If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 34-167-25710 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.47,"lon":-81.26,"icon":""}]} |
| Country: United States | |
| State: Ohio | |
| County: Washington | |
| Municipality: Lawrence Township | |
| Operator Name: STONEBRIDGE OPERATING CO LLC | |
| Well Pad ID: | |
| Farm/Lease Name: USA-DEPUY | |
| License Status: Final Restoration | |
| License Date: 2015-09-23 | |
| Spud Date: 1980-10-29 | |
| Spud Drilling Contractor: | |
| Final Drill Date: 1980-11-02 | |
| Well Total Depth: 3749.00 ft | |
| Configuration: Vertical | |
| Latitude: 39.470000 | |
| Longitude: -81.260000 |
For data sources see[1]
| Well Status | Well Status Date | Comment |
|---|---|---|
| CO | 1980-07-17 | 2070 HALWELL COMPANY GeoDate 7/17/80 |
| Original Spud | 1980-10-29 | |
| Completed | 1980-11-02 | |
| Reached Total Depth | 1980-11-02 | |
| APP | 2015-09-23 | Proposed Formations:OHIO SHALE, Issued Date:9/23/2015, Expired Date:9/22/2017 12:00:00 PM, Drilling unit acres:20, Proposed Well Type:OG, Proposed Well Class: |
| Plugged/Abandoned | 2015-10-16 | |
| Record Last Modified | 2017-02-10 | |
| Construction Permit Expires | 2017-09-22 |
For data sources see[2]
| Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
|---|---|---|---|
| 2006-09-11 | 3269 | 3629 | 29 |
| 3269 | 3629 | 29 | |
| 3269 | 3629 | 29 |
For data sources see[3]
| Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
|---|---|---|---|---|---|---|
| N2 | 0 | 703 Mscf | 0 |
For data sources see[4]
| Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|
| -526900304 | 2015-10-14 0:00 | PB | No Violations | 5.00 |
| 0526900304 | 2015-10-14 | Plug / Plug Back | No Violations | On location to witness plugging operations for this well. Matheny Well Service is rigged up over the well and Formation Cementing is on location to set 3 plugs across sets of perforations in the Ohio Shale and 30 Foot Sandstone. For plug #1, 2.375 tubing was set at 3496 and a 200 plug was set inside the 4.5 casing from 3496-3296 using 15 sks class A cement and 15 lbs celloflake as LCM. For plug #2, tubing was pulled to 3270 and a 200 plug was set using 15 sks class A cement and 15 lbs cellflake as LCM. For plug #3, tubing was pulled to 2368 and a 330 plug was set using 25 sks class A cement and 20 lbs celloflake as LCM. Some cement circulated back to surface during the pumping of plug #3, however it was determined that it was light lead cement from plug #1 which migrated uphole during displacement. Tubing was pulled 300 above plug and the hole was circulated clean. Good circulation was established on all plugs. Plug #3 will be tagged and the 4.5 casing will be ripped tomorrow in preparation for plugging the rest of the well out. |
| 1105654957 | 2005-01-13 | Production Wells | No Violations | Inspection this day found no violations, well tied into line and producing, current chart in meter, tank has good IDs, good dike |
| 1445270217 | 2015-10-16 | Plug / Plug Back | No Violations | On location to witness plugging operations for this well. Matheny Well Services tagged the top of the previous perforation plug at 2150, indicating it stayed where it was intended to be. The 4.5 casing was ripped at 1635 and 1 joint was pulled. Formation Cementing pumped a 150 rip isolation plug from 1603-1453 with 43 sks class A cement with 2% CaCl and celloflake as LCM. Gel drilling mud was circulated out of the 8.625 surface casing throughout the pumping of this plug. 4.5 casing was pulled to 1306 and a 200 bottom-of-surface plug was set using 59 sks class A cement with 2% CaCl and celloflake as LCM. Casing was then pulled to 200 and a 200 plug was circulated to surface. The remaining casing was pulled and the cement was topped-off to 30 below grade. Cement did not drop. Good circulation was established on all plugs. |
| 2016612524 | 2015-12-31 | Final Restoration | No Violations | Upon inspection, it was observed that this location is fully reclaimed. The pits are filled, the location is back to grade, production equipment has been removed, the lease road is restored, and there is a full vegetative cover established. Final restoration passed 12/31/15. |
For data sources see[9]