If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-167-29732 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.54,"lon":-81.4,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Washington | |
Municipality: Salem Township | |
Operator Name: EM ENERGY OHIO LLC | |
Well Pad ID: US-OH-000787 | |
Farm/Lease Name: MERLIN | |
License Status: Plugged Back | |
License Date: 2014-05-30 | |
Spud Date: | |
Spud Drilling Contractor: | |
Final Drill Date: 2014-07-13 | |
Well Total Depth: 8290.00 ft | |
Configuration: Vertical | |
Latitude: 39.540000 | |
Longitude: -81.400000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2013-09-04 | Proposed Formations:POINT PLEASANT, Issued Date:9/4/2013, Expired Date:9/4/2015 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class: |
APP | 2013-09-16 | Proposed Formations:TRENTON, Issued Date:9/16/2013, Expired Date:9/16/2015 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT |
APP | 2014-05-30 | Proposed Formations:TRENTON, Issued Date:5/30/2014, Expired Date:5/29/2016 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT |
Reached Total Depth | 2014-07-13 | |
Plugged Back | 2014-07-15 | |
Completion Report Received | 2014-08-29 | |
Construction Permit Expires | 2016-05-29 | |
Record Last Modified | 2017-02-10 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2015-05-07 | 8790 | 15748 | 0 |
8790 | 15748 | 0 | |
8790 | 15748 | 0 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 10/23/2014 | 11/08/2014 | 7985.2 | 14,715,800.0 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Sand (Proppant) | Producers Service Corp | Proppant | Silica Substrate | NA | 100 | 12.369 | 17,513,500.0 |
PRO BREAKER 4 | Producers Service Corp | Breaker | Ethylene Glycol | 107-21-1 | 14 | 0.00002745 | 38.862 | |
Sucrose | 57-50-1 | 46 | 0.00009018 | 127.691 | ||||
PROHIB II | Producers Service Corp | Inhibitor | Methanol | 67-56-1 | 30 | 0.000334438 | 473.537 | |
Dimethylcocoamine, bis(chloroethyl)ether,
diquaternary ammonium salt |
68607-28-3 | 60 | 0.000668876 | 947.074 | ||||
Ethylene Glycol | 107-21-1 | 40 | 0.000445918 | 631.383 | ||||
Propargyl Alcohol | 107-19-7 | 30 | 0.000334438 | 473.537 | ||||
Glycol Ethers | 111-76-2 | 40 | 0.000445918 | 631.383 | ||||
Ethoxylated Nonylphenol | 68412-54-4 | 10 | 0.000111479 | 157.846 | ||||
STIMOIL EN | Producers Service Corp | Surfactant | Citrus Terpenes | 68647-72-3 | 5 | 0.00183325 | 2595.73 | |
Isopropyl Alcohol | 67-63-0 | 30 | 0.0109995 | 15574.4 | ||||
PRO SCALE STOP 2000 | Producers Service Corp | Scale Inhibitor | Organic Phosphate | 71050-62-9 | 25 | 0.00336575 | 4765.62 | |
PRO FR 2000 | Producers Service Corp | Friction Reducer | Alcohols (C12-16) ethoxylated | 68551-12-2 | 3.1 | 0.00003380 | 47.859 | |
Ammonium Chloride | 12125-02-9 | 13 | 0.000141744 | 200.697 | ||||
Petroleum Distallate Hydrotreated Light | 64742-47-8 | 28 | 0.000305294 | 432.271 | ||||
Alcohols (C10-16) ethoxylated | 68002-97-1 | 3.1 | 0.00003380 | 47.859 | ||||
C12-C14 Alcohol Ethoxylated | 68439-50-9 | 3.1 | 0.00003380 | 47.859 | ||||
MB 7530 | Producers Service Corp | Biocide | Sodium Hydroxide | 1310-73-2 | 4 | 0.000608701 | 861.872 | |
Tetrahydro-3, 5-dimethyl-2H-1,3,5-thiadiazine-2-thione | 533-74-4 | 24 | 0.00365221 | 5171.23 | ||||
Water | Company 1 | Carrier/Base Fluid | Water | 7732-18-5 | 100 | 86.7307 | 122,804,000.0 | |
Hydrochloric Acid (15%) | Producers Service Corp | Acidizing | Hydrochloric Acid | 7647-01-0 | 15 | 0.11033 | 156218 | |
XPL-3300 | Producers Service Corp | Friction Reducer | Mineral Oil | 64742-52-5 | 60 | 0.0402567 | 57000.2 | |
PRO GEL 4.0L | Producers Service Corp | Gelling Agent | Nonylphenol, ethoxylated | 9016-45-9 | 5 | 0.00149405 | 2115.46 | |
Guar Gum | 9000-30-0 | 60 | 0.0179286 | 25385.5 | ||||
Distillates petroleum, hydro treated | 64742-47-8 | 65 | 0.0194227 | 27500.9 |
