X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-163-20843

Well Details

Well ID: 34-163-20843
Loading map...
Country: United States
State: Ohio
County: Vinton
Municipality: Knox Township
Operator Name: BANCEQUITY PETROLEUM CORPORATI
Well Pad ID:
Farm/Lease Name: STANEART K
License Status: Active Injection
License Date: 1985-01-04
Spud Date: 1984-08-20
Spud Drilling Contractor: R WOLFE DRLG
Final Drill Date: 1984-08-21
Well Total Depth: 1110.00 ft
Configuration: Vertical
Latitude: 39.220000
Longitude: -82.290000

For data sources see[1]

Well History

Well Status Well Status Date Comment
Oil and Gas 1984-07-27 Issued Date 7/27/84 Expired Date 1/23/85 Acres 0020000 Tool Type RTAF Proposed Formation BEREA Proposed Depth 01110 Proposed Drill Depth 01110
Reached Total Depth 1984-08-21 VARIANCE GRANTED TO ALLOW TUBING/PACKER TO BE SET 136 FEET ABOVE TOP PERFORATION IN INJECTION ZONE. CHG FTG 11-8-86, RL / CONVERT / CHG ACRE.
CO 1984-11-01 1957 TAG PETROLEUM SERVS INC GeoDate 7/27/84
First Injection 1984-11-01 VARIANCE GRANTED TO ALLOW TUBING/PACKER TO BE SET 136 FEET ABOVE TOP PERFORATION IN INJECTION ZONE. CHG FTG 11-8-86, RL / CONVERT / CHG ACRE.
CO 1985-01-04 2007 HEINRICH ENTERPRISES INC GeoDate 1/4/85
Enhanced Recovery 1985-01-04 Issued Date 1/4/85 Expired Date 7/3/85 Acres 0010000 Tool Type RTAF Proposed Formation BEREA Proposed Depth 00000 Proposed Drill Depth 00000
Annulus Pressure Monitoring Approved 1985-03-07 VARIANCE GRANTED TO ALLOW TUBING/PACKER TO BE SET 136 FEET ABOVE TOP PERFORATION IN INJECTION ZONE. CHG FTG 11-8-86, RL / CONVERT / CHG ACRE.
Completed 1985-03-07 VARIANCE GRANTED TO ALLOW TUBING/PACKER TO BE SET 136 FEET ABOVE TOP PERFORATION IN INJECTION ZONE. CHG FTG 11-8-86, RL / CONVERT / CHG ACRE.
Original Spud 1985-03-07 VARIANCE GRANTED TO ALLOW TUBING/PACKER TO BE SET 136 FEET ABOVE TOP PERFORATION IN INJECTION ZONE. CHG FTG 11-8-86, RL / CONVERT / CHG ACRE.
Completion Report Received 1985-05-24 VARIANCE GRANTED TO ALLOW TUBING/PACKER TO BE SET 136 FEET ABOVE TOP PERFORATION IN INJECTION ZONE. CHG FTG 11-8-86, RL / CONVERT / CHG ACRE.
Construction Permit Expires 1985-07-03 VARIANCE GRANTED TO ALLOW TUBING/PACKER TO BE SET 136 FEET ABOVE TOP PERFORATION IN INJECTION ZONE. CHG FTG 11-8-86, RL / CONVERT / CHG ACRE.
Change of Owner 2003-03-18 Operator changed from 2007, HEINRICH ENTERPRISES INC to 4801, BANCEQUITY PETROLEUM CORP
Last Compliance Report 2006-10-30 VARIANCE GRANTED TO ALLOW TUBING/PACKER TO BE SET 136 FEET ABOVE TOP PERFORATION IN INJECTION ZONE. CHG FTG 11-8-86, RL / CONVERT / CHG ACRE.
Record Last Modified 2017-02-15 VARIANCE GRANTED TO ALLOW TUBING/PACKER TO BE SET 136 FEET ABOVE TOP PERFORATION IN INJECTION ZONE. CHG FTG 11-8-86, RL / CONVERT / CHG ACRE.

