34-167-29720

Well Details

Well ID: 34-167-29720
Loading map...
Country: United States
State: Ohio
County: Washington
Municipality: Aurelius Township
Operator Name: TRIAD HUNTER LLC
Well Pad ID: US-OH-000695
Farm/Lease Name: FARLEY
License Status: Plugged Back
License Date: 2012-12-27
Spud Date: 2013-03-21
Spud Drilling Contractor: WARREN DRLG
Final Drill Date: 2013-04-01
Well Total Depth:
Configuration: Vertical
Latitude: 39.610000
Longitude: -81.410000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2012-12-27 Proposed Formations:QUEENSTON THRU TRENTON, Issued Date:12/27/2012, Expired Date:12/27/2014 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT
Reached Total Depth 2013-04-01 TD DATE INFERRED FROM PB TO HX PERMIT
Construction Permit Expires 2014-12-27 TD DATE INFERRED FROM PB TO HX PERMIT
Completion Report Received 2015-12-30 TD DATE INFERRED FROM PB TO HX PERMIT
Record Last Modified 2016-01-04 TD DATE INFERRED FROM PB TO HX PERMIT

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2014-01-09 11556 14734 0
11556 14734 0
11556 14734 0

For data sources see[3]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2015 TRIAD HUNTER LLC 0 0 0

For data sources see[4] [5]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2013 TRIAD HUNTER LLC Brine 0 9
2014 TRIAD HUNTER LLC Brine 0 0
2015 TRIAD HUNTER LLC Brine 0 0
2016 TRIAD HUNTER LLC Brine 0 0
2017 TRIAD HUNTER LLC Brine 0 0
2018 TRIAD HUNTER LLC Brine 23910 364
2019 TRIAD HUNTER LLC Brine 3326 90