For data sources see[4]
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2015 | EM ENERGY OHIO LLC | Brine | 51074 | 242 |
2016 | EM ENERGY OHIO LLC | Brine | 9784 | 148 |
2017 | EM ENERGY OHIO LLC | Brine | 11842 | 210 |
2018 | EM ENERGY OHIO LLC | Brine | 14239 | 363 |
2019 | EM ENERGY OHIO LLC | Brine | 2316 | 89 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1011780285 | 2015-6-22 0:00: | PL | No Violations | 2.00 |
-1054571489 | 2014-7-2 0:00:0 | AM | No Violations | |
-1481816661 | 2014-6-7 0:00:0 | CS | No Violations | 3.00 |
-1785121632 | 2018-11-27 0:00 | PW | No Violations | 0.50 |
-1827540768 | 2018-10-12 0:00 | PW | No Violations | 1.00 |
-1847159087 | 2014-6-25 0:00: | DD | No Violations | 4.50 |
-1895120456 | 2014-6-25 0:00: | DD | No Violations | 4.00 |
-336825131 | 2014-11-14 0:00 | AM | No Violations | 0.10 |
-404275687 | 2014-11-5 0:00: | AM | No Violations | 0.20 |
-479329132 | 2014-7-15 0:00: | DD | No Violations | 6.00 |
-698353764 | 2019-5-22 0:00: | PW | No Violations | 0.40 |
-713650110 | 2014-10-31 0:00 | AM | No Violations | 0.20 |
-936221291 | 2014-7-28 0:00: | AM | No Violations | 0.20 |
-964922184 | 2014-7-21 0:00: | DD | No Violations | 2.50 |
0170703610 | 2014-06-24 | Casing String Witnessed | No Violations | Witnessed the cementing of the 13.375 intermediate casing. Good circulation was established and kept throughout the job. Halliburton was doing the cement work. Good cement returns were observed at the surface. Wiper plug did not seat. Pressure test on casing will be conducted after cement cures. |
0220647653 | 2014-06-17 | Drill / Deepen / Reopen | No Violations | H&P rig 521 is up over the hole. Drilling has not commenced yet. The 20 in. casing is laid out on the racks. I spoke with company men Mr. Dan Lowther and Mr. Ted Vinita. Company wanted to run 750 ft. of 20 in. surface casing. I told them that that was too deep and they would be drilling through a hydrocarbon bearing zone the Cow Run sandstone. I found two example wells within 1000 feet of where they were going to be drilling. I spoke with Inspector III Pat Shreve, SW Region supervisor Dan Goins, and permitting geologist Kenny Brown. They all agreed that less surface casing should be set. I spoke again with Mr. Dan Lowther and we agreed on less than 500 ft., but more than 300 ft. |
0336825131 | 2014-11-14 | Administrative Inspection | No Violations | Received an email from Mr. Jim Miller of EdgeMarc Energy stating that the post-frac drillout operation was completed this morning and they were in the process of pulling the working string out of the well bore. The production string will be landed tomorrow (11/15/15) and flowback operations will commence this upcoming week. |
0404275687 | 2014-11-05 | Administrative Inspection | No Violations | Spoke over the phone with EM Company Man Mr. Jim Miller at 9:00 am to check the status of stimulation operations at this well. Mr. Miller Stated that the stimulation has went smoothly and they are currently pumping stage 27. |
0479329132 | 2014-07-15 | Drill / Deepen / Reopen | No Violations | Visited this location to witness the plug-back operation in preparation for kick-off into the lateral portion of the well. Halliburton was on location and rigging up for the plug-back job upon my arrival. Circulation was established at 6:30 am and an equivalent mud weight of 12.6 lbs/gal was established. Discrepencies between EdgeMarcs Drilling Engineers cement calculations and Halliburtons calculations caused delays for the plug-back operation. Plug-back had not commenced upon my departure at 11:30 am. |