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2002-11-07 1060 1072 1
2006-09-11 1070 1082 13
1060 1072 1
1070 1082 13
1060 1072 1

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 0 0 0 GEL FRAC WITH 600 BBLS OF H2O AND 10,000# OF 20/40 SAND

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
1993 HEINRICH ENTERPRISES INC DBA W 0.00 0.00 365
1995 HEINRICH ENTERPRISES INC DBA W 0.00 0.00 365
1996 HEINRICH ENTERPRISES INC DBA W 0.00 0.00 365
1997 HEINRICH ENTERPRISES INC DBA W 0.00 0.00 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
1993 HEINRICH ENTERPRISES INC DBA W Brine 0 365
1995 HEINRICH ENTERPRISES INC DBA W Brine 0 365
1996 HEINRICH ENTERPRISES INC DBA W Brine 0 365
1997 HEINRICH ENTERPRISES INC DBA W Brine 0 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1006128186 2017-2-27 0:00: ER No Violations 0.50
-1020211641 2012-8-30 0:00: ER No Violations 1.00
-1060259113 2014-10-2 0:00: ER No Violations 0.50
-1062176021 2019-10-23 0:00 ER No Violations 2.30
-1089709395 2020-2-3 0:00:0 ER No Violations 1.00
-1170384905 2009-6-15 0:00: ER No Violations
-117942156 2011-3-29 0:00: ER No Violations
-1195546969 2015-10-15 0:00 ER No Violations 1.50
-1235117503 2005-1-12 0:00: ER No Violations
-12413404 2008-5-27 0:00: ER No Violations
-1362212894 2007-4-18 0:00: ER No Violations
-1380862665 2006-10-10 0:00 ER No Violations
-1453009471 2003-1-30 0:00: ER No Violations
-1494324975 2017-7-18 0:00: SW No Violations 0.40
-1583626250 2015-8-10 0:00: ER No Violations 1.50
-164233210 2018-3-19 0:00: SW No Violations 1.00
-164638185 2013-11-19 0:00 ER No Violations 2.00
-173745710 2013-5-21 0:00: ER No Violations 0.70
-178187557 2020-6-1 0:00:0 ER No Violations 1.00
-1874227002 2013-8-5 0:00:0 ER No Violations 2.00
-1942584797 2013-2-11 0:00: ER No Violations
-1973593271 2012-10-24 0:00 ER No Violations
-1998395454 2016-2-22 0:00: ER No Violations 1.00
-2014670221 2011-8-4 0:00:0 SW No Violations
-2022532885 2011-12-13 0:00 ER No Violations 1.00
-2029103438 2019-8-29 0:00: ER No Violations 0.70
-2047140182 2007-1-11 0:00: ER No Violations
-235403213 2013-9-6 0:00:0 ER No Violations 2.00
-241985931 2004-7-29 0:00: ER No Violations
-261050362 2005-4-7 0:00:0 ER No Violations
-29437582 2003-10-30 0:00 ER No Violations
-374352205 2014-7-2 0:00:0 ER No Violations 0.70
-396483480 2016-10-12 0:00 ER No Violations 0.50
-57835611 2011-12-13 0:00 ER No Violations
-631526963 2006-7-12 0:00: ER No Violations
-632922996 2010-7-8 0:00:0 ER No Violations
-634385402 2010-9-23 0:00: ER No Violations 0.50
-63513312 2007-1-16 0:00: ER No Violations
-6652437 2019-4-29 0:00: ER No Violations
-755372057 2007-11-1 0:00: ER No Violations
-813098035 2015-6-10 0:00: ER No Violations 1.00
-919922839 2007-7-3 0:00:0 ER No Violations
-988098479 2014-3-11 0:00: ER No Violations 1.00
0000PL2262 Preliminary Restoration No Violations Preliminary Restoration done information from Data Point
0001269i14 2001-01-18 Enhanced Recovery Project Violations Noted An inspection revealed that the well is not pumping at this time, water is flowing down well. ID at well and tanks need rewrote, and a monthly M.I.T. test done on the well with an inspector witnessing the test.
