Well ID: 34-163-20851 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.21,"lon":-82.29,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Vinton | |
Municipality: Knox Township | |
Operator Name: BANCEQUITY PETROLEUM CORPORATI | |
Well Pad ID: | |
Farm/Lease Name: STANEART CECIL | |
License Status: Active Injection | |
License Date: 1995-08-08 | |
Spud Date: 1984-10-05 | |
Spud Drilling Contractor: CO TOOLS | |
Final Drill Date: 1984-10-13 | |
Well Total Depth: 1500.00 ft | |
Configuration: Vertical | |
Latitude: 39.210000 | |
Longitude: -82.290000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
Oil and Gas | 1984-08-23 | Issued Date 8/23/84 Expired Date 12/28/85 Acres 0172000 Tool Type CRF Proposed Formation BEREA Proposed Depth 00000 Proposed Drill Depth 00000 |
Original Spud | 1984-10-05 | CONVERT 7-6-85, RI 9-6-86, RI 8-12-95, LOG TYPE =SB PERMIT EXPIRED. |
Completed | 1984-10-13 | CONVERT 7-6-85, RI 9-6-86, RI 8-12-95, LOG TYPE =SB PERMIT EXPIRED. |
Reached Total Depth | 1984-10-13 | CONVERT 7-6-85, RI 9-6-86, RI 8-12-95, LOG TYPE =SB PERMIT EXPIRED. |
CO | 1984-12-07 | 566 GRIM PAUL A GeoDate 8/23/84 |
First Injection | 1984-12-07 | CONVERT 7-6-85, RI 9-6-86, RI 8-12-95, LOG TYPE =SB PERMIT EXPIRED. |
Completion Report Received | 1985-03-26 | CONVERT 7-6-85, RI 9-6-86, RI 8-12-95, LOG TYPE =SB PERMIT EXPIRED. |
CO | 1985-07-02 | 566 GRIM PAUL A GeoDate 7/2/85 |
Enhanced Recovery | 1985-07-02 | Issued Date 7/2/85 Expired Date 12/28/85 Acres 0172000 Tool Type NT Proposed Formation BEREA Proposed Depth 01500 Proposed Drill Depth 01500 |
CO | 1986-09-03 | 566 GRIM PAUL A GeoDate 9/3/86 |
Enhanced Recovery | 1986-09-03 | Issued Date 9/3/86 Expired Date 9/3/87 Acres 0172000 Tool Type NT Proposed Formation BEREA Proposed Depth 00000 Proposed Drill Depth 00000 |
CO | 1995-08-08 | 566 GRIM PAUL A GeoDate 8/8/95 |
Enhanced Recovery | 1995-08-08 | Issued Date 8/8/95 Expired Date 8/7/96 Acres 0172000 Tool Type RTAF Proposed Formation BEREA Proposed Depth Proposed Drill Depth |
Annulus Pressure Monitoring Approved | 1996-07-05 | CONVERT 7-6-85, RI 9-6-86, RI 8-12-95, LOG TYPE =SB PERMIT EXPIRED. |
Construction Permit Expires | 1996-08-07 | CONVERT 7-6-85, RI 9-6-86, RI 8-12-95, LOG TYPE =SB PERMIT EXPIRED. |
Change of Owner | 2001-11-21 | Operator changed from 566, GRIM PAUL A to 5755, CHIEFTAIN ENERGY CORP. |
Change of Owner | 2008-04-24 | Operator changed from 5755, CHIEFTAIN ENERGY CORP to 566, GRIM PAUL A. THE TRANSFER OF THIS WELL IS PURSUANT TO JUDGEMENT ENTRY CASE # 04-CV06-062, VINTON COUNTY COURT OF COMMON PLEAS. |
Change of Owner | 2009-11-17 | Operator changed from 566, GRIM PAUL A to 4801, BANCEQUITY PETROLEUM CORP |
Change of Owner | 2009-11-18 | Operator changed from 4801, BANCEQUITY PETROLEUM CORP to 566, GRIM PAUL A |
Change of Owner | 2009-12-22 | Operator changed from 566, GRIM PAUL A to 4801, BANCEQUITY PETROLEUM CORP |
Last Compliance Report | 2016-12-27 | CONVERT 7-6-85, RI 9-6-86, RI 8-12-95, LOG TYPE =SB PERMIT EXPIRED. |
Record Last Modified | 2017-02-15 | CONVERT 7-6-85, RI 9-6-86, RI 8-12-95, LOG TYPE =SB PERMIT EXPIRED. |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2000-04-21 | 1273 | 1275 | 1 |
2000-04-21 | 1265 | 1267 | 1 |
1287 | 1289 | 1 | |
1295 | 1297 | 1 | |
1265 | 1267 | 1 | |
1273 | 1275 | 1 | |
1265 | 1267 | 1 | |
2000-04-21 | 1295 | 1297 | 1 |
2000-04-21 | 1287 | 1289 | 1 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 900 Bbl | 0 | ALSO FRAC WITH 15,000 LBS OF 20/50 SAND | ||
H2O | 0 | 0 | 0 | & SAND |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
1985 | GRIM PAUL A | 0.00 | 2757.00 | 365 |
1986 | GRIM PAUL A | 0.00 | 1079.00 | 365 |
1987 | GRIM PAUL A | 0.00 | 742.00 | 365 |
1988 | GRIM PAUL A | 0.00 | 415.00 | 365 |
1989 | GRIM PAUL A | 0.00 | 364.00 | 365 |
1990 | GRIM PAUL A | 0.00 | 489.00 | 365 |
1991 | GRIM PAUL A | 0.00 | 506.00 | 365 |
1992 | GRIM PAUL A | 0.00 | 289.00 | 365 |
1993 | GRIM PAUL A | 0.00 | 328.00 | 365 |
1994 | GRIM PAUL A | 0.00 | 0.00 | 365 |
1995 | GRIM PAUL A | 0.00 | 26.00 | 365 |
1996 | GRIM PAUL A | 0.00 | 5.00 | 365 |
1997 | GRIM PAUL A | 0.00 | 0.00 | 365 |
1998 | GRIM PAUL A | 0.00 | 0.00 | 365 |
1999 | GRIM PAUL A | 0.00 | 0.00 | 365 |
2000 | GRIM PAUL A | 0.00 | 0.00 | 365 |
2001 | GRIM PAUL A | 0.00 | 0.00 | 365 |
2010 | BANCEQUITY PETROLEUM CORPORATI | 300.00 | 180.00 | 276 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
1985 | GRIM PAUL A | Brine | 9246 | 365 |
1986 | GRIM PAUL A | Brine | 7338 | 365 |
1987 | GRIM PAUL A | Brine | 6972 | 365 |
1988 | GRIM PAUL A | Brine | 3952 | 365 |
1989 | GRIM PAUL A | Brine | 4260 | 365 |
1990 | GRIM PAUL A | Brine | 1552 | 365 |
1991 | GRIM PAUL A | Brine | 5949 | 365 |
1992 | GRIM PAUL A | Brine | 1464 | 365 |
