Well ID: 34-167-29717 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.5,"lon":-81.09,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Washington | |
Municipality: Grandview Township | |
Operator Name: FLAT ROCK DEVELOPMENT LLC | |
Well Pad ID: | |
Farm/Lease Name: COLLINS | |
License Status: Plugged and Abandoned | |
License Date: 2019-09-10 | |
Spud Date: 2012-10-01 | |
Spud Drilling Contractor: WACO DRILLING | |
Final Drill Date: 2012-10-17 | |
Well Total Depth: 10220.00 ft | |
Configuration: Vertical | |
Latitude: 39.500000 | |
Longitude: -81.090000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2012-09-04 | Proposed Formations:BIG INJUN THRU TRENTON, Issued Date:9/4/2012, Expired Date:9/4/2014 12:00:00 PM, Drilling unit acres:40, Proposed Well Type:OG, Proposed Well Class:EDPW |
Correction to Well | 2012-10-12 | CORRECTION TO PROPOSED TOTAL DEPTH. |
Reached Total Depth | 2012-10-17 | |
Plugged Back | 2012-10-26 | |
Completion Report Received | 2012-12-24 | |
APP | 2015-03-09 | Proposed Formations:, Issued Date:3/9/2015, Expired Date:3/8/2017 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:OG, Proposed Well Class:TI |
APP | 2016-04-19 | Proposed Formations:POINT PLEASANT, Issued Date:4/19/2016, Expired Date:4/19/2018 12:00:00 PM, Drilling unit acres:40, Proposed Well Type:OG, Proposed Well Class:TI |
APP | 2017-05-10 | Proposed Formations:, Issued Date:5/10/2017, Expired Date:5/10/2019 12:00:00 PM, Drilling unit acres:40, Proposed Well Type:ST, Proposed Well Class:TI |
Construction Permit Expires | 2018-05-10 | |
Record Last Modified | 2018-05-10 |
For data sources see[2]
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1731302331 | 2012-10-24 0:00 | PB | No Violations | 6.00 |
-324912882 | 2012-10-17 0:00 | DD | No Violations | 1.00 |
-443329195 | 2019-11-7 0:00: | PB | No Violations | 5.00 |
-478613128 | 2012-10-3 0:00: | DD | No Violations | 5.50 |
-908681186 | 2015-9-3 0:00:0 | DD | No Violations | 1.50 |
0240630279 | 2016-10-20 | Drill / Deepen / Reopen | No Violations | On location with DOGRM Eng. Tech. Andy Thomas and Flat Rock Development Representative Scott Gannon to review this well location to satisfy semi-annual 2nd year temporary inactive status requirements. Upon inspection, it is observed that the location is stable and not causing substantial erosion or sedimentation. No violations were observed at the well, which currently has a cap on the well head and is idle. There is now a steel plate covering the cellar and well head to prevent water from pooling and to serve as a safety precaution. Andy Thomas has informed Mr. Gannon of pad construction requirements should Flat Rock Development decide to pursue drilling a horizontal leg off of this stratigraphic test well in the future. Temporary inactive status requirements are currently satisfied. |
0324912882 | 2012-10-17 | Drill / Deepen / Reopen | No Violations | Steve Bumgardner, consultant, called to say rig TDd this morning at 7:30 at 10,220. Will start logging well tonight, then go back in and do side-wall coring. They may also do some formation testing if warranted. If not, will start plugging back on Friday or Sat. |
0478613128 | 2012-10-03 | Drill / Deepen / Reopen | Violations Noted | My arrival found rig going in hole with 13 3/8 casing. I was unable to witness conductor cementing but had been to rig before drilling started and felt they had read their permit and pointed out to them when inspectors were to be notified. After the cement crew had cementing head on and trucks hooked up, ready to pump cement, I realized they had not met permit conditions which called for 500 of surface casing - they had only run 336 after drilling 17.5 hole to 361. They also did not set enough conductor, setting only 30 when the permit called for 100. Again stressed the importance of reading their permit and let them go ahead and cement this lesser amount of surface casing, calling Steve Opritza this morning and explaining what had happened. Intermediate string will need to be cemented to surface. Operator had also failed to notify when location was begun to be built and when rig moved in. I told them they must test BOP and that even though surface casing was new, they needed to do test for integrity of cement and surface casing before drilling further. I will continue to monitor the rig closely. |
0617804020 | 2014-10-30 | Preliminary Restoration | No Violations | Upon inspection, it was observed that the preliminary restoration activities for this well have been completed. The containment berm around the perimeter of the well pad has been re-seeded/mulched and vegetation is growing in sufficiently enough to prevent significant erosion. This fulfills the requirements of the compliance notice. |
0908681186 | 2015-09-03 | Drill / Deepen / Reopen | No Violations | Met with Flat Rock Development representative Scott Gannon on this location to perform a 6 month review for temporary inactive status. Upon inspection, it was observed that the well pad is stable and the requirements for keeping temporary inactive status are still met. |
1092706527 | 2012-10-09 | Drill / Deepen / Reopen | No Violations | I received graphs today for test of cement integrity - BOP and 13 3/8 surface casing on 10/4/12 shows passed test at 300# for 30 min. On 10/7/12, tested 9 5/8 casing and cement with BOP at 500# for 30 min. and passed. Both tests done by Full Circle Oil Field Services and received copy of graphs which I will forward to Columbus. While out at rig, noted they were drilling with hammer bit and were at 4250. 10/10 - Talked to Steve for Flat Rock - says they at at 5500 at 8 PM - have not been able to talk to Steve Opritza to ask for deeper TD. They now want to drill to 10,500 |
1118249074 | 2012-10-01 | Drill / Deepen / Reopen | No Violations | I met with toolpusher and company man to explain when I should be notified. They were anticipating the conductor cemented tonight but could yet not say when as lab techs were out sampling surrounding water wells - there are none within a half mile. They are expecting surface casing to be cemented tomorrow night and I will be on location for it - will not make this Conductor cementing.. Staff meeting tomorrow in Zanesville and another surface cement job tonight anticipated, with the rest of the week filled up with plugging, cementing, and I/O meeting. |