0006652437 2019-04-29 Enhanced Recovery Project Violations Noted Our records indicate that the Division has not received the Enhanced Recovery Annual Report (Form 204) that was due on April 15th for 2018, Please submit the Form 204 to the Division by 5/29/2019.
0012413404 2008-05-27 Enhanced Recovery Project No Violations No violations were noted.
0022712792 2008-02-11 Enhanced Recovery Project No Violations No violations were noted.
0029437582 2003-10-30 Enhanced Recovery Project No Violations No violations
0050931602 2010-03-22 Enhanced Recovery Project No Violations An inspection of the EOR well today revealed pressure equilization. During the initial inspection at approximately 1:50 pm, vacuum had been observed on both injection and annular locations of well. Notified Mr. Tom Tomastik by telephone and left message. Left message for Cremain, Production Manager for Bancequity at 2:10 pm. Mr. Cremain returned call and confirmed pressure equilization. Further stating that he just pressured up the well and it took and water was also observed on annulus valve. A mini-test was performed on the well from 4:01 pm to 4:16 pm. In this timeframe, the pressure loss dropped from 375 to 373 psi. The well passed the required test. A follow-up inspection will be conducted to monitor annulus pressure.
005609i202 2001-05-31 Enhanced Recovery Project Violations Noted An inspection of the well revealed the pump leaking brine and contamination around tanks and in dike.
005609i242 2001-07-12 Enhanced Recovery Project No Violations Follow - up on NOV , In - Compliance.
0057835611 2011-12-13 Enhanced Recovery Project No Violations No violations observed during inspection. 210 bbl tank has been replaced. Accompanied by Andy Thomas MRI.
0063513312 2007-01-16 Enhanced Recovery Project No Violations No violations were noted.
0070564236 2012-06-14 Enhanced Recovery Project No Violations There was fluid inside the dike. I made Mr. Jess Hess aware of this. He stated that he would get it cleaned up.
0086742186 2006-10-16 Enhanced Recovery Project No Violations On 10/16/2006, UIC construction was observed. New 2 3/8 tubing was utilized and set at 927.23 The company was informed that a variance request would be needed since, depth has now changed from 945 to 923 The ERP well passed the mechanical integrity test. After 15 minutes only 4psi was lost therefore, meeting the minimum requirement of 5% pressure loss.
0087007062 2004-03-10 Enhanced Recovery Project No Violations No violations at this time
0117942156 2011-03-29 Enhanced Recovery Project No Violations 210 bbl tank is leaking small amount oil into dike. Tank appears to have run over the top recently. Clean up in dike is evident by absorb pads and no pools of oil with in dike. Good identification. I talked to Tom Fischieto about the tank needing repaired. He told me that he is aware of the problem and plans to have the tank patched.
0123272625 2002-07-23 Enhanced Recovery Project No Violations An inspection of the well revealed ID needs rewrote at well and tanks, oily soil and oily gravel around tanks needs cleaned up. ALSO ADD PRESSURE TO ANNULUS SIDE OF WELL.
01269i1548 2002-11-21 Enhanced Recovery Project No Violations No violations at this time, lease rd will need graded and water breaks in spring.
0164233210 2018-03-19 Salt Water Injection Well No Violations My inspection revealed the salt water injection well had 0 psi on the injection tubing and had 25 psi on the annulus. The well had a legible identification.
0164638185 2013-11-19 Enhanced Recovery Project No Violations Inspected containment dike, Tank, injection pressure, and annulus pressure. Tank has been painted black.
0173745710 2013-05-21 Enhanced Recovery Project No Violations Inspected the injection pressure, annulus pressure, containment dike and tank. Dike is free of oil and water. Accompanied by Kip Thompson MRI.
0174642324 2018-09-05 Enhanced Recovery Project No Violations Inspected the containment dike, tank, injection pump, injection line, injection pressure and annulus pressure. Identification is posted. The containment dike is free of fluids.
