-1-11 0:00: ER No Violations
-2073458382 2013-8-6 0:00:0 SC No Violations 1.00
-2105863603 2004-1-15 0:00: ER No Violations
-2139091252 2017-5-30 0:00: SW No Violations 1.00
-283221751 2013-2-12 0:00: ER No Violations 2.00
-53299949168810 2005-4-20 0:00: PW No Violations
-598072690 2009-3-2 0:00:0 ER No Violations
-611952704 2013-8-26 0:00: ER No Violations 1.00
-711617073 2008-2-11 0:00: ER No Violations
-736066798 2011-3-29 0:00: ER No Violations
-820478353 2016-3-9 0:00:0 ER No Violations 2.50
-884953741 2009-6-15 0:00: ER No Violations
-897092827 2015-3-18 0:00: AM No Violations
-905665271 2011-12-13 0:00 ER No Violations
-933086034 2020-6-2 0:00:0 ER No Violations 2.50
-956388394 2007-11-5 0:00: ER No Violations
-996209499 2019-2-28 0:00: ER No Violations 2.00
0000UIC742 1989-08-01 Enhanced Recovery Project No Violations 1501:9-5-06 prevent cont.& poll
0000UIC743 1989-08-01 Enhanced Recovery Project No Violations 1509.22 (A)(1)(2) storage & disposal
0000UIC744 1989-08-01 Enhanced Recovery Project No Violations 1501:9-5-09 (B)(7) const.& conversion
0000UIC745 1989-08-01 Enhanced Recovery Project No Violations 1509.072 restore distb.land
0000UIC746 1989-08-01 Enhanced Recovery Project No Violations 1501:9-5-05 (H) permit - well I.D
000UIC1369 1992-12-09 Enhanced Recovery Project No Violations 1501: 9-9-05 (A) (9) DIKE FREE OF FLUID
000UIC1549 1994-12-13 Enhanced Recovery Project No Violations 1501: 9-9-05 (A) (9) REMOVE FLUID IN DIKE
001269i405 2001-10-02 Enhanced Recovery Project No Violations
0028852098 2006-11-03 Enhanced Recovery Project No Violations A follow-up inspection conducted on 11/3/2006 revealed that the previously noted violation has not been resolved. The company was contacted by telephone on 11/3/2006 and informed to resolve this violation within a week.
0035927601 2003-10-30 Enhanced Recovery Project No Violations No violations.
0053287939 2015-08-10 Surface Facility Construction No Violations Accompanied UIC Geologist on inspection of the containment dike.
005609i200 2001-05-31 Enhanced Recovery Project Violations Noted An inspection of the well revealed that the fittings on the well head are leaking brine and contaminating the ground around .
005609i239 2001-07-12 Enhanced Recovery Project No Violations Follow - up on NOV , In - Compliance.
0103765815 2005-06-02 Enhanced Recovery Project No Violations Follow-up on NOV, Non-Compliance, pit liner not replaced, dike area does not meet SPCC requirements, pump still leaking brine.
01269i1230 2002-07-23 Enhanced Recovery Project No Violations Pressures on well meet requirements at this time, no violations at this time.
0154572704 2002-11-21 Enhanced Recovery Project No Violations No violations at this time, lease rd will need graded and water breaks in spring.
0158147749 2008-12-22 Enhanced Recovery Project No Violations No violations were noted. Note: Winter conditions at time of the inspection.
0197576635 2007-01-11 Enhanced Recovery Project Violations Noted An inspection conducted on 1/11/2007 revealed that the dike needs pumped and C&P removed from inside the dike.
0244129028 2006-09-25 Enhanced Recovery Project No Violations A follow-up inspection was conducted at the facility owned by Bancequity Petroleum Corp., on 9/25/2006. During the inspection, it was noted that the liner had been repaired however, the dike still needs to be pumped.
0279345311 2007-11-05 Enhanced Recovery Project No Violations No violations were noted.