0682810140 | 2014-07-09 | Administrative Inspection | No Violations | Received call from EM Company Man Dan Lowther at 8:05 am stating that the remedial bradenhead squeeze job was done last night from approximately 9 pm until 3 am. Using Halliburtons cement truck, they were able to establish injection at 800 psi, and the cement was pumped in 1-2 bbl stages until injection pressures rose to nearly 1500 psi, indicating a good squeeze. Mr. Lowther estimated that 9-9.5 bbl of Class A cement was squeezed into the annulus of the 9.625 casing. This amount was sufficient to fill the void where cement was poorly bonded. A bond log will be run on the squeeze job after the balance plug is drilled out and FIT test is run. The squeeze job was not witnessed due to no notification of job commencing. |
0698353764 | 2019-05-22 | Production Wells | No Violations | On this day, I found the site gated with signage at the entrance and surrounded with an earthen berm. There is (1) producing well and (1) gas processing unit. The production facility is located near the gate with an emergency shutdown button, and consists of (4) 400 barrel steel tanks all within containment. Annular pressure monitoring devices are equipped. The 9.625 inch diameter casing has a pressure of 800 pounds per square inch (psi) and the 13.375 inch diameter casing has a pressure of 0 psi. Identification is posted at the wellhead, along with an emergency shutdown button. It will be noted that I spoke with EdgeMarc Company Representative Fritz Oser onsite. |
0713650110 | 2014-10-31 | Administrative Inspection | No Violations | Spoke over the phone with Mr. Jim Miller of EdgeMarc Energy at 8:56 am and inquired about the status of the frac job for this well. Mr. Miller stated that they resumed stimulation activities yesterday and just finished pumping their 10th stage and are displacing the bridge plug down the hole. |
0732714817 | 2013-10-09 | Drill / Deepen / Reopen | No Violations | Attended pre-site building meeting with representatives from EdgeMarc, contractors who will be working on the site, southwest region supervisor Dan Goins, inspector Pat Shreve, and pre-site coordinator Joe Hoerst. |
0855082979 | 2014-07-09 | Drill / Deepen / Reopen | No Violations | Visited location to pick up cement ticket and check on drilling status. EdgeMarc is currently drilling out the balance plug used for the hesitation sqeeze job on the 9.625 casing. An injection test and a mud weight equivalency test will be performed after drilling 10 of formation past the 9.625 casing shoe. If the tests are passed, the sqeeze job will be a confirmed success. If the tests fail, more cement will be sqeezed in. |
0882747502 | 2014-07-24 | Administrative Inspection | No Violations | Received phone call from EdgeMarc Company Man Mr. Zach Gralinski at 12:26 pm. Mr. Gralinski stated that they are currently drilling the lateral and are at 10,200. They are currently drilling with an 8.5 PDC bit at a rate of penetration of 125/hr. Mr. Gralinski also stated that they plan to TD the lateral on 7/28/2014 and will then trip-out their bottom hole assembly and run the 5.5 production casing. The cement job for the 5.5 casing is predicted to commence on 7/30/2014. |
0936221291 | 2014-07-28 | Administrative Inspection | No Violations | Spoke with EdgeMarc Company Man Mr. Zach Gralinski via phone call at 12:33 pm. Mr. Gralinski stated that they have reached TD on their lateral and are currently running 5.5 production casing. They are currently expecting to be able to cement the production casing early on 7/30/2014. |
0954452710 | 2014-10-23 | Drill / Deepen / Reopen | No Violations | On location at 9:00 am to witness first stage of stimulation for this well. Producers Service Corp. is the stimulation contractor on this job. Pumping of the first stage commenced at 8:50 am and is being done using a toe sleeve from Team Oil Tools. Pumping rates were gradually increased from 65 bbl/min up to 88 bbl/min and well head pressure was kept below 9500 psi. Witnessed the pumping of acid, pad, 100 mesh, 40/70 mesh, and 30/50 mesh sand to bottom. The remaining 37 stages of the stimulation will be done with the perf and plug method. |