1993 | GRIM PAUL A | Brine | 2058 | 365 |
1994 | GRIM PAUL A | Brine | 0 | 365 |
1995 | GRIM PAUL A | Brine | 120 | 365 |
1996 | GRIM PAUL A | Brine | 22 | 365 |
1997 | GRIM PAUL A | Brine | 0 | 365 |
1998 | GRIM PAUL A | Brine | 0 | 365 |
1999 | GRIM PAUL A | Brine | 0 | 365 |
2000 | GRIM PAUL A | Brine | 0 | 365 |
2001 | GRIM PAUL A | Brine | 0 | 365 |
2010 | BANCEQUITY PETROLEUM CORPORATI | Brine | 0 | 276 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1004587284 | 2007-4-19 0:00: | ER | No Violations | |
-1060900448 | 2015-3-11 0:00: | ER | No Violations | 3.00 |
-1070907701 | 2011-8-22 0:00: | ER | No Violations | |
-1072674992 | 2017-7-18 0:00: | SW | No Violations | 0.30 |
-1093233553 | 2016-6-9 0:00:0 | ER | No Violations | 1.00 |
-1094288967 | 2013-1-31 0:00: | ER | No Violations | 2.50 |
-1109441491 | 2007-2-23 0:00: | ER | No Violations | |
-1145219615 | 2015-3-12 0:00: | ER | No Violations | 2.00 |
-1149968042 | 2016-12-21 0:00 | ER | No Violations | 2.00 |
-1259341673 | 2010-7-8 0:00:0 | ER | No Violations | |
-1264405392 | 2014-4-1 0:00:0 | ER | No Violations | 1.50 |
-1430028308 | 2020-3-5 0:00:0 | ER | No Violations | 2.00 |
-1471675568 | 2011-12-13 0:00 | ER | No Violations | 2.00 |
-1505216398 | 2010-9-22 0:00: | ER | No Violations | 1.50 |
-1539432295 | 2005-10-20 0:00 | ER | No Violations | |
-155790919 | 2017-6-1 0:00:0 | SW | No Violations | |
-1564485034 | 2015-3-16 0:00: | ER | No Violations | 0.50 |
-1578701942 | 2019-8-26 0:00: | ER | No Violations | 1.00 |
-1589878603 | 2015-10-15 0:00 | ER | No Violations | 1.00 |
-170666187 | 2006-12-22 0:00 | ER | No Violations | |
-171011986 | 2018-6-25 0:00: | ER | No Violations | 4.00 |
-171069950 | 2011-12-13 0:00 | ER | No Violations | |
-1748057626 | 2013-9-9 0:00:0 | ER | No Violations | 2.50 |
-1927237363 | 2008-2-21 0:00: | ER | No Violations | |
-1963747237 | 2007-1-18 0:00: | ER | No Violations | |
-2025182201 | 2018-5-11 0:00: | ER | No Violations | 4.30 |
-241700543 | 2018-5-17 0:00: | ER | No Violations | 2.90 |
-263216073 | 2018-6-5 0:00:0 | ER | No Violations | 2.50 |
-286782332 | 2009-6-11 0:00: | ER | No Violations | |
-445360881 | 2005-4-7 0:00:0 | ER | No Violations | |
-607523155 | 2014-3-10 0:00: | ER | No Violations | 2.00 |
-616292266 | 2007-11-1 0:00: | ER | No Violations | |
-642077879 | 2011-4-14 0:00: | ER | No Violations | |
-725259960 | 2008-9-11 0:00: | ER | No Violations | |
-742057710 | 2014-3-10 0:00: | ER | No Violations | 2.00 |
-754663736 | 2012-1-17 0:00: | ER | No Violations | 1.00 |
-824130364 | 2008-12-22 0:00 | ER | No Violations | |
0000001102 | 2002-06-05 | Enhanced Recovery Project | No Violations | Follow-up on NOV, Non-Compliance. Done a mini test on well, well passed test, all other violations not corrected. |
0000PL2258 | Preliminary Restoration | No Violations | Preliminary Restoration done information from Data Point | |
0000UIC592 | 1989-01-17 | Enhanced Recovery Project | No Violations | 1502.22 (C)(1)(2)(3) Storage & Disp. |
0000UIC593 | 1989-01-17 | Enhanced Recovery Project | No Violations | 1501:9-5-06 Prevent cont. & Pol |
0000UIC594 | 1989-01-17 | Enhanced Recovery Project | No Violations | 1501:9-5-09 (A)(6) Stor.facility const. |
001269i755 | 2002-02-06 | Enhanced Recovery Project | Violations Noted | An inspection revealed that the violations have not been corrected by Paul Grim, now Chieftain Energy owns wells. No ID at the well or tanks, contaminated soil around and below dike of tank battery, dike walls leaking allowing brine and fluids to flow from dike. Lease road has erosion and eroding into creek. Need full ID at well and tank battery, contaminated soil needs cleaned up, dike wall needs repaired to prevent fluids from escaping. Lease road needs graded and water breaks put in. MIT test needs done on injection well, call inspector of time and date. |
0018843039 | 2018-10-02 | Enhanced Recovery Project | No Violations | Inspected the containment dike, tanks, injection pump, injection line, injection pressure and annulus pressure. Identification is posted. The containment dike is free of fluids. There is no new vegetative growth in the remediated area outside of the containment dike. |
005609i106 | 2001-03-22 | Enhanced Recovery Project | Violations Noted | An inspection of the well and tanks revealed that there are several cracks in the wall of the dike around the brine storage tanks and pump , allowing brine and oil to escape from the dike . A contaminated area below dike approx. 20ft by 30ft . No ID at well or tanks . |
005609i193 | 2001-05-03 | Enhanced Recovery Project | No Violations | Follow - up on NOV , Non - Complaince , cracks still in wall of dike and brine running onto the ground. No ID at well head or tank battery. |