0283221751 2013-02-12 Enhanced Recovery Project No Violations Upon arrival at the well head I noticed that the 2 in ball valve on the annulus was halfway open, and the 1/4 in valve was closed. After I checked the pressures I left the valves closed. The well is in compliance. I spoke with the pumper who monitors this well and told him that the valves should be left closed after monitoring pressures.
0305324939 2007-08-10 Enhanced Recovery Project No Violations No violations were noted.
0513806674 2008-09-16 Enhanced Recovery Project No Violations No violations were noted.
0564440338 2005-01-26 Enhanced Recovery Project No Violations No violations.
0566439552 2013-03-28 Enhanced Recovery Project No Violations Meet with Mike McPeak at the tank dike. We discussed the need to remove the oil from the dike and to remove the water from the dike. Mike placed absorbent pads on the oil.
0598072690 2009-03-02 Enhanced Recovery Project No Violations An inspection revealed no violations at this time.
0611952704 2013-08-26 Enhanced Recovery Project No Violations Inspected the unloading pad, containment dike, tanks, injection line, annulus pressure, and injection pressure. Containment dike is free of water.
0665010897 2010-03-23 Enhanced Recovery Project No Violations An inspection revealed no violations at this time. Note: EOR well takes water from Gardiner wells Permit Nos. 867, 908 and Zimmerman wells, Permit Nos. 759, 760, 781.
0686987659 2013-07-17 Surface Facility Construction No Violations Meet with Mike McPeak at the tank battery and review the unloading pad plan and measure the containment dike.
0711617073 2008-02-11 Enhanced Recovery Project No Violations No violations were noted.
0736066798 2011-03-29 Enhanced Recovery Project No Violations FOLLOW UP TO NOV # -1420549773 FOLLOW UP TO NOV # -1237978983 Good identification. Tank dike liner has two cuts in liner and two holes in liner. A scald / seep area 35 by 6 has formed bellow the dike. Pictures were taken of the liner and the seep. I called Tom Fischietto and told him the dike liner must be repaired or replaced. Seep was tested with High End Quantab read 5 on strip, 1601 ppm Cl.
0820478353 2016-03-09 Enhanced Recovery Project No Violations Inspected the unloading pad, containment dike, tanks, injection pump, injection line, injection pressure, and annulus pressure. Witnessed a Bancequity truck unloading on the pad. The truck pumped water out of the containment dike and into the tank. Identification posted at the well and facility.
0869259392 2014-09-17 Enhanced Recovery Project No Violations Repairs have been made to the injection line and valves have been replaced. Injection line was tested at 345 psi for 15 minutes with no loss.
0884953741 2009-06-15 Enhanced Recovery Project No Violations An inspection revealed no violations at this time. New identification displayed at the well.
0897092827 2015-03-18 Administrative Inspection No Violations Received a call from Mike McPeak that they have ordered a murphy switch for the injection pump. It is scheduled to be installed on 3-19-15. The injection pump has been shut off.
0905665271 2011-12-13 Enhanced Recovery Project No Violations Dike has multiple small holes in liner. Accompanied by Andy Thomas MRI. Andy called pumper and informed him of the repairs needed on the dike. We retuned to the dike later in the day and found repairs on going. Repairs were completed.
0956388394 2007-11-05 Enhanced Recovery Project No Violations No violations were noted.
0964806857 2016-12-21 Enhanced Recovery Project No Violations Mechanical Integrity Test. Tested the annulus at 345 psi, at 5 minutes 345 psi, at 15 minutes 345 psi.
0970774203 2005-09-07 Enhanced Recovery Project No Violations Follow-up on NOV, In-Compliance.
0996209499 2019-02-28 Enhanced Recovery Project No Violations Inspected the unloading pad, containment dike, tanks, injection pump, injection pressure and annulus pressure. The containment dike and tanks show signs of the tank overflowing. The oil has been cleaned up inside the dike. The brine is being removed now. The oil and brine was contained with in the dike. Mike McPeak was on site and told me that a float switch froze and allowed the tanks to overflow into the containment dike.