For data sources see[6] [7]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1129623311 2016-2-11 0:00: PW No Violations 0.30
-1191447157 2013-11-6 0:00: DD No Violations 2.00
-1384978202 2013-10-31 0:00 CT No Violations 2.00
-1403999556 2013-3-22 0:00: DD No Violations 1.00
-164525248 2013-4-30 0:00: DD No Violations 2.50
-1704158172 2013-9-16 0:00: DD No Violations 1.00
-1817955218 2013-4-11 0:00: DD No Violations 2.00
-1826718111 2013-8-20 0:00: DD No Violations 2.50
-1877661487 2016-3-7 0:00:0 AM No Violations 0.10
-1878969603 2018-11-14 0:00 PL No Violations 0.20
-2047931231 2014-9-17 0:00: PL No Violations 0.30
-2113164222 2013-4-10 0:00: DD No Violations
-234890126 2013-6-3 0:00:0 DD No Violations 2.50
-387361190 2013-5-29 0:00: DD No Violations 2.00
-394329441 2013-5-15 0:00: DD No Violations 1.50
-616110485 2013-4-25 0:00: DD No Violations 3.00
-705026121 2014-9-17 0:00: PL No Violations 2.00
-732708247 2013-4-22 0:00: DD No Violations 3.00
-758552216 2013-6-11 0:00: DD No Violations 3.50
-760978502 2013-10-21 0:00 DD No Violations 1.50
-850493660 2013-8-26 0:00: DD No Violations 3.50
-954344370 2013-9-23 0:00: DD No Violations 3.00
0164525248 2013-04-30 Drill / Deepen / Reopen No Violations Drilling rig crew was in the process of drilling out the plug from the intermediate string job. They were having difficulties with it. Picked up cement job paperwork from Mr. Sparky Bare.
0208539936 2013-09-23 Drill / Deepen / Reopen No Violations Witnessed stimulation operations performed on this well. Accompanied by Rick Cisler, Kenny Brown, and Mallory Stanton. One stage and one wireline run was witnessed. A leak off test was also performed.
0234890126 2013-06-03 Drill / Deepen / Reopen No Violations Total depth at the time of inspection was 13603 ft. Inclination was 90.91 degrees. Azimuth was 327.77 degrees. They also have second party gas pressure at 7968 psi. Spoke with consultants on site.
0387361190 2013-05-29 Drill / Deepen / Reopen No Violations Total depth at the time of inspection was 9046 ft. The inclination was 90 degrees and the Azimuth was 326.87 degrees. Spoke with the consultant on site.
0394329441 2013-05-15 Drill / Deepen / Reopen No Violations Status check on drilling rig. Total depth was 7579 ft. Inclination was 16.4 degrees. Azimuth was 335.30 degrees. Spoke with company man Mr. Gordy Huckins.
0486448233 2013-10-15 Drill / Deepen / Reopen No Violations Company was re-perforating stage 8. They are also switching the type of sand they were using as intermediate proppant from 30/50 mesh to 40/70 mesh. Annulus pressure stayed below 15 psi during stimulation operations.
0538042234 2013-04-10 Drill / Deepen / Reopen No Violations Andy Thomas and I went toWarren Drilling Rig 12 on the site for a Pre Spud meeting. Talked about the dangers of drilling Thru Hydrogen Sulfide and water out zones.
0616110485 2013-04-25 Drill / Deepen / Reopen No Violations Hole was being logged before the 9.625 in. pipe was ran. Received pipe tally for the surface pipe and the intermediate string. Drillers depth was 6890 ft. and the loggers depth was 6869 ft. Spoke with Mr. Ray Decker.
0665720553 2013-06-17 Drill / Deepen / Reopen No Violations Picked up paperwork on the 5.5 in casing job. Rig crews were getting ready to tear down and clean the rig. Spoke with Mr. Gordy Huckins on site.
0677998598 2013-05-30 Drill / Deepen / Reopen No Violations Total depth at the time of inspection was 9728 ft. The inclination was 91.54 degrees. The azimuth was 324.54 degrees. Spoke with consultant on site.
0705026121 2014-09-17 Preliminary Restoration No Violations Upon inspection, it was observed that all disturbed land surfaces have been stabilized with a vegetative cover. All drilling equipment has been removed from the location, the lease road has been maintained, any drilling pits have been closed, and the entire location is diked. This fulfills the requirements of the preliminary restoration.
0732708247 2013-04-22 Drill / Deepen / Reopen No Violations Total depth at the time of inspection was 5781 ft. A small amount of H2S gas had been detected on the rig floor, but very quickly dissapated. Spoke with Sparky Bare and Gordy Deer on site.