005609i226 | 2001-06-08 | Enhanced Recovery Project | No Violations | An inspection revealed that the wall of the dike is still leaking brine and contaminating the area around and below the dike. |
0063284309 | 2013-01-25 | Enhanced Recovery Project | No Violations | I accompanied Andy Thomas on the inspection of this well. |
0071478583 | 2014-07-01 | Enhanced Recovery Project | Violations Noted | Inspected containment dike, tanks, injection pump, injection line, annulus pressure and injection pressure. Identification posted on tank and at well. A 2 by 5 bare area was observed outside the dike. A high end Quantab was placed is a small depression with in the bare area. The Quantab recorded 6.8 (2050 ppm Cl). The containment dike had 1 inch of water in the dike (from a recent rain event) just opposite of the bare area. The water in the containment dike was 1.2 on the high end Quantab. I called mike McPeak and we discussed the need to remediate the bare area and to keep the containment dike free of water. |
01269i1012 | 2002-05-06 | Enhanced Recovery Project | No Violations | Follow-up on Chiefs Order, company has not complied with NOV or Chiefs Order, have not tested well for injection, dike area still leaking, no ID at the well or tanks. |
01269i1310 | 2002-08-20 | Enhanced Recovery Project | No Violations | Follow - up on NOV, Non-Compliance, dike wall around storage tanks still leaking aloowing fluids to escape from dike. Cracks in dike wall have not been repaired. Kill areas behind and below dike, kill area approx. 25ft x 30ft. Oil and water standing in dike. ID on storage tank, none on well head. |
01269i1558 | 2002-11-25 | Enhanced Recovery Project | No Violations | Follow-up on NOV, In-Compliance. |
0141518339 | 2017-12-14 | Salt Water Injection Well | No Violations | My inspection revealed the salt water injection well had 285 psi on the injection tubing and the annulus had 84 psi. The containment dike was free of fluids. Legible identification was posted. |
0148179719 | 2007-12-26 | Enhanced Recovery Project | No Violations | A follow-up inspection revealed that the previously noted violations have been resolved. |
0155790919 | 2017-06-01 | Salt Water Injection Well | No Violations | Salt water injection well inspection. The injection pressure was 49 PSI, the annulus pressure was 120 PSI. No violations noted. |
0170666187 | 2006-12-22 | Enhanced Recovery Project | No Violations | On 12/22/2006, Mr. Brent Bear, Mineral Resources Inspector, met with Mr. Doug Kitchen and Mr. Ron McBride, Chieftain Energy to perform a MIT test and pump fluid from the dike. Mr. Kitchens had coordinated this meeting with the landowner and Mr. Kitchens attorney, due to a restraining order that is in effect. The landowner failed to show after 1.5hrs to unlock the gate. As a result, another date will have to be set to resolve the violations. Mr. Kitchen was instructed to schedule another date immediately. |
0171011986 | 2018-06-25 | Enhanced Recovery Project | No Violations | Compliance Notice # 202518221 follow up inspection. Vegetative growth has been established on the remediated area. Inspected the containment dike, tanks, injection pump, injection line, injection pressure and annulus pressure. Identification is posted. The containment dike is free of fluids. |
0171069950 | 2011-12-13 | Enhanced Recovery Project | Violations Noted | Accompanied by Andy Thomas MRI. Dike has cracks in concrete and is leaking brine. Vegetative scald area 4 by 10. Zero pressure on annulus. Andy called pumper and scheduled a mini test of the annulus and discussed the dike repairs that are needed. |
0241700543 | 2018-05-17 | Enhanced Recovery Project | No Violations | Compliance notice # 2025182201 follow up inspection. The scald area has been covered with soil excavated North West of the well. I talked to Jess Hess on site. Jess stated that they scraped the contaminated soil and hauled it to their yard. The new soil was placed over the excavated area with lime, fertilizer and grass seed applied to the location. |
0254729152 | 2016-02-22 | Enhanced Recovery Project | No Violations | inspected the containment dike, tanks, injection pump, injection line, injection pressure, and annulus pressure. Identification posted at well. Dike is free of water. |
0263216073 | 2018-06-05 | Enhanced Recovery Project | No Violations | Compliance Notice # 2025182201 follow up inspection. Inspected the containment dike, tanks, injection pump, injection pressure and annulus pressure. Identification is posted. The containment dike is free of fluids. Vegetative cover has not been established on the remediation area. The 2 inch injection tubing collar has salt build up on the outside of the tubing. I called Mike McPeak on 6-5-2018 at 2:36 pm, and told him that the remediation needs more effort to achieve vegetative cover. I also informed him about the salt build up on the injection tubing collar. |