0235403213 2013-09-06 Enhanced Recovery Project Violations Noted Inspected the containment dike, tank, annulus pressure, and injection pressure. Containment dike is free of water. Sump in dike is full of fluid and oil. Injection tubing has a thin layer of oil on it. Oil has ran down the wellhead and has splashed on to the grass approximately 10 by 24. The 210 barrel tank has 7 small holes in the side approximately middle of the tank. Leaking small amount of brine into the dike. Good identification at the wellhead. I called Mike McPeak and left him a message regarding the clean up and the holes in the tank.
0241985931 2004-07-29 Enhanced Recovery Project No Violations No violations
0261050362 2005-04-07 Enhanced Recovery Project Violations Noted An inspection of the well revealed the 1/4 valve on the annular side does not work, several holes in side of storage tank, oil & brine soils in dike area around tanks.
0280611607 2017-12-11 Salt Water Injection Well No Violations My inspection revealed the well is owned by Bancequity Petroleum. The well had 30 psi on the annulus and 0 psi on the injection tubing. The dike was free of fluids. Legible identification was posted.
0303927758 2006-10-09 Enhanced Recovery Project No Violations On 10/9/2006, the UIC construction was witnessed. Bancequity placed a new packer in the EOR well. During the inspection, it was noted that a considerable amount of psi was being lost and will need to be addressed.
0317102123 2006-10-25 Enhanced Recovery Project No Violations 2 3/8 tubing is being placed back into the hole.
0374352205 2014-07-02 Enhanced Recovery Project No Violations Inspected the containment dike, tank, injection pump, injection line, annulus pressure and injection pressure. Identification posted in containment dike.
0396388892 2006-01-25 Enhanced Recovery Project No Violations No violations, will need tested in spring.
0396483480 2016-10-12 Enhanced Recovery Project No Violations Inspected the containment dike, tank, injection pump, injection line, injection pressure and annulus pressure. Identification posted.
0447458057 2015-03-19 Enhanced Recovery Project Violations Noted Inspected the containment dike, tank, injection pump, injection line, injection pressure and annulus pressure. Injection pressure had slight vacuum then zero. The annulus pressure had slight vacuum then zero. I called Mike McPeak and a mini test is scheduled for 3-20-15.
0483237795 2013-09-10 Enhanced Recovery Project No Violations Containment dike is free of water. Vault has been pumped out. Wellhead has been cleaned. Oil spray has been removed from the vegetation at the wellhead. The 210 barrel steel tank has been emptied. Mike McPeak told me that the production wells that produce water for this enhanced recovery well have been shut in until the tank can be replaced.
0524226959 2016-06-15 Enhanced Recovery Project No Violations Inspected the containment dike, tank, injection pump, injection line, injection pressure and annulus pressure. Identification posted. Containment dike was free of fluids.
0631526963 2006-07-12 Enhanced Recovery Project Violations Noted An inspection was conducted at the facility owned by Bancequity on 7/12/2006. During the inspection, it was noted that a mini test will be required. Vacuum was observed at the annulus and injection side of the well. It is also recommended that the plastic containers be removed.
0632922996 2010-07-08 Enhanced Recovery Project No Violations A follow-up inspection was conducted to ensure that no vacuum exists on annular side of the well. Background: An inspection conducted on 6/30/2010 had initially revealed pressure equalization, as vacuum was observed on both injection and annulus. Vaccum blown down and nitrogen was then added. The well held pressure for a duration of 15 mins. Note: Mini test performed in March, due to similar conditions. A pressure of 72 psi was observed today. Mr. Tom Tomastik will be advised of well status.
0634385402 2010-09-23 Enhanced Recovery Project No Violations An inspection revealed no violations. Note: The gauge utilized for this inspection will require calibration.
0638545815 2006-10-03 Enhanced Recovery Project No Violations A construction inspection was conducted on 10/3/2006. During the inspection, it was noted that the half of the packer was missing.
0755372057 2007-11-01 Enhanced Recovery Project No Violations No violations were noted.
0798651653 2005-09-07 Enhanced Recovery Project No Violations Follow-up on NOV, In-Compliance.
0813098035 2015-06-10 Enhanced Recovery Project No Violations Inspected the containment dike, tank, injection pump, injection pressure, and annulus pressure.