1022257135 2017-07-14 Salt Water Injection Well No Violations Quarterly UIC inspection. The annulus pressure was 610 PSI, the injection tubing was 48 PSI. Legible identification was posted. No violations noted.
1023908451 2012-06-14 Enhanced Recovery Project No Violations Identification is fading on the well head but is clear on the tank battery. Mr. Jess Hess was made aware of this.
1033381006 2013-04-04 Enhanced Recovery Project No Violations Oil in dike has been cleaned up. Violation resolved.
103765815 2005-6-2 0:00:0 ER No Violations
1213620774 2008-05-28 Enhanced Recovery Project Violations Noted An inspection revealed no pressure on the annulus side of the well. The company was contacted by telephone and states that this issue will be resolved within a week.
1218387822 2008-06-30 Enhanced Recovery Project No Violations A follow-up inspection revealed compliance.
1236010911 2006-06-29 Enhanced Recovery Project No Violations Lightning struck a 210 bbl storage tank, sometime the day before. The tank landed on US Rt. 50. Most of what spilled was contained inside the dike. The tank was recovered. Repairs were underway at the facility.
1236405942 2010-06-30 Enhanced Recovery Project No Violations An inspection revealed no violations.
1237978983 2011-03-29 Enhanced Recovery Project Violations Noted Good identification. Tank dike liner has two cuts in liner and two holes in liner. A scald / seep area 35 by 6 has formed bellow the dike. Pictures were taken of the liner and the seep. I called Tom Fischietto and told him the dike liner must be repaired or replaced. Seep was tested with High End Quantab read 5 on strip, 1601 ppm Cl.
1269i1230 2002-7-23 0:00: ER No Violations
1269i405 2001-10-2 0:00: ER No Violations
1269i85057 2001-01-17 Enhanced Recovery Project No Violations An inspection of the well revealed that a union on the flow line at the well is leaking brine and needs repaired or replaced. Also contaminated soils need cleaned up. Spoke to Mike the pumper and told him of the violations.
1269i850577 2001-1-17 0:00: ER No Violations
1281485028 2007-06-26 Enhanced Recovery Project No Violations No violations were noted.
1285594297 2010-09-23 Enhanced Recovery Project No Violations An inspection revealed no violations. Note: The gauge utilized for this inspection will require calibration.
1328114967 2009-12-09 Enhanced Recovery Project No Violations An inspection revealed no violations.
1346432590 2012-08-31 Enhanced Recovery Project No Violations No violations were noted at the time of inspection.
1374648217 2006-06-22 Enhanced Recovery Project No Violations There were no violations at the time of inspection.
1376486764 2013-08-12 Surface Facility Construction No Violations Unloading pad is constructed. The pad has a curb around the perimeter and is sloped to a sump pit. The sump pit is plumbed directly to the 210 barrel tank. A submersible pump is in the sump pit. Containment dike is free of water.
1384879071 2013-11-19 Salt Water Injection Well No Violations Status inspection, the enhanced recover well has a new concrete unloading pad. The dike has a small amount of water due to heavy rains. I have contacted Mike Mc peak with Bancequity to pump the water out of the dike.
1384957953 2013-11-19 Enhanced Recovery Project No Violations Inspected unloading pad, containment dike, tanks, Injection pump, Injection pressure, and annulus pressure. Good identification at the well. Accompanied by Inspector Kip Thompson.
1396377566 2014-04-01 Enhanced Recovery Project No Violations Inspected the containment dike, tanks, injection pump, unloading pad, injection pressure, and annulus pressure. Identification posted at the tank containment dike and wellhead.