0286782332 | 2009-06-11 | Enhanced Recovery Project | No Violations | An inspection revealed that the status remains the same. Court Case still pending between the landowner and company. RBDMS shows Mr. Paul Grim as the well owner. The displayed identification will need to show Mr. Grim instead of Chieftain Energy. The well is not being utilized at this time. 0 psi observed on both annulus and injection side of the well. |
0445360881 | 2005-04-07 | Enhanced Recovery Project | Violations Noted | An inspection of the well revealed no pressure on the injection side or annular side of well, no ID at the well. |
0530149472 | 2015-08-10 | Enhanced Recovery Project | No Violations | Inspected the containment dike, tanks, injection pump, injection line, injection pressure and annulus pressure. Assisted UIC section Geologist in measuring the containment dike. |
0569182074 | 2009-03-03 | Enhanced Recovery Project | No Violations | An inspection revealed that the status of this well has not changed. |
0599298646 | 2011-03-29 | Enhanced Recovery Project | No Violations | Annulus had zero pressure. I talked to Jess Hess and they are going to schedule a test. |
0607523155 | 2014-03-10 | Enhanced Recovery Project | No Violations | FOLLOW UP TO NOV # -742057710 Inspected containment dike, tanks, injection pump, injection line, injection pressure, and annulus pressure. Containment dike wall has cracks that need to be repaired. The containment dike is constructed of poured concrete. I called Mike McPeak and we discussed the dike condition. Mike was aware of the cracks and told me that they can repair the containment with in two weeks. |
0616292266 | 2007-11-01 | Enhanced Recovery Project | No Violations | An inspection revealed non-compliance. |
0642077879 | 2011-04-14 | Enhanced Recovery Project | No Violations | Witnessed mini test of the annulus. Tested at 350 psi for 15 minutes. 340 psi after 15 minutes. Mini test passed. |
0667045693 | 2005-06-08 | Enhanced Recovery Project | No Violations | No violations. |
0725259960 | 2008-09-11 | Enhanced Recovery Project | No Violations | A follow-up inspection revealed no pressure on the annulus. This well is not in operation at this time, due to a legal dispute. |
0742057710 | 2014-03-10 | Enhanced Recovery Project | No Violations | Inspected containment dike, tanks, injection pump, injection line, injection pressure, and annulus pressure. Containment dike wall has cracks that need to be repaired. The containment dike is constructed of poured concrete. I called Mike McPeak and we discussed the dike condition. Mike was aware of the cracks and told me that they can repair the containment with in two weeks. |
0754663736 | 2012-01-17 | Enhanced Recovery Project | No Violations | Conducted follow up inspection on tank battery. Cracks had not yet been sealed in the concrete containment system. Called Mike McPeak and left a voicemail on his phone. Accompanied by Inspector Kip Thompson. |
0824130364 | 2008-12-22 | Enhanced Recovery Project | No Violations | An inspection revealed that the well status has not changed since the last inspection. No annulus or injection pressure was observed. The concrete dike placed around the storage tanks is beginning to crack along the backside. A bare area approximately 5x 10 was observed below this location. |
0927781947 | 2013-07-29 | Enhanced Recovery Project | No Violations | Inspected the containment dike, tanks, injection pump, injection line, injection pressure, and annulus pressure. Water in dike goes from 0-4. Injection pump location has been moved with-in the dike. The scald area outside the dike is in need of more work. I called Mike McPeak and we discussed the need to keep the dike free of water and to remediate the scald area. Mike agreed to pump out the dike and to till up the scald area and apply lime, fertilizer, grass seed and mulch. |
0959914402 | 2016-07-29 | Enhanced Recovery Project | No Violations | Inspected the containment dike, tanks, injection pump, injection line, injection pressure and annulus pressure. Identification posted. The containment dike is free of fluids. |
0992304943 | 2004-03-04 | Enhanced Recovery Project | No Violations | No violations. |
1004587284 | 2007-04-19 | Enhanced Recovery Project | Violations Noted | An inspection conducted on 4/19/2007 revealed no pressure on the annulus side of the well. A valve was observed to be open, in which the pressure appears to have been released. |
1005407707 | 2012-06-14 | Enhanced Recovery Project | No Violations | Good identification was observed at the well site. No leaks were observed at the well head or tank battery. Where the concrete containment dike was sealed is proving effective. |
