If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-167-66545 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.49,"lon":-81.17,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Washington | |
Municipality: Grandview Township | |
Operator Name: PD VALENTINE OIL & GAS LLC | |
Well Pad ID: | |
Farm/Lease Name: POOL | |
License Status: Producing | |
License Date: | |
Spud Date: 1900-01-01 | |
Spud Drilling Contractor: | |
Final Drill Date: | |
Well Total Depth: | |
Configuration: Vertical | |
Latitude: 39.490000 | |
Longitude: -81.170000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
Well Added to System | 2013-04-03 | WELL WAS ADDED TO SYSTEM ON 4/3/2013 8:14:56 AM |
Change of Owner | 2013-11-27 | Operator changed from 9998, HISTORIC OWNER to 4784, YODER DARRELL dba DOUBLE "D". WELL TRANSFERRED PER OWNERSHIP AFFIDAVIT. WELLS ASSIGNED BY INSPECTOR. SEE FILE FOR DOCUMENTATION. |
Change of Owner | 2014-11-28 | Operator changed from 4784, YODER DARRELL dba DOUBLE "D" to 9392, DOUBLE D OIL AND GAS LLC |
Change of Owner | 2018-03-12 | Operator changed from 9392, DOUBLE D OIL AND GAS LLC to 6151, P & D VALENTINE OIL CO |
Change of Owner | 2018-12-19 | Operator changed from 6151, P & D VALENTINE OIL CO to 10284, P D VALENTINE OIL & GAS LLC |
Record Last Modified | 2018-12-19 |
For data sources see[2]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2014 | DOUBLE D OIL AND GAS LLC | 24.00 | 12.00 | 365 |
2015 | DOUBLE D OIL AND GAS LLC | 42.00 | 28.00 | 365 |
2016 | DOUBLE D OIL AND GAS LLC | 30.00 | 0.00 | 182 |
2018 | P & D VALENTINE OIL CO | 0.00 | 21.00 | 246 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2012 | YODER DARRELL dba DOUBLE "D" | Brine | 0 | 366 |
2013 | YODER DARRELL dba DOUBLE "D" | Brine | 0 | 365 |
2014 | DOUBLE D OIL AND GAS LLC | Brine | 0 | 365 |
2015 | DOUBLE D OIL AND GAS LLC | Brine | 3 | 365 |
2016 | DOUBLE D OIL AND GAS LLC | Brine | 0 | 182 |
2018 | P & D VALENTINE OIL CO | Brine | 0 | 246 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1368418305 | 2018-6-27 0:00: | PW | No Violations | 1.80 |
-1576612830 | 2013-4-2 0:00:0 | PW | No Violations | 1.00 |
1149117149 | 2018-08-21 | Production Wells | No Violations | On this day, I am conducting a compliance notice follow-up inspection. The issue is not resolved. The chloride levels within the dike area are still testing over 500 parts per million chlorides with a High Range Quantab. Remediation work still needs to be conducted to keep the dike free of any production fluids. Additionally, there is a PVC drain with a riser pipe installed through the dike, that will need to remain water tight, in order to prevent any type of fluid release. An attempt to contact Paul Valentine was made on 08/22/2018 at 8:10 am, and left a voicemail. I spoke with Paul Valentine on 8/23/2018 and explained the issue that still needs to be addressed. |
1368418305 | 2018-06-27 | Production Wells | Violations Noted | I received an e-mail from Inspector Cynthia Van Dyke that she had received a message from Karen Yoder that it appears there was some kind of spill in the tank battery for this well. I arrived on location at 8 AM on 6/27/18 and found the tank battery described in the e- |
1533129058 | 2018-08-01 | Production Wells | No Violations | On this day, I am conducting a compliance notice follow-up inspection per request of Southwest Supervisor Eric Conrad. A noticeable attempt of remediation has been conducted, with the initial stages of green vegetation beginning to re-establish along the hillside. The area within the dike appears to have some standing fluid and was tested with a High Range Quantab resulting in 900+ parts per million chlorides. The owner shall address the issue within the dike before the violation will be passed. The well is equipped with 2.375 inch diameter tubing and 1 inch diameter vent packer with the production valves open. It is produced by means of a pumping unit with rods and a gas engine. I spoke with Rob Armstrong and John Thompson during the inspection. Pictures were taken during the inspection. An attempt to contact Paul Valentine was made 08/01/2018 at 11:32am with no answer, and voicemail requesting a callback. Received callback, and spoke with Paul at 4:00pm 08/01/2018, and requested him to address the high chloride issue within the dike. |
1576612830 | 2013-04-02 | Production Wells | No Violations | Owner of wells, Darrell Yoder going by Double D, requested permit numbers for these 3 wells around his house. This well has pumping unit, tank is located on next road over, diked with another tank. Jason, pumper, says he will have identification up as soon as he gets numbers. I called 4/8/2013 and gave numbers to him. |
2005525996 | 2018-09-04 | Production Wells | No Violations | On this day, I am conducting a compliance notice follow-up inspection in regard to the pollution and contamination issue cited on 06/27/18. The issue is resolved. Vegetation is re-establishing along the hillside and the standing fluid is no longer present within the dike. A voicemail from Paul Valentine on 09/04/2018 indicated that he will be spreading new soil within the dike area. It will be noted that I spoke with Southeast Supervisor Eric Conrad about the issue. |
Inspection ID | Violation ID | Violation Date | Violation Code | Violation Comments |
---|---|---|---|---|
1368418305 | US-OH-110858 | 2018-06-27 | 9-1-07 | Well operation causing pollution and contamination |
For data sources see[7]