0959118602 | 2014-06-21 | Casing String Witnessed | No Violations | Witnessed the cementing of the surface casing string. Good circulation and good returns were observed at the surface. I tested the mix water and on a low range Quantab it tested at 2.2 which represents 57 parts per million chloride. The pipe will be pressure tested after the cement cures. |
0964922184 | 2014-07-21 | Drill / Deepen / Reopen | No Violations | Visited this location to check the status of horizontal drilling activities. EdgeMarc Company Man Zach Gralinski stated that they are still drilling on the balanced plug and established a kick-off point of 7240. The bit depth was at 7263 upon arrival and the curve was beginning to be built. Mud-weight iwas 12.5 lbs/gal and the mud return samples were yielding 50/50 mix of cement and formation cuttings. Rig will continue to drill at a rate of penetration of 5/hr until it is no longer drilling out cement. |
1011780285 | 2015-06-22 | Preliminary Restoration | No Violations | Upon inspection, it was observed that all drilling equipment has been removed from the location, the lease road has been maintained, and a vegetative cover has been established on all areas within the original LOD. Erosion controls are in place below all drainage/sump effluents. An earthen containment berm is in place around the perimeter of the location. Preliminary restoration passed 6/22/2015. This inspection also served as a production inspection. The well is equipped with a production tree and is producing on the 5.5 production casing. A pressure gauge on the 5.5 casing read 3300 psi. The tank battery for the well consists of 4 400 bbl production tanks, 2 for produce brine, and 2 for oil/condensate. The tanks sit within a metal containment dike with a poly liner. There is a large flow control separator 50 from the tank battery. Legible and correct ID information is present at the tank battery as well as the front of the location lease road. No violations were observed. |
1054571489 | 2014-07-02 | Administrative Inspection | No Violations | Spoke with EdgeMarc Daytime Company Man Dan Lowther at 7:06 am and he stated that they reached the Queenston Shale at 7200, which is 400 deeper than they originally projected (6800). They will have to bring in more joints of 9.625 casing to cover the difference. Mr. Lowther also stated that they are going to load the well bore with 10 lb/gal brine to cover up the H2S-bearing Lockport Dolomite (encountered at approx. 5850) while they wait for more 9.625 casing to arrive. |
1235775753 | 2014-07-07 | Drill / Deepen / Reopen | No Violations | Visited location to witness remedial cementing activites on the 1st stage of the 9.625 casing/cement job. EdgeMarc ran a Halliburton cement retainer tool to 7050. 20 bbl of cement slurry was spotted at 200 above end of drill pipe (approx. 7000) to be pumped in through a stinger tool on the end of the drill pipe. Halliburton circulated fresh water through the stinger tool to keep the cement retainer clear as they stung-in to begin squeezing cement. As Halliburton began pumping, the pressure rose to 2000 psi almost immediately, and they shut down. EdgeMarc stung-out of the cement retainer and re-circulated on it to get stung-in again. The second attempt also failed. A third attempt was made after rotating the stinger tool an an additional 20 rotations to ensure it was opened properly. The third attempt also failed. The cause of the immediate pressure- up could either be faulty tools or very tight formation. EdgeMarc will run a casing test while the cement retainer and stinger tool are still down hole, then will drill the tools out and attempt to perform a bradenhead squeeze. |