1403899244 2014-06-27 Enhanced Recovery Project Violations Noted Inspected the unloading pad, containment dike, tanks, injection pump, annulus pressure, injection pressure, and witnessed Bancequity brine truck unloading on the pad. Walked the injection line from the containment dike to the well. At GPS N39.21908 W 082.27486 I noticed a wet area beside the injection line and fluid running down the rut in the access road. A high end Quantab was used to check the chlorides. The chlorides were over 6508 ppm Cl. I called Mike McPeak and told him of the leak. Mike sent a crew to shut off the injection pump and to drain the injection line. Repairs are on going.
1405446606 2014-07-01 Enhanced Recovery Project No Violations Injection line leak has been repaired. A new joint of 2 inch steel line was installed and the injection line was tested on 6-27-14 by Mike McPeak.
1410888164 2014-09-16 Enhanced Recovery Project Violations Noted Inspected containment dike, tanks, unloading pad, injection pump, injection line, annulus pressure and injection pressure. Identification is posted at well. Walked injection line. A 12 by 3 damp scald area was observed next to the 2 steel injection line. Close examination of that section of line revealed 2 pin holes that were seeping brine. I marked the location with orange marking tape and called Mike McPeak and told him about the problem. Mike dispatched a crew to the site. Repairs are ongoing. The maximum injection pressure is 320 psi. The injection tubing was 406 psi. The line has been shut off to make repairs. I talked to Mike about installing a pressure cut off switch to prevent exceeding the maximum injection pressure.
1410898494 2014-09-16 Enhanced Recovery Project No Violations Injection line has been repaired. Injection pressure was reduced. Injection line has air that needs to be removed before the line can be tested. Line test is scheduled for 9-17-14.
1420549773 2011-03-29 Enhanced Recovery Project No Violations FOLLOW UP TO NOV # -1237978983 Good identification. Tank dike liner has two cuts in liner and two holes in liner. A scald / seep area 35 by 6 has formed bellow the dike. Pictures were taken of the liner and the seep. I called Tom Fischietto and told him the dike liner must be repaired or replaced. Seep was tested with High End Quantab read 5 on strip, 1601 ppm Cl.
1426701791 2015-03-18 Enhanced Recovery Project Violations Noted Inspected the unloading pad, containment dike, tanks, injection pump, injection line, injection pressure and annulus pressure. The injection pressure was 360 psi on the state issued gauge. The maximum injection pressure is 320 psi. Reduce the injection pressure.
1433966257 2015-06-10 Enhanced Recovery Project No Violations Inspected the containment dike, tanks, unloading pad, injection pump, injection pressure and annulus pressure.
1445366975 2015-10-20 Enhanced Recovery Project No Violations Inspected the unloading pad, containment dike, tanks, injection pump, injection line, injection pressure and annulus pressure. Identification posted at the well and dike.
1465563289 2016-06-09 Enhanced Recovery Project No Violations Inspected the unloading pad, containment dike, tanks, injection pump, injection line, injection pressure and annulus pressure. Identification posted. Containment dike is free of fluids. One 3/4 hole in the liner was marked with orange tape. Mike McPeak was notified of the location of the hole in the liner.
1472049459 2016-08-22 Enhanced Recovery Project No Violations Inspected the unloading pad, containment dike, tanks, injection pump, injection pressure and annulus pressure. Identification posted.
1472749874 2016-09-01 Enhanced Recovery Project No Violations Inspected the containment dike, tanks, unloading pad, injection pump, injection line, injection pressure and annulus pressure. Identification posted. Containment dike is free of fluids.
1529435425 2018-06-05 Enhanced Recovery Project No Violations Inspected the unloading pad, containment dike, tanks, injection pump, injection pressure and annulus pressure. Witnessed a Bancequity brine truck unloading on the pad. Identification is posted at the well and facility. The containment dike is free of fluids.
1534702396 2004-07-29 Enhanced Recovery Project No Violations No violations
1537196739 2018-09-11 Enhanced Recovery Project No Violations Inspected the unloading pad, containment dike, tanks, injection pump, injection pressure and annulus pressure. Identification posted at the well and facility. Bancequity brine truck pumping out the containment pit during inspection.
