If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-167-23226 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.37,"lon":-81.62,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Washington | |
Municipality: Barlow Township | |
Operator Name: ANDERSON ALLEN M | |
Well Pad ID: | |
Farm/Lease Name: EATON PAUL F& ALMA | |
License Status: Producing | |
License Date: 1982-12-28 | |
Spud Date: 1969-05-26 | |
Spud Drilling Contractor: | |
Final Drill Date: 1969-07-14 | |
Well Total Depth: 2263.00 ft | |
Configuration: Vertical | |
Latitude: 39.370000 | |
Longitude: -81.620000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
Original Spud | 1969-05-26 | TOTAL DEPTH FROM PLUG-BACK RPT. |
Completed | 1969-07-14 | TOTAL DEPTH FROM PLUG-BACK RPT. |
Reached Total Depth | 1969-07-14 | TOTAL DEPTH FROM PLUG-BACK RPT. |
CO | 1982-12-28 | 1331 TRI-CITY DRILL JOINT VENT GeoDate 12/28/82 |
Change of Owner | 2002-06-13 | Operator changed from 1331, TRI-CITY DRILL JOINT VENT to 21, ANDERSON ALLEN M |
Record Last Modified | 2013-10-03 | TOTAL DEPTH FROM PLUG-BACK RPT. |
For data sources see[2]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
1984 | TRI-CITY DRILLING JOINT VENTUR | 411.00 | 81.00 | 0 |
1985 | TRI-CITY DRILLING JOINT VENTUR | 817.00 | 153.00 | 0 |
1986 | TRI-CITY DRILLING JOINT VENTUR | 742.00 | 21.00 | 365 |
1987 | TRI-CITY DRILLING JOINT VENTUR | 620.00 | 171.00 | 365 |
1988 | TRI-CITY DRILLING JOINT VENTUR | 415.00 | 77.00 | 365 |
1989 | TRI-CITY DRILLING JOINT VENTUR | 589.00 | 158.00 | 365 |
1990 | TRI-CITY DRILLING JOINT VENTUR | 486.00 | 86.00 | 365 |
1991 | TRI-CITY DRILLING JOINT VENTUR | 302.00 | 0.00 | 365 |
1992 | TRI-CITY DRILLING JOINT VENTUR | 313.00 | 66.00 | 365 |
1993 | TRI-CITY DRILLING JOINT VENTUR | 216.00 | 0.00 | 365 |
1994 | TRI-CITY DRILLING JOINT VENTUR | 172.00 | 0.00 | 0 |
1995 | TRI-CITY DRILLING JOINT VENTUR | 100.00 | 84.00 | 365 |
1996 | TRI-CITY DRILLING JOINT VENTUR | 105.00 | 80.00 | 365 |
1997 | TRI-CITY DRILLING JOINT VENTUR | 30.00 | 0.00 | 365 |
1998 | TRI-CITY DRILLING JOINT VENTUR | 18.00 | 0.00 | 365 |
1999 | TRI-CITY DRILLING JOINT VENTUR | 0.00 | 87.00 | 0 |
2000 | TRI-CITY DRILLING JOINT VENTUR | 0.00 | 0.00 | 0 |
2001 | TRI-CITY DRILLING JOINT VENTUR | 0.00 | 0.00 | 0 |
2002 | ANDERSON ALLEN M | 242.00 | 0.00 | 365 |
2003 | ANDERSON ALLEN M | 574.00 | 18.00 | 365 |
2004 | ANDERSON ALLEN M | 574.00 | 37.00 | 365 |
2005 | ANDERSON ALLEN M | 452.00 | 14.00 | 365 |
2006 | ANDERSON ALLEN M | 602.00 | 0.00 | 365 |
2007 | ANDERSON ALLEN M | 490.00 | 23.00 | 365 |
2008 | ANDERSON ALLEN M | 537.00 | 0.00 | 365 |
2009 | ANDERSON ALLEN M | 540.00 | 18.00 | 365 |
2010 | ANDERSON ALLEN M | 535.00 | 19.00 | 365 |
2011 | ANDERSON ALLEN M | 475.00 | 7.00 | 365 |
2012 | ANDERSON ALLEN M | 352.00 | 8.00 | 366 |
2013 | ANDERSON ALLEN M | 552.00 | 10.00 | 365 |
2014 | ANDERSON ALLEN M | 446.00 | 4.00 | 365 |
2015 | ANDERSON ALLEN M | 418.00 | 0.00 | 365 |
2016 | ANDERSON ALLEN M | 522.00 | 8.00 | 365 |
2017 | ANDERSON ALLEN M | 424.00 | 9.00 | 365 |
2018 | ANDERSON ALLEN M | 355.00 | 0.00 | 365 |