1024332125 | 2019-11-6 0:00: | ER | No Violations | 1.00 |
1060900448 | 2015-03-11 | Enhanced Recovery Project | Violations Noted | Inspected the containment dike, tanks, injection pump, injection line, injection pressure and annulus pressure. Containment dike was full of oil and water up to three inches from the top of the dike wall. The containment sump pump was in operation during the inspection and the fluid level did decrease approximately 1 inch during the inspection. The 100 barrel steel tank appears to have over flowed oil into the dike. I was unable to close the 1/4 valve on the injection tubing, so the company pressure gauge was re tightened. I was unable to open the 2 valve on the annulus. 20 psi was observed between the 2 valve and the 1/4 valve on the annulus. I called Mike McPeak at 1:51 pm and left a message outlining the need to continue to remove the fluids from the containment dike and that the 1/4 injection tubing valve needs replaced along with the 2 annulus valve. I called at 5:34pm and talked to Mike McPeak and we reviewed the dike clean up efforts and the need to replace the injection tubing valve and the annulus valve so that the pressures can be monitored. |
1070907701 | 2011-08-22 | Enhanced Recovery Project | No Violations | No violations observed during inspection. |
1072674992 | 2017-07-18 | Salt Water Injection Well | No Violations | Quarterly UIC inspection. The annulus pressure was 150 PSI, the injection tubing was 142 PSI. Legible identification was posted. No violations noted. |
1093233553 | 2016-06-09 | Enhanced Recovery Project | No Violations | Inspected the containment dike, tanks, injection pump, injection line, injection pressure and annulus pressure. Identification posted. Containment dike was free of fluids. |
1094288967 | 2013-01-31 | Enhanced Recovery Project | No Violations | The gauge on the annulus had 125 psi on it with both valves closed. No violations were noted. Conditions were very cold. |
1102 | 2002-6-5 0:00:0 | ER | No Violations | |
1109441491 | 2007-02-23 | Enhanced Recovery Project | No Violations | A follow-up inspection revealed that the dike has been repaired. The previously noted violation has been resolved. |
1145219615 | 2015-03-12 | Enhanced Recovery Project | No Violations | Bancequity crew is repairing the pump in order to remove the fluids from the dike. |
1149968042 | 2016-12-21 | Enhanced Recovery Project | No Violations | Mechanical Integrity Test. Tested the annulus at 390 psi, at 5 minutes 390 psi, at 15 minutes 390 psi. |
1155064470 | 2006-07-31 | Enhanced Recovery Project | Violations Noted | An inspection was conducted at the facility owned by Chieftain Energy Corp on 7/31/2006. During the inspection, it was noted that a mini test will be required. No pressure was found at either the injection or annulus side of the well. The dike for this facility will need to be repaired and liquid pumped out. Also noted was that identification is needed at the storage tanks. The owner, Mr, Doug Kitchen was verbally instructed of the deficiencies found during the inspection. |
1157372001 | 2018-09-07 | Enhanced Recovery Project | No Violations | Inspected the containment dike, tanks, injection pump, injection pressure and annulus pressure. Identification is posted. The containment dike is free of fluids. The previous remediated areas outside of the containment do not have vegetation on them. I contacted Mike McPeak and told him the Cecil Staneart 6 still needs remediation. Remove the soil and haul to an EPA approved landfill. Establish vegetative cover. |
1251981195 | 2012-08-30 | Enhanced Recovery Project | No Violations | No violations noted at the time of inspection. |
1259341673 | 2010-07-08 | Enhanced Recovery Project | No Violations | An inspection revealed no violations at this time. Notable changes were observed on this lease since the last inspection. At the entrance into the lease, on right hand side, the four 100 bbl tanks equipped for transfer to injection facility now contain an earthen dike. The injection facility contains an additional 100 bbl tank (painted black) placed inside concrete dike. A replacement pump appears to have also been installed at the facility. |
1264405392 | 2014-04-01 | Enhanced Recovery Project | No Violations | Compliance notice follow-up. Containment dike wall has been repaired. Damaged section of the dike wall was removed and new concrete was poured to make the containment dike whole. The injection pump has been replaced. Identification is posted. |
1269i1012 | 2002-5-6 0:00:0 | ER | No Violations | |
1269i1310 | 2002-8-20 0:00: | ER | No Violations | |
1269i1558 | 2002-11-25 0:00 | ER | No Violations | |