1147647250 | 2015-03-03 | Drill / Deepen / Reopen | No Violations | This is not a production well at this time, as it has not been completed. Upon inspection, it was observed that the well location is stabilized with a vegetative cover. There are no tanks associated with this well. There is no production equipment, either. No ID is posted on the location. I will contact Flat Rock Development LLC and instruct them to post ID. No other violations are present that would prevent Temporary Inactive Status. |
1220176366 | 2014-09-02 | Preliminary Restoration | Violations Noted | Upon inspection, it was observed that a sparse vegetative cover has been established on the majority of the disturbed area, the lease road has been maintained, and the pad area is stabilized with gravel. The southeast slope of the location is developing a slip and is causing erosion. I will contact Mr. Scott Gannon of Flat Rock Development LLC and notify him of the pad erosion issues and recommend that the area be re-seeded and fertilized to encourage better growth. The preliminary restoration cannot be passed until the entirety of the location is stabilized. |
1347563567 | 2012-09-13 | Administrative Inspection | No Violations | |
1347963243 | 2012-09-17 | Drill / Deepen / Reopen | No Violations | I received information that the location had been built and upon inspection, found this to be true. Neither Carl Heinrich, partner, nor Flat Rock seemed aware that they were to give 24 hr. notice before beginning construction. Location appears large enough but the south half built on fill - have a compactor on location and used it on the fill portion, they say. They are now starting to bring in rock and pad will be covered with rock. Road steep getting up to the location. Called Flat Rock and informed them of all the situations that they needed to give 24 hr notice and told them to read their permit. They are new as operators, both in Ohio and WVA. WACO will be the drill company and rig should be in this week. Asked them to call. |
1349696334 | 2012-10-06 | Drill / Deepen / Reopen | No Violations | Called for BOP, cement integrity on surface casing but when arrived, found they were having trouble with BOP - on location about 3 hrs. Told to come back later at night, arrived to find testing crew there but BOP would not test - went for more parts - 5.5 hrs. this time. Finally did test on 10/4 but I was out of hours - overtime denied (Supervisor Chini had scheduled meeting on 10/5/12 for I/O and had to save remaining hours for it - going to this BOP test would have put me on OV for 10/5). Full Circle completed test with a graph and surface/BOP passed test. Will go back to drilling. 10/6 - Rig called Sat. early to say Intermediate will be cemented this day. Cannot witness as out of hours - no OV allowed. During call, operator stated they would be going to 10,500. I told them they could only go to 8500, per the permit and will need to file a correction to the permit before they can go deeper. Steve is concerned they may be at 8500 before Tues. morning - 1st time they can get approval - and I told them they could not drill deeper than 8500. I advised to complete amended form, fax to Columbus and call Steve Opritz for approval 1st thing Tues. morning. |
1350041779 | 2012-10-11 | Drill / Deepen / Reopen | No Violations | I received notification that Columbus has approved new drilling depth of the well to 11,000. |
1350299029 | 2012-10-12 | Drill / Deepen / Reopen | No Violations | My routine inspection found rig at 6560 with drill pipe out of hole - tripping for a bit. |
1351164277 | 2012-10-24 | Drill / Deepen / Reopen | No Violations | I and Pat Shreve arrived on location, expecting to plug back this drill hole for later horizontal well. We found that coil tubing unit had come but could not get down the township road or up on location so drill rig would have to run drill pipe back in hole to set plugs. Nabors Well Services also on site. Plugs include Utica, Clinton/Medina and Big Lime/Marcellus. Waited on location to find out plans - will need to come back tomorrow to set plugs. |
1353258626 | 2012-10-26 | Plug / Plug Back | No Violations | My inspection this day due to plugging back of deeper formations in this well in anticipation of future horizontal well in Marcellus. Set bottom (Utica), Clinton/Medina, and Big Lime plugs and also a kick-off plug at Marcellus using Nabors Well Service and Class A cement. Total time for plugging was 18.5. |
1560432434 | 2019-6-13 0:00: | TI | No Violations | 0.60 |
1592842612 | 2020-6-22 0:00: | PL | No Violations | 0.40 |
1731302331 | 2012-10-24 | Plug / Plug Back | No Violations | Met with Cindy Vandyke on well that was drilled and was being plugged back with a coil tubing unit. The equipment was not able to make it in to location. Nabors was cementing company. They were on site and Waco rig was getting ready to run pipe in to set plugs. |
1826569810 | 2019-10-24 0:00 | TI | No Violations | 1.60 |
1910015179 | 2016-04-06 | Preliminary Restoration | No Violations | Upon inspection, it was observed that the location is currently in compliance with temporary inactive status requirements. Flat Rock Development LLC has submitted plans to justify second year temporary inactive status. I was accompanied on this inspection by Flat Rock Development representative Scott Gannon. |
240630279 | 2016-10-20 0:00 | DD | No Violations | 2.00 |
617804020 | 2014-10-30 0:00 | PL | No Violations | 2.00 |
750023013 | 2020-6-22 0:00: | FR | No Violations | 0.40 |
Inspection ID | Violation ID | Violation Date | Violation Code | Violation Comments |
---|---|---|---|---|
0478613128 | US-OH-125208 | 2012-10-12 | Failure to comply with permit conditions | |
0478613128 | US-OH-125209 | 2012-10-12 | Permit violation | |
1220176366 | US-OH-105896 | 2015-03-10 | Failure to restore within six months |