0869764879 2010-12-30 Enhanced Recovery Project No Violations An inspection revealed that housekeeping is needed inside the dike on one side of 210 bbl tank. A 5 x 5 area contained oil on surface of the ground, which had been released from a hole at the top of this tank. Bancequity pumper at the location states that a patch will be welded to the top of tank and agreed to remove oil from the dike.
0886352763 2003-06-30 Enhanced Recovery Project No Violations No violations
0919922839 2007-07-03 Enhanced Recovery Project No Violations No violations were noted.
0928000186 2006-09-21 Enhanced Recovery Project No Violations A follow-up inspection was conducted at the facility owned by Bancequity on 9/21/2006. During the inspection, it was noted that the previously noted violations have not been resolved. The pumper for this company was informed of the inspection results. Also noted was that one of the two storage tanks contained a hole at the top of the tank and had a small leak at the bottom. The pumper stated that the company is planning on removing this tank.
0988098479 2014-03-11 Enhanced Recovery Project No Violations Inspected the containment dike, tank, injection pump, injection pressure and annulus pressure.
1006128186 2017-02-27 Enhanced Recovery Project No Violations Inspected the containment dike, tank, injection pump, injection line, injection pressure, and annulus pressure. Identification posted at the facility and the well. The containment dike is free of fluids.
1020211641 2012-08-30 Enhanced Recovery Project No Violations No violations were noted at the time of inspection.
1037282260 2010-06-30 Enhanced Recovery Project No Violations An inspection would again reveal pressure equalization, as vacuum was observed on both annular and injection side of well. Notified Mr. Mike Cremain, Bancequity Field Supervisor, of well status at 1:23 p.m. When comparing the annular pressure to previously noted occurrence on 3/22/2010, the pressure now appeared to be more significant. A nitrogen bottle had been left at well location since last inspection. Mr. Cremain arrived at location, opened the valve and pressure would eventually bleed off. Mr. Cremain applied the remaining 70 psi, in tank, to the annulus. Note: the well passed mini test during last inspection. No pressure would be observed. Mr. Tom Tomastik will be notified of the well condition.
1060259113 2014-10-02 Enhanced Recovery Project No Violations Inspected the containment dike, tank, injection pump, annulus pressure and injection pressure. Identification posted at well and in dike.
1073324989 2002-07-23 Enhanced Recovery Project Violations Noted FOLLOW UP TO NOV # 1232 An inspection of the well revealed ID needs rewrote at well and tanks, oily soil and oily gravel around tanks needs cleaned up. ALSO ADD PRESSURE TO ANNULUS SIDE OF WELL.
1078788805 2019-4-30 0:00: ER No Violations 0.50
1103210277 2005-06-29 Enhanced Recovery Project No Violations Follow-up on NOV, Non-Compliance, no action taken to comply with NOV.
1115661549 2018-10-25 Enhanced Recovery Project No Violations Inspected the containment dike, tank, injection pump, injection line, injection pressure and annulus pressure. Identification is posted. The containment dike is free of fluids.
1145262962 2019-02-26 Enhanced Recovery Project No Violations Inspected the containment dike, tank, injection pump, injection pressure and annulus pressure. Identification is posted. The containment dike has oil residue staining inside the dike. I talked to Jess Hess well tender about the staining. Jess told me that the vault overflowed a skim of oil, during a recent rain event. The containment dike is free of fluids.
1168955089 2007-01-16 Enhanced Recovery Project No Violations New Lat & Long acquired.
1170384905 2009-06-15 Enhanced Recovery Project No Violations An inspection revealed no violations at this time. New identification provided and the 210 bbl tank has been painted.
1195546969 2015-10-15 Enhanced Recovery Project No Violations Inspected the containment dike, injection pump, injection line, injection pressure and annulus pressure. Dike is free of fluids. Identification posted. Annulus had slight vacuum then went to zero psi.
123272625 2002-7-23 0:00: ER No Violations
1235117503 2005-01-12 Enhanced Recovery Project No Violations No violations.