1269i755 | 2002-2-6 0:00:0 | ER | No Violations | |
1269i87356 | 2002-03-14 | Enhanced Recovery Project | No Violations | Follow-up on NOV, Non-Compliance, company has not complied with the NOV, no ID at well and tanks, dike walls leaking brine and oil, lease rd. still eroding, M.I.T. test not done on well, called Columbus and requested an Order be issued on this well to shut down well operations. COMPANY DID NOT SHOW UP FOR 2:00 PM MEETING, LEFT AT 2:30 PM. |
1269i87356894 | 2002-3-14 0:00: | ER | No Violations | |
1279935717 | 2016-10-12 | Enhanced Recovery Project | No Violations | Inspected the containment dike, tanks, injection pump, injection line, injection pressure and annulus pressure. Identification is posted. The containment dike is free of fluids. |
1293569517 | 2010-12-28 | Enhanced Recovery Project | No Violations | An inspection revealed no violations. Snow cover at time of inspection. |
1325247741 | 2011-12-22 | Enhanced Recovery Project | No Violations | Witnessed mini-test on the annulus of this well. Test started at 10:30 am at 340 psi., and ended at 10:45 at 340 psi. |
1331195321 | 2018-03-22 | Salt Water Injection Well | No Violations | The salt water injection well had 75 psi on the annulus and 125 psi on the injection tubing. The dike was relativity free of fluids. Legible identification was posted. |
1369410476 | 2013-05-20 | Enhanced Recovery Project | Violations Noted | Inspected the injection pressure, annulus pressure, containment dike and tanks. Concrete dike has 4 of water in it. Dike has a seep with an associated scald area approximately 3 by 10. I called and talked to Mike McPeak about the dike condition. I told Mike to pump the water out of the dike and into a tank. Seal the dike. Remediate the scald area. |
1380710429 | 2013-08-05 | Enhanced Recovery Project | No Violations | Dike is free of water. Scald area out side dike has been tilled up with lime and fertilizer applied. Seed and straw have been applied to location. No vegetative growth on the scald site. |
1385792811 | 2019-01-28 | Enhanced Recovery Project | No Violations | Inspected the containment dike, tanks, injection pump, injection line, injection pressure and annulus pressure. Identification is posted. The containment dike is free of fluids. Vegetative cover has been established down slope of the containment dike. |
1408564513 | 2014-08-20 | Enhanced Recovery Project | No Violations | Compliance Notice # 71478583 Follow up. Inspected the containment dike, tanks, injection pump, injection line, annulus pressure and injection pressure. Scald area outside the containment dike is 30 by 60. Containment dike is free of water. I called Mike McPeak and left a message about the need to remediate the scald area. I requested a time frame for completion of the remediation. |
1410789174 | 2014-09-15 | Enhanced Recovery Project | No Violations | Inspected the containment dike, tanks, injection pump, annulus pressure and injection pressure. Identification posted near well on post. Bare area outside containment dike has been remediated. Site has been seeded with mulch applied. Vegetative growth has started to establish on affected area. |
1412256613 | 2014-10-02 | Enhanced Recovery Project | No Violations | Inspected the containment dike, tanks, injection pump, injection line, annulus pressure and injection pressure. Identification posted at well and on a tank in the containment dike. |
141518339 | 2017-12-14 0:00 | SW | No Violations | 1.00 |
1426191458 | 2015-03-12 | Enhanced Recovery Project | Violations Noted | Follow up inspection of the surface facility revealed that the oil and water had not been removed from the containment dike. The containment dike sump pump was turned off. Two brine seeps and scald areas were observed down slope, South of the surface facility containment dike. 1st measured 6 feet by 6 feet, 2nd measured 21 feet by 3 feet. High Range Quantabs were used to determine the extent of the contaminated area. Both scald areas exceeded 6078 ppm Cl (mg/L). All Fluids in the containment dike must be removed and placed in tanks. The containment dike must be water tight. Repair or replace the containment dike so that it is water tight. Remove all contaminated soils and take them to an EPA approved land fill. Remediate the contaminated areas. |
1426790870 | 2015-03-19 | Enhanced Recovery Project | No Violations | Containment dike is free of oil and water. A crack in the containment dike wall has been repaired. The brine seep and scald areas out side of the containment dike have been tilled up and lime has been applied to the disturbed area. |