1540837975 2018-10-29 Enhanced Recovery Project No Violations Inspected the unloading pad, containment dike, tanks, injection pump, injection pressure and annulus pressure. Identification posted. The containment dike has 4 inches of fluid in the low portion of the containment dike.
154572704 2002-11-21 0:00 ER No Violations
1553402716 2014-06-27 Enhanced Recovery Project No Violations FOLLOW UP TO NOV # 1403899244 Inspected the unloading pad, containment dike, tanks, injection pump, annulus pressure, injection pressure, and witnessed Bancequity brine truck unloading on the pad. Walked the injection line from the containment dike to the well. At GPS N39.21908 W 082.27486 I noticed a wet area beside the injection line and fluid running down the rut in the access road. A high end Quantab was used to check the chlorides. The chlorides were over 6508 ppm Cl. I called Mike McPeak and told him of the leak. Mike sent a crew to shut off the injection pump and to drain the injection line. Repairs are on going.
1562759820 2004-03-10 Enhanced Recovery Project No Violations No violations at this time
1567187143 2019-8-26 0:00: ER No Violations 2.00
158147749 2008-12-22 0:00 ER No Violations
1582849048 2018-03-19 Salt Water Injection Well No Violations My inspection revealed the salt water injection well was on vacuum on the injection tubing and had 90 psi on the annulus. The well had a legible identification.
1583753998 2020-3-4 0:00:0 ER No Violations 3.50
1600997031 2007-04-19 Enhanced Recovery Project No Violations An inspection revealed that previously noted violation has not been resolved.
1633912012 2009-09-01 Enhanced Recovery Project No Violations An inspection was conducted with Mr. Jeff Fry, West Region Oil & Gas Supervisor and UIC Field Supervisor. No violations were noted.
1687847580 2011-08-22 Enhanced Recovery Project No Violations No violations observed during inspection.
1688561324 2003-06-30 Enhanced Recovery Project No Violations No violations
1689930578 2016-10-28 Enhanced Recovery Project No Violations Inspected the unloading pad, containment dike, tanks, injection pump, injection line, injection pressure and annulus pressure. Identification posted. The containment dike is free of fluids.
1735803030 2011-01-04 Enhanced Recovery Project No Violations An inspection revealed injection and annulus pressures were 16/18 respectively. A courtesy notice was provided to the company to watch for pressure equalization. No violations were noted.
1748670014 2006-11-13 Enhanced Recovery Project No Violations A follow-up inspection on 11/13/2006 revealed that the previously noted violations have been resolved.
1753669925 2013-03-28 Enhanced Recovery Project Violations Noted Inspected injection pressure and annulus pressure. Tank dike has small amount oil at the base of the tank. Approximately 2 gallons oil. Lower level of the dike has approximately 8 water in it. I called Mike McPeak and he is going to meet with me later today. I told mike to remove the oil and to pump out the water and put it into the tank for injection.
1791898742 2015-07-29 Enhanced Recovery Project No Violations Inspected the surface facility, containment dike, tanks, injection pump, walked the injection line, injection pressure, and annulus pressure.
1792450226 2006-07-26 Enhanced Recovery Project Violations Noted An inspection was conducted at the facility owned by Bancequity Petroleum Corp., on 7/26/2006. During the inspection, it was noted that the dike needs to be pumped and liner repaired.
1827155620 2011-12-13 Enhanced Recovery Project No Violations Accompanied Jon Scott on UIC inspection.
1876909324 2017-12-11 Salt Water Injection Well No Violations My inspection revealed the well had 160 psi on the annulus and 4 psi on the injection tubing. The well has a legible identification posted.
1966902367 2015-03-19 Enhanced Recovery Project No Violations Company has installed a Murphy pressure cut off switch on the injection line. The cut off is set for 300 psi.
2073458382 2013-08-06 Surface Facility Construction No Violations New unloading pad has been formed up and is ready to pour concrete.