1252763414 2009-09-01 Enhanced Recovery Project No Violations An inspection was conducted with Mr. Jeff Fry, West Region Oil & Gas Supervisor and UIC Field Supervisor. No violations were noted.
1266527505 2013-04-05 Enhanced Recovery Project No Violations Witnessed clean-up efforts at the tank battery for this well. All oil had been cleaned up and sand was being place in the bottom of the containment dike. Accompanied Inspector Kip Thompson.
1269i14 2001-1-18 0:00: ER No Violations
1269i1548 2002-11-21 0:00 ER No Violations
1287434459 2014-09-17 Enhanced Recovery Project No Violations Inspected the containment dike, injection pump, tank, injection line, annulus pressure and injection pressure. Identification posted at containment dike.
1320791752 2004-01-15 Enhanced Recovery Project No Violations No violations.
1339428600 2013-05-21 Salt Water Injection Well No Violations I accompanied Jon Scott on this injection well inspection.
1362212894 2007-04-18 Enhanced Recovery Project No Violations No violations were noted.
1380862665 2006-10-10 Enhanced Recovery Project No Violations No change was observed in the UIC construction. A considerable amount of pressure is still being lost.
1426870969 2015-03-20 Enhanced Recovery Project No Violations Mechanical Integrity Test. Filled annulus with 20 gallons fluid then pressure tested the annulus. The first and second attempts to test failed. The third test was pressured to 330 psi with no loss in pressure during the 15 minute test.
1451421651 2017-04-26 Enhanced Recovery Project No Violations Inspected the containment dike, tank, injection pump, injection line, injection pressure and annulus pressure. Identification posted.
1453009471 2003-01-30 Enhanced Recovery Project No Violations No violations at this time.
1471279929 2016-08-09 Enhanced Recovery Project No Violations Inspected the containment dike, tank, injection pump, injection line, injection pressure and annulus pressure. Identification posted. Containment dike is free of fluids.
1494324975 2017-07-18 Salt Water Injection Well No Violations Quarterly UIC inspection. The annulus pressure was 432 PSI, the injection tubing was 0 PSI. Legible identification was posted. No violations noted.
1530203711 2018-06-28 Enhanced Recovery Project No Violations Inspected the containment dike, tank, injection pump, injection line, injection pressure and annulus pressure. Identification is posted. The injection tubing master valve is closed.
1583626250 2015-08-10 Enhanced Recovery Project No Violations Inspected the containment dike, tank, injection pump, injection line, injection pressure and annulus pressure. Assisted UIC section Geologist in measuring the containment dike.
1642515849 2009-12-11 Enhanced Recovery Project No Violations An inspection revealed no violations.
1733003887 2008-09-16 Enhanced Recovery Project No Violations No violations were noted.
1734061826 2008-12-22 Enhanced Recovery Project No Violations No violations were noted. Note: Winter conditions at time of the inspection.
174642324 2018-9-5 0:00:0 ER No Violations 0.30
1781175265 2013-04-04 Enhanced Recovery Project No Violations Contaminated soil has been removed from the dike (approximately 1/4 ton) and taken to the Bancequity shop for bioremediation. Dike has a fresh layer of sand 3 in depth. Water has been removed from the dike. Violation is resolved.
1874227002 2013-08-05 Enhanced Recovery Project No Violations Inspected the containment dike, tank, injection pump, annulus pressure, and injection pressure. Good identification at the well and containment dike. Dike is free of water.
1942584797 2013-02-11 Enhanced Recovery Project No Violations An inpection revealed an oily mess inside of the tank battery. Hay had been spread on it to soak it up. I spoke to Jess Hess and Mike McPeak about this and they stated it will be cleaned up as soon as possible. It was caused by an overflown tank. Everything else was in compliance.
1973593271 2012-10-24 Enhanced Recovery Project No Violations Have removed old steel tank and replaced it with a 210 barrel steel tank.
1998395454 2016-02-22 Enhanced Recovery Project No Violations Inspected the containment dike, tank, injection pump, injection line, injection pressure and annulus pressure. Identification posted at the dike.