1471675568 | 2011-12-13 | Enhanced Recovery Project | No Violations | Accompanied Jon Scott on inspection. Request mini test from Mike McPeak on this well. Mini test performed on 12/22/2011. Test was started at 10:30 am at 330 psi. Test ended at 10:45 am at 330 psi. No pressure loss. |
148179719 | 2007-12-26 0:00 | ER | No Violations | |
1492613692 | 2017-04-10 | Enhanced Recovery Project | No Violations | Inspected the containment dike, tanks, injection pump, injection line, injection pressure and annulus pressure. Identification posted. The containment dike is free of fluids. |
1505216398 | 2010-09-22 | Enhanced Recovery Project | No Violations | An inspection revealed no violations. Note: The gauge utilized for this inspection will require calibration. |
1522755219 | 2014-05-21 | Enhanced Recovery Project | No Violations | Inspected the containment dike, tanks, injection pump, injection line, annulus pressure, and injection pressure. Good identification posted on tank in containment dike. Annulus pressure on vacuum. I called Mike McPeak and told him that the annulus was on vacuum and that they must stop injection until the annulus is tested. Mike told me that they will be at the well to test the annulus today. The annulus was filled with one gallon of fresh water and pressured up to 300 psi for a mini test. Annulus held 300 psi for 15 minutes. |
1539432295 | 2005-10-20 | Enhanced Recovery Project | Violations Noted | FAILURE TO SUBMIT ANNUAL ENHANCED RECOVERY INJECTION WELL REPORT FOR 2004 |
1564485034 | 2015-03-16 | Enhanced Recovery Project | No Violations | Compliance notice follow up. Bancequity crew is on site and is working on removing the oil from the sump pit. |
1589878603 | 2015-10-15 | Enhanced Recovery Project | No Violations | Inspected the containment dike, tanks, injection pump, injection line, injection pressure and annulus pressure. Identification posted between well and dike. Containment dike is free of fluids. |
1625721807 | 2009-12-09 | Enhanced Recovery Project | No Violations | An inspection revealed no injection at this time. The well status remains the same as previous inspection, no observed pressures and/or vacuum. New identification has been placed at the well showing Bancequity as the new well owner. At this time, RBDMS shows Paul Grim is still the well owner. |
1748057626 | 2013-09-09 | Enhanced Recovery Project | No Violations | Inspected the containment dike, tanks, annulus pressure, and injection pressure. Containment dike is free of water. Good identification at the wellhead. Vegetation has been established on the scald area. |
1808648793 | 2013-01-24 | Enhanced Recovery Project | Violations Noted | A visual inspection of the facility revealed no violations. When checking the pressures on the annulus and the injection tubing, I noticed that the annulus pressure was 0 and the injection was on vacuum. There are no other violations at this facility. I called Mr. Mike McPeak at 12:52 PM and told him that the pressure on the annulus needs to be above 0. He stated that he would go and pressure up on it later today. I will check the pressure again on 1/28/13. Accompanied on inspection by Justin Smith. |
1876513591 | 2004-06-10 | Enhanced Recovery Project | No Violations | Non-compliance, met with JoeHoerst, Dave Hodges, and Doug Kitchen and his attorney to review violations at well site. |
18843039 | 2018-10-2 0:00: | ER | No Violations | 0.70 |
1916987448 | 2010-03-17 | Enhanced Recovery Project | No Violations | An inspection revealed no violations at this time. During the inspection, it was noted that the new well owner continues to perform work on EOR well. New 2 black plastic line has been installed on storage tank bottoms, new electric motor, identification displayed, filters connected along with injection line. The storage tanks have now been painted black. At the location, a company representative stated that the well passed their mini-test with a 12 lb loss at 300 psi. They found that pressure is bleeding off around the stripping rubbers. Note: additional work performed on this lease include installation of (4) 100 bbl tanks at entrance. |
1927237363 | 2008-02-21 | Enhanced Recovery Project | Violations Noted | An inspection revealed no positive pressure on the annulus. |
1941811368 | 2009-09-01 | Enhanced Recovery Project | No Violations | An inspection was conducted with Mr. Jeff Fry, West Region Oil & Gas Supervisor and UIC Field Supervisor. During the inspection, it was noted that the status remains the same. No injection of annulus pressure was observed. The displayed identification will need to be changed from Cheiftain Energy to Paul Grim. |
1963747237 | 2007-01-18 | Enhanced Recovery Project | No Violations | A mini-test was conducted on 1/18/2007. The well passed the required test. The dike was pumped however, the dike will need repaired to prevent leakage. Cracks were observed along the backside of the dike. The owner, Mr. Doug Kitchen, was instructed to make the necessary repairs. |