0758552216 2013-06-11 Drill / Deepen / Reopen No Violations Met with Kenny from Appalachian Oilfield Services. He wanted to make sure that he had met all of the states expectations as far as clean-up after the blowout. The blowout preventer was receiving maintenance at the time of inspection.
0760978502 2013-10-21 Drill / Deepen / Reopen No Violations It was reported to me that 5 stages had been successfully fraced since my last visit on 10/17/13. Consultants were awaiting word from Triad on what to do next. Annular pressure wa at 49 psi at the time of the inspection.
0850493660 2013-08-26 Drill / Deepen / Reopen No Violations Witnessed stimulation activities at this well site with the accompaniment of Mr. Rick Cisler and Mr. Kenny Brown. Annulus pressure continually reached 1000 psi and the company was blowing it down to continue. Company shut down after the stage was finished because the annulus pressure was reaching 1000 psi quicker than before. Received phone call from Mr. Tim Neill at 1:16 pm stating that they were shutting the frac down and going into remedial mode.
0954344370 2013-09-23 Drill / Deepen / Reopen No Violations Witnessed integrity test after the perforations for the 7th stage were shot. It was established that the annulus had direct communication and remedial cement work was needed.
1034156158 2013-10-03 Drill / Deepen / Reopen No Violations Witnessed squeeze job on production casing. Perforations were shot from 13108 ft - 13044 ft and a cement retainer was set at 12995 ft. Circulation was gained and maintained throughout the job. Mr. Tim Neill from Triad, Mr. Ray Scholl, and Mr. Todd Ricks were all on site for the job.
1044273030 2013-11-04 Drill / Deepen / Reopen No Violations Inspected flow back operations in progress. The well was flowing back 44 barrels of water an hour, 4 barrels of oil an hour, and 2422 mcf of gas was being flared. Annulus pressure was at 50 psi.
1105820736 2013-10-08 Drill / Deepen / Reopen No Violations Witnessed the bond log being ran after the 2nd squeeze job on the production string. Cement was tagged at 13386 ft. Accompanied by Mr. Tom Tomastik and Mr. Andrew Adgate. A copy of the log was obtained.
1129623311 2016-02-11 Production Wells No Violations Upon inspection, it was observed that this well is currently shut-in and is awaiting pipeline infrastructure to be completed and open for production. There were no leaks observed and gauges on annular fittings read 0 psi. No violations noted. I was accompanied on this inspection by DOGRM Emergency Response Coordinator Nathan Lane.
1191447157 2013-11-06 Drill / Deepen / Reopen No Violations Checked flow back operation. Well was flowing 40 barrels of water an hour and 3 barrels of water an hour. 5.5 in. casing pressure was around 900 psi and the annulus pressure was 50 psi.
122616716 2020-8-27 0:00: PW No Violations 0.40
1252182311 2013-08-11 Drill / Deepen / Reopen No Violations Witnessed well stimulation activities for this well. The first stage broke down at 7218 psi. Annular pressure was encountered during the fracturing process. Pressure went up to 1098 psi. At that point, the pumps were shut down and the pressure was monitored. It stayed around 900 psi. Then the company blew it down. Company then started to flush and finish the stage. The annular pressure walked up to about 450 psi twice, and was blown down twice. After that, the rate was dropped to 71.1 barrels per minute and the annular pressure stabilized at 422 psi. They then decided to continue the stage and started adding sand. The annular pressure then dropped consistantly after that.
1366028928 2013-04-14 Drill / Deepen / Reopen No Violations When I arrived, the rig crew was pulling drill collars and they were dragging. It took a lot longer to do than the company expected. Then, when they tried to run a log, the tools sat down at 130 ft. The surface casing job was not able to take place.
1366195670 2013-04-15 Drill / Deepen / Reopen No Violations Company was getting materials ready for the installation of the Blowout Preventer. Drilling will re-commence after it is installed.
1369768570 2013-05-21 Drill / Deepen / Reopen No Violations Company was plugging back the lateral that they had drilled so that could kick off again. Good circulation was achieved throughout the job, and drilling mud was circulated out of the hole. I was in contact with Inspector Pat Shreve throughout the the job.
1370536717 2013-06-05 Drill / Deepen / Reopen No Violations