2105863603 2004-01-15 Enhanced Recovery Project No Violations No violations.
2139091252 2017-05-30 Salt Water Injection Well No Violations Salt water injection well inspection. The injection pressure was 12 PSI, the annulus pressure was 38 PSI. No violations noted.
244129028 2006-9-25 0:00: ER No Violations
279345311 2007-11-5 0:00: ER No Violations
28852098 2006-11-3 0:00: ER No Violations
305324939 2007-8-10 0:00: ER No Violations
35927601 2003-10-30 0:00 ER No Violations
513806674 2008-9-16 0:00: ER No Violations
53287939 2015-8-10 0:00: SC No Violations 0.50
5329994916 2005-04-20 Production Wells No Violations An inspection of the tank pad revealed brine leaking from small dike below tank pad with 30 bbl tank, brine has killed an area approx 30 x30, C & P soils will need removed. Water pump leaking allowing brine to flow onto ground area, Liner in dike has several holes and does not meet requirements. Dike not large enough and does not meet SPCC requirements. Spoke to pumper about violations.
5609i200 2001-5-31 0:00: ER No Violations
5609i239 2001-7-12 0:00: ER No Violations
564440338 2005-1-26 0:00: ER No Violations
566439552 2013-3-28 0:00: ER No Violations 0.50
665010897 2010-3-23 0:00: ER No Violations
686987659 2013-7-17 0:00: SC No Violations 4.00
869259392 2014-9-17 0:00: ER No Violations 2.50
964806857 2016-12-21 0:00 ER No Violations 1.00
970774203 2005-9-7 0:00:0 ER No Violations
990976635 2019-5-1 0:00:0 ER No Violations 3.00
iTOMK00010 2001-01-17 Enhanced Recovery Project Violations Noted
iTOMK000105 2001-1-17 0:00: ER No Violations
iTOMK00013 2001-05-31 Enhanced Recovery Project No Violations 1509.22(A); 1501:9-5-06; 1509.23; 1501:9-9-05 (A) (9) POLLUTION AND KEEP DIKE FREE OF FLUIDS
iTOMK000138 2001-5-31 0:00: ER No Violations
UIC1369 1992-12-9 0:00: ER No Violations
UIC1549 1994-12-13 0:00 ER No Violations
UIC742 1989-8-1 0:00:0 ER No Violations
UIC743 1989-8-1 0:00:0 ER No Violations
UIC744 1989-8-1 0:00:0 ER No Violations
UIC745 1989-8-1 0:00:0 ER No Violations
UIC746 1989-8-1 0:00:0 ER No Violations

Violations Commited

Inspection ID Violation ID Violation Date Violation Code Violation Comments
005609i200 US-OH-126226 2001-05-31 Pollution/Contamination
005609i200 US-OH-126227 2001-05-31 No SPCC dike/or failure to keep dike free of water or oil
0197576635 US-OH-119966 2007-01-22 Contamination at storage facility (permit after 6/1/82)
1213620774 US-OH-105603 2008-06-16 Failure to monitor annulus pressure
1237978983 US-OH-106346 2011-04-04 Contamination at storage facility (permit after 6/1/82)
1403899244 US-OH-111938 2014-07-18 Pollution/Contamination
1410888164 US-OH-112092 2014-09-22 Pollution/Contamination
1410888164 US-OH-112093 2014-09-22 Exceeding maximum allowable injection pressure
1426701791 US-OH-112427 2015-03-26 Exceeding maximum allowable injection pressure
1753669925 US-OH-117439 2013-04-05 Contamination at storage facility (permit after 6/1/82)
1792450226 US-OH-117882 2006-08-07 No SPCC dike/or failure to keep dike free of water or oil
1792450226 US-OH-117883 2006-08-04 Contamination at storage facility (permit after 6/1/82)
iTOMK00010 US-OH-131649 Pollution/Contamination
iTOMK00010 US-OH-131650 Violation of injection tubing/fitting requirements

For data sources see[9]

References