1990434176 | 2015-05-21 | Enhanced Recovery Project | No Violations | Inspected the containment dike, tanks, injection pump, injection line, injection pressure and annulus pressure. Good identification posted. Containment dike free of fluids. |
2025182201 | 2018-05-11 | Enhanced Recovery Project | Violations Noted | Inspected the containment dike, tanks, injection pump, injection line, injection pressure and annulus pressure. Identification is posted. A brine scald area with oil residue was observed at the south east corner of the dike. The scald area is 30 feet by 5 feet. I Called Mike McPeak we discussed the scald area and the remediation of the site. Contaminated soil must be removed and hauled to an EPA approved landfill. Must establish vegetative growth on the remediated site. |
2107390775 | 2006-09-20 | Enhanced Recovery Project | No Violations | A follow-up inspection was conducted at the facility owned by Chieftain Energy Corp., on 9/20/2006. During the inspection, it was noted that the previously noted violations have not been resolved. The owner, Mr. Doug Kitchen was contacted by telephone and instructed to resolve deficiencies. |
254729152 | 2016-2-22 0:00: | ER | No Violations | 1.00 |
373717666 | 2019-4-30 0:00: | ER | No Violations | 2.70 |
530149472 | 2015-8-10 0:00: | ER | No Violations | 0.70 |
5609i106 | 2001-3-22 0:00: | ER | No Violations | |
5609i193 | 2001-5-3 0:00:0 | ER | No Violations | |
5609i226 | 2001-6-8 0:00:0 | ER | No Violations | |
569182074 | 2009-3-3 0:00:0 | ER | No Violations | |
599298646 | 2011-3-29 0:00: | ER | No Violations | |
63284309 | 2013-1-25 0:00: | ER | No Violations | |
667045693 | 2005-6-8 0:00:0 | ER | No Violations | |
71478583 | 2014-7-1 0:00:0 | ER | No Violations | 1.50 |
727986061 | 2020-4-16 0:00: | ER | No Violations | 2.50 |
927781947 | 2013-7-29 0:00: | ER | No Violations | 1.00 |
959914402 | 2016-7-29 0:00: | ER | No Violations | 2.50 |
992304943 | 2004-3-4 0:00:0 | ER | No Violations | |
iTOMK00012 | 2001-03-22 | Enhanced Recovery Project | No Violations | |
iTOMK000123 | 2001-3-22 0:00: | ER | No Violations | |
PL2258 | PL | No Violations | ||
UIC592 | 1989-1-17 0:00: | ER | No Violations | |
UIC593 | 1989-1-17 0:00: | ER | No Violations | |
UIC594 | 1989-1-17 0:00: | ER | No Violations |
Inspection ID | Violation ID | Violation Date | Violation Code | Violation Comments |
---|---|---|---|---|
001269i755 | US-OH-107269 | 2002-02-07 | Pollution/Contamination | |
001269i755 | US-OH-107270 | 2002-02-07 | Contamination at storage facility (permit after 6/1/82) | |
001269i755 | US-OH-107271 | 2002-02-07 | Insufficient/No identification | |
005609i106 | US-OH-126194 | 2001-03-22 | Pollution/Contamination | |
005609i106 | US-OH-126195 | 2001-03-22 | Insufficient/No identification | |
005609i106 | US-OH-126196 | 2001-03-22 | Dike or pit not able to prevent escape of brine or other wastes | |
005609i106 | US-OH-126197 | 2001-03-22 | Unlawful use of pit for temporary storage of brine or other wastes | |
0071478583 | US-OH-128115 | 2014-09-22 | Pollution/Contamination | |
0171069950 | US-OH-116958 | 2011-12-30 | Contamination at storage facility (permit after 6/1/82) | |
0171069950 | US-OH-116959 | 2011-12-30 | Failure to monitor annulus pressure | |
0445360881 | US-OH-124809 | 2005-04-11 | Insufficient/No identification | |
1004587284 | US-OH-100503 | 2007-04-23 | Failure to monitor annulus pressure | |
1060900448 | US-OH-101186 | 2015-03-26 | Violation of injection tubing/fitting requirements | |
1060900448 | US-OH-101187 | 2015-03-26 | Contamination at storage facility (permit after 6/1/82) | |
1060900448 | US-OH-101188 | 2015-03-26 | Failure to monitor annulus pressure | |
1155064470 | US-OH-104065 | 2006-08-08 | Contamination at storage facility (permit after 6/1/82) | |
1155064470 | US-OH-104066 | 2006-08-08 | Failure to monitor annulus pressure | |
1155064470 | US-OH-104067 | 2006-08-08 | Insufficient/No identification | |
1155064470 | US-OH-104068 | 2006-08-08 | Failure to pass required test | |
1369410476 | US-OH-110902 | 2014-04-23 | Pollution/Contamination | |
1426191458 | US-OH-112415 | 2015-03-26 | Pollution/Contamination | |
1426191458 | US-OH-112416 | 2015-03-26 | Contamination at storage facility (permit after 6/1/82) | |
1539432295 | US-OH-114874 | 2005-10-20 | Failure to monitor pressures or volumes/failure to file | |
1808648793 | US-OH-118068 | 2013-01-25 | Failure to monitor annulus pressure | |
1927237363 | US-OH-119394 | 2008-02-22 | Failure to monitor annulus pressure | |
2025182201 | US-OH-120595 | 2018-08-13 | 9-5-09(A)6 | Contamination at storage facility (permit after 6/1/82) |