-167-2-9720-01-00 at 7:12 pm. Mr.Harold Roper told me that they had a blowout and a drilling mud spill. When I arrived on location the area around the drilling rig had been cleaned up by scraping off the top layer of aggregate off of the pad. The bulk of the drilling mud was contained in the cellar. It was reported to me that approximately 100 barrels of drilling mud had left the well. There were vacuum trucks and super suckers already on location cleaning up the cellar. The rig crews were also cleaning up the rig using pressure washers and steam jennies. The amount of fluid that made it outside of the drilling pad containment was minimal (less than 1/2 barrel). It was in the form of a mist. It was blown by the wind toward the Southwest corner of the drilling pad. It landed in a 15 foot zone from the edge of the pad in an area 50 foot long. Once again, it was a fine mist and it landed on the grass.


The total measured de

1375819165 2013-08-05 Drill / Deepen / Reopen No Violations Well has frac head installed. There are two sand vats on site from Halliburton. I was accompanied by permitting geologist Rick Cisler, Kenny Brown, and intern Andrew Destocki.
1376931602 2013-08-12 Completion Testing No Violations I witnessed part of 2nd stage of Frac job. Company had Halliburton place 1500 gallons of 7.5%Hydro Chloric acid pumped down at perforations for breakdown. The breakdown pressure was at 4146 psi. Highest annular pressure was at 600 psi. The concentration of the frac gel was not quite right and the job sanded off. The company then decided to flow back and go back into the job which this allowed the 30/50 sand to relax and started again. They were at 2.5lb/gal with the sand concentration and at 3 barrel per minute. With 1334 sacks of 30/50 sand away the rate was at 4.8 barrel /minute. Then at 7 barrel per minute the casing pressure is at 9918 psi. At 2:05 am the rate is at 3.9 barrel per minute at 10,940 psi. The annular pressure is at 334 psi. At 3;35 am pumping at rate 3 barrel / minute and pressure is 7650 psi. Shut down. There is a direct relationship between casing pressure when pumps shut down and annular pressure. Pressure up again to 11,365 psi and 581 psi on annulus. Company shut down Halliburton. Company contact is Chris Kruger.
1377083533 2013-08-12 Administrative Inspection No Violations At 4:00 am I received a phone call from Inspector Pat Shreve. He stated that during well stimulation, they had sanded off. He also stated that the annulus pressure was rising during pumping. At 8:17 am, I called Supervisor Dan Goins and told him of this. He told me to shut the operation down. At 8:25 am, I called Tim Neil, engineer for Triad Hunter, and told him to cease stimulation operations.
1379333654 2013-09-15 Drill / Deepen / Reopen No Violations Witnessed remedial actions performed on this well. Perforations were set at 13996-13994, 13924-13922, 13872-13870 and 13810--
1379421644 2013-09-11 Drill / Deepen / Reopen No Violations Witnessed logging operations performed on this well. They are using a tractor to take the logging tools through the lateral. Spoke with consultants on site. After log was performed, it showed that there was good cement from 13714-13248. 2000 psi of pressure was held on pipe during logging.
1382444438 2013-10-17 Drill / Deepen / Reopen No Violations Witness stimulation operations in progress. Company was working on stage 9 of the frac. Breakdown pressure was 8015 psi. Annular pressure was 32 psi. Spoke with consultants on site.
1384978202 2013-10-31 Completion Testing No Violations My inspection today finds the annular pressure at the well is within acceptable parameters. The well is currently being flowed back after the frac.
1403999556 2013-03-22 Drill / Deepen / Reopen No Violations Inspector Jack Glascock and I arrived just after cement was pumped for the conductor pipe job. Cement had fallen about 30 ft. Company plans to grout the rest. Location is still in the process of being built. Stone was being placed during inspection.
1412711898 2013-10-30 Drill / Deepen / Reopen No Violations Well was flowing water at a rate of 50 barrel per hour. The annulus pressure was at 50 psi. Gas was being flared. Accompanied by Inspector Mike Mitchell.
1514490316 2017-12-28 Completion Testing No Violations Status check inspection to document the well status. The well drilling process was previously completed and 5.5 diameter production casing ran in the well bore. There was problems previously with the production cement job and the 5.5 production casing was attempted to be squeezed with the company reporting a top of cement on the annular of the 5.5 casing at approximately 11,400. The well was previously completed in 250 intervals with 14 stages total completed with a 400 set back from the top of cement. The completion plugs were drilled out and the well flow tested for 2 weeks. There is a solid completion plug set in the 5.5 diameter production casing at 7,000. The company will remove the plug and make a clean out run to bottom and put the well in production. There is 2 other wells on the pad that is being stimulated and all annulis on each well is being monitored electronically. There is flow lines attached to the annulis and running through a choke valve.