1243234118 | 2014-08-04 | Drill / Deepen / Reopen | No Violations | Visited this location to pick up casing tally and cement ticket from 5.5 production casing job. The HP FlexRig 521 was being rigged down and hauled off of the location. |
1402346966 | 2014-06-09 | Casing String Witnessed | No Violations | Witnessed the cementing of the conductor casing. 64 ft. of 26 in. casing was ran in 64 ft. of 36 in. hole. Good circulation and returns were observed at the surface. Spoke with company man Mr. Richard Harrison on site. |
1403292836 | 2014-06-20 | Drill / Deepen / Reopen | No Violations | Halliburton cementing crew on site at 1320 hours. 20 surface casing began being run at 1645 hours. Inspector Andy Thomas completed this surface casing job. |
1403805681 | 2014-06-26 | Drill / Deepen / Reopen | No Violations | Witnessed the pressure testing of the 13.385 intermediate casing. Specialty Pressure Testing LLC pressured-up the casing to 1000 psi at 5:30 am and the pressure stayed at 1000 psi for the duration of the required 30 minute test period. The pressure was relieved from the casing at 6:10 am. |
1404242791 | 2014-07-01 | Drill / Deepen / Reopen | No Violations | Visited this site to observe drilling activities and receive a report about drilling status. EdgeMarc drilled to 5500 with a 12.25 tri-cone bit and switched over to a 12 hammer and are now drilling on air until they are through the H2S-bearing Lockport Dolomite. The hammer was at 5932 upon my arrival. The rate of penetration is averaging 90-100/hr. Mr. Lowther stated that TD for the 9.625 intermediate casing should be hit within 24 hours. |
1404746797 | 2014-07-07 | Drill / Deepen / Reopen | No Violations | Visited location to pick up cement ticket for 9.625 casing/cement job and to check on status. Day Company Man Mr. Dan Lowther stated that Renegade Services ran a cement bond log this morning and found that the first stage of the cement job for the 9.625 casing established a poor bond from 6890 to down to 7215. Cement retaining tools were being tripped-in slowly upon arrival. Sqeeze job will be performed later this afternoon/evening. |
1414531589 | 2014-10-27 | Drill / Deepen / Reopen | No Violations | Arrived on location at 9:00 am to check status of stimulation activities for this well. Mr. Jim Miller of EdgeMarc Energy stated that they got screened out 98% of the way through stage 6. They are currently waiting on a coiled tubing unit to arrive and clean the excess sand out of the well bore. A cleanout run, a plug run, and a perforating run will have to be done before the frac can continue. The frac will likely resume on the 7th stage on Thursday. |
1481816661 | 2014-06-07 | Casing String Witnessed | No Violations | Witnessed the running of the conductor casing. 64 ft. of 36 in. hole was drilled. Sufficient bedrock was drilled into at that depth. The driller brought a core out of the hole. I spoke with Soutwest region Supervisor Dan Goins and Inspector III Pat Shreve about this. 64 ft. of 26 in. casing was ran. They couldnt get cementers on site today. It will be cemented on Monday 06/09/14. |
170703610 | 2014-6-24 0:00: | CS | No Violations | 6.00 |
1712044408 | 2014-07-03 | Drill / Deepen / Reopen | No Violations | 5:30 am: Arrived on location to witness the 2-stage cementing of the 9.625 intermediate casing. Upon arrival, EdgeMarc had not yet landed their 9.625 casing in the well head. They attempted to wash the casing down using a 60/40 mixture of 3% KCl and 10 lb/gal brine water. During this attempt, the well bore began to pressure up quickly, reaching 600 psi, and the reasons were unknown. EdgeMarc decided to pull their landing joint and top joint of casing to use a shorter 20 pup joint and landing joint to make landing easier. Left location at 9:30 am to perform other work around the area.