2014670221 2011-08-04 Salt Water Injection Well No Violations Good Identification. Tank has not been replaced. Tank still has pin holes in top one third of tank. Tank is not leaking at this time. Fluid level is being maintained below the holes.
2016587026 2006-10-26 Enhanced Recovery Project No Violations A new packer was set at 927.23 The well passed the pressure test. Only 1 psi was lost in 15 minutes (390 to 389). The previously noted violations have been resolved.
2022532885 2011-12-13 Enhanced Recovery Project No Violations Accompanied Jon Scott on inspection.
2044187963 2009-03-02 Enhanced Recovery Project Violations Noted An inspection revealed that identification is now missing at the well. The company was informed, in the field, of the inspection results.
2047140182 2007-01-11 Enhanced Recovery Project No Violations No violations were noted.
22712792 2008-2-11 0:00: ER No Violations
280611607 2017-12-11 0:00 SW No Violations 1.50
303927758 2006-10-9 0:00: ER No Violations
317102123 2006-10-25 0:00 ER No Violations
380371123 2019-10-4 0:00: ER No Violations 0.50
396388892 2006-1-25 0:00: ER No Violations
447458057 2015-3-19 0:00: ER No Violations 1.00
483237795 2013-9-10 0:00: ER No Violations
50931602 2010-3-22 0:00: ER No Violations
524226959 2016-6-15 0:00: ER No Violations 0.80
5609i202 2001-5-31 0:00: ER No Violations
5609i242 2001-7-12 0:00: ER No Violations
638545815 2006-10-3 0:00: ER No Violations
70564236 2012-6-14 0:00: ER No Violations 1.00
798651653 2005-9-7 0:00:0 ER No Violations
86742186 2006-10-16 0:00 ER No Violations
869764879 2010-12-30 0:00 ER No Violations 0.50
87007062 2004-3-10 0:00: ER No Violations
886352763 2003-6-30 0:00: ER No Violations
928000186 2006-9-21 0:00: ER No Violations
iTOMK00010 2001-01-18 Enhanced Recovery Project Violations Noted
iTOMK000106 2001-1-18 0:00: ER No Violations
iTOMK00013 2001-05-31 Enhanced Recovery Project No Violations 1509.22(A); 1501:9-5-06; 1509.03; 1501:9-05-09(A)(3) POLLUTION AND FITTING NEEDS REPLACED
iTOMK000136 2001-5-31 0:00: ER No Violations
PL2262 PL No Violations

Violations Commited

Inspection ID Violation ID Violation Date Violation Code Violation Comments
0001269i14 US-OH-107299 2001-01-22 Failure to notify inspector before Mech. Integrity Test
0001269i14 US-OH-107300 2001-01-22 Insufficient/No identification
0006652437 US-OH-127537 2019-05-09 Failure to file enhanced recovery annual report
005609i202 US-OH-126230 2001-05-31 Pollution/Contamination
005609i202 US-OH-126231 2001-05-31 Violation of injection tubing/fitting requirements
0235403213 US-OH-122345 2013-09-12 Contamination at storage facility (permit after 6/1/82)
0261050362 US-OH-122695 2005-04-11 Pollution/Contamination
0261050362 US-OH-122696 2005-04-11 Violation of injection tubing/fitting requirements
0261050362 US-OH-122697 2005-04-11 Tanks not liquid tight/Improper burial
0447458057 US-OH-124846 2015-03-26 Failure to monitor annulus pressure
0631526963 US-OH-127160 2006-07-24 Pollution/Contamination
0631526963 US-OH-127161 2006-07-24 Failure to monitor pressures or volumes/failure to file
0631526963 US-OH-127162 2006-07-24 Failure to pass required test
1073324989 US-OH-101544 2002-07-23 Contamination at storage facility (permit after 6/1/82)
1073324989 US-OH-101545 2002-07-23 Insufficient/No identification
2044187963 US-OH-120809 2009-03-09 Insufficient/No identification
iTOMK00010 US-OH-131651 Failure to notify inspector before Mech. Integrity Test

For data sources see[9]

References