1531749242 2018-07-16 Production Wells No Violations Status check inspection found the well now in production. The well is equipped with a lower A section attached to the 13.375 diameter casing string with a riser pipe and both a manual and electronic transducer gauge on the 13.375 well head section, the gauge reads 300 pounds per square inch (psi). The upper B section of the well head has a riser pipe and pressure gauge present monitoring the casing pressure of the 9.625 diameter casing string with 450 psi present on the manual gauge. The 5.5 diameter casing string well head section shows 697 psi and the tubing well head section production flow line shows 450 psi. The well head is equipped with an emergency shut down valve that is controlled both remotely and by multiple electrical emergency shut down sites on the well pad. The well is selling through a sand trap system before entering the gas processing unit followed by a contact tower and glycol heater. The final gas sales point is a Blue Racer midstream sales point on the North side of the well pad. Also present is a production fluid facility consisting of 4 steel construction tanks of 400 barrel fluid volume, the tanks are situated inside a polymer lined steel containment dike area. The company has installed a low pressure vapor recovery system on the production equipment.
1704158172 2013-09-16 Drill / Deepen / Reopen No Violations Spoke with Mr. Tim Neill and Mr. Ben Schmelzer at their office. They stated that Halliburton will be setting up this weekend, and well stimulation will resume on Monday.
1797705723 2013-09-22 Drill / Deepen / Reopen No Violations Witnessed stimulation operations performed on this well. Annular pressure stayed around 340 psi. During the wireline run annulus pressure was 570 psi.
1809358977 2013-04-14 Drill / Deepen / Reopen No Violations Witnessed surface casing job. Good circulation was achieved and good returns were observed. 50% excess was ran so a lot of cement came back. Plug was landed, then company pressured up on pipe to 1523 psi pressure. I held there for 5 minutes.
1812845179 2013-08-12 Completion Testing No Violations Inspector on site at 18:00 Pm to witness the stimulation process. The wire line company set a frac plug @ 14,537 and perfed 48 shots @ 14,506 to 14,308. At 18:30 Pm the frac ball was dropped and chased to bottom with H20 and once seated 2 slugs of 7.5% HCL at a capacity of 800 gallons each was spotted with the pressure and rate gradually increased to a maximum of 8109 psi and 35 barrel per minute with the annular pressure increasing with the pump rate and pressure to 500 psi. At 19:00 Pm the job was shut down due to a leak at the well head. Off site at 20:30 per supervisor Dan Goins.
1817955218 2013-04-11 Drill / Deepen / Reopen No Violations Total depth at the time of inspection was 605. Spoke with Sparky Bare on site. Also spoke with the water testing contractor from AquaSource. Company plans on drilling to 1900 ft. and cementing casing after that.
1826718111 2013-08-20 Drill / Deepen / Reopen No Violations There was no frac crew or equipment on site. I spoke with the consultants on site. They stated that they were awaiting orders from the company.
1877661487 2016-03-07 Administrative Inspection No Violations This permit number is assigned to the vertical borehole of this horizontal well, which was permitted as a stratigraphic test well. The vertical section was plugged back after core sampling to allow for the lateral borehole to be drilled.
1878969603 2018-11-14 Preliminary Restoration No Violations I am on location today to complete the preliminary restoration on this well. The preliminary restoration meets 1509.072(A). There are no violations at this time.
1958088267 2013-07-03 Drill / Deepen / Reopen No Violations Witnessed a bond log and pressure test on the 5.5 casing for this well. The casing held 1000 psi. The bond log showed significant cement loss. Remedial action was discussed with Mr. Ben Smeltzer and Mr. Sparky Bare.
1985898527 2013-10-28 Drill / Deepen / Reopen No Violations Flow back company was rigging up at the time of inspection. Spoke with company men on site. Annulus pressure was at 25 psi. There was a possible 2500 psi on the 5.5 in casing.
2046166879 2013-10-16 Drill / Deepen / Reopen No Violations Witnessed stimulation operations in progress. Company was working on stage 8. Breakdown pressure was 7329 psi, average treating pressure was 9652 psi., and average rate was 18.1 barrels per minute. Annulus pressure was 24 psi.
2047931231 2014-09-17 Preliminary Restoration No Violations Upon inspection, it was observed that all disturbed land surfaces have been stabilized with a vegetative cover. All drilling equipment has been removed from the location, the lease road has been maintained, any drilling pits have been closed, and the entire location is diked. This fulfills the requirements of the preliminary restoration.
2059496277 2013-11-05 Drill / Deepen / Reopen No Violations Flow back operations had stalled. The consultants had shut the well in to let pressure build while unloading water. The pressure on the 5.5 in. casing was at 1634. Annulus pressure was at 55 psi.
2082062273 2013-10-29 Drill / Deepen / Reopen No Violations Inspected flow back operation. The well was flowing water at 50 barrel an hour. The annulus had 50 psi. pressure on it. No gas had been detected yet.
208539936 2013-9-23 0:00: DD No Violations 7.50
2113164222 2013-04-10 Drill / Deepen / Reopen No Violations Attended pre-spud meeting. Accompanied by Inspector Pat Shreve. Pat and I discussed the casing program with Sparky Bare and Tim Neil. We were concerned about having 1900 ft of surface casing. Pat contacted Steve Riley and Steve Opritza. They gave us the go-ahead for the company to proceed.
486448233 2013-10-15 0:00 DD No Violations 3.50
538042234 2013-4-10 0:00: DD No Violations 2.50
665720553 2013-6-17 0:00: DD No Violations 2.00
677998598 2013-5-30 0:00: DD No Violations 2.00

For data sources see[8]