4:00 pm: Arrived back on location to make another attempt to witness 2-stage cementing job. The 9.625 casing had been landed upon arrival. In stage 1, HOWCO ran 5 bbl. Fresh water to load lines and a 50 bbl. Gel spacer ahead of the 330 sks. Of Varicem cement, and displaced the cement with 532 bbl. Of freshwater. Displacement returns were seen at the surface throughout the entirety of the job. After landing the wiper plug, HOWCO bumped the plug and pressured up to 500 psi above final pumping pressure. The casing held 1118 psi for 5 minutes (9:25-9:30 pm) with 0% bleed--6 hours. |
1777621325 | 2013-10-09 | Drill / Deepen / Reopen | No Violations | A presite meeting was performed on the day that ODNR was at site with EdgeMark. |
1785121632 | 2018-11-27 | Production Wells | No Violations | On this day, I am accompanied by ODNR Southwest Supervisor Eric Conrad. The site consists of (1) producing well and (1) gas processing unit on a gated pad within an earthen dike. The production facility is located near the gate with an electronic shutdown button, and consists of (4) 400 barrel steel tanks all within containment. Annular pressure monitoring devices are not easily accessible on the wellhead for proper monitoring. Identification is posted at the wellhead, along with an electronic shutdown button. The company will be contacted to address the placement of the annular pressure monitoring devices. |
1827540768 | 2018-10-12 | Production Wells | No Violations | The location is surrounded by chain link fence and I was unable to gain access. I walked the perimeter of location. I will direct staff to return once the combination to the lock at the gate is obtained. |
1847159087 | 2014-06-25 | Drill / Deepen / Reopen | No Violations | Accompanied Inspector Andy Thomas to this well location to observe drilling activities. Witnessed the pressure testing of the weld between the 20 surface casing and the well head. The well head was pressured up to 850 p.s.i. for a duration of 15 minutes. The well head did not lose any pressure during the 15 minute test. |
1895120456 | 2014-06-25 | Drill / Deepen / Reopen | No Violations | Witnessed well head pressure test. It held 850 psi. for 15 minutes. I also took the opportunity to get Inspector LJ Parkins familiarized with the drilling rig. |
2125556249 | 2014-07-05 | Administrative Inspection | No Violations | Spoke with EdgeMarc Daytime Company Man Mr. Dan Lowther at 6:29 am via telephone call. He stated that stage 2 of the 9.625 cement job lost returns to the surface at 339 bbl into displacement. The plug was bumped and casing held 500 psi above final pumping pressure for 5 minutes with no bleed-off. Vaughan Energy Services ran a subsurface temperature log in an attempt to locate top of cement and saw a 5 degree temperature spike from 84 to 89 degrees at approx. 2050. Mr. Lowther also informed me that they plan to drill out the stage cementing tool to clear the well bore for a bond log to look at the cement bond and further confirm top of cement. At the time of this phone call, no remedial cementing had been deemed necessary. |
220647653 | 2014-6-17 0:00: | DD | No Violations | 4.50 |
682810140 | 2014-7-9 0:00:0 | AM | No Violations | 0.50 |
732714817 | 2013-10-9 0:00: | DD | No Violations | 4.00 |
855082979 | 2014-7-9 0:00:0 | DD | No Violations | 2.00 |
882747502 | 2014-7-24 0:00: | AM | No Violations | 0.10 |
954452710 | 2014-10-23 0:00 | DD | No Violations | 4.00 |
959118602 | 2014-6-21 0:00: | CS | No Violations | 5.50 |
For data sources see[7]