If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-169-21579 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.8,"lon":-81.82,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Wayne | |
Municipality: East Union Township | |
Operator Name: PONDEROSA CONSULTING SERVICES | |
Well Pad ID: | |
Farm/Lease Name: MARTHEY THOMAS | |
License Status: Final Restoration | |
License Date: 2004-09-03 | |
Spud Date: 1969-11-15 | |
Spud Drilling Contractor: | |
Final Drill Date: 1969-12-12 | |
Well Total Depth: 3725.00 ft | |
Configuration: Vertical | |
Latitude: 40.800000 | |
Longitude: -81.820000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
CO | 1969-11-13 | 2200 SMITH MANAGEMENT INC GeoDate 11/13/69 |
Original Spud | 1969-11-15 | |
Completed | 1969-12-12 | |
Reached Total Depth | 1969-12-12 | |
CO | 1993-04-20 | 2180 PONDEROSA CONSULT SER INC GeoDate 11/13/69 |
APP | 2004-09-03 | Proposed Formations:CLINTON, Issued Date:9/3/2004, Expired Date:9/3/2005 6:00:00 AM, Drilling unit acres:62, Proposed Well Type:OG, Proposed Well Class: |
Plugged/Abandoned | 2004-12-09 | |
Construction Permit Expires | 2005-09-03 | |
Record Last Modified | 2013-04-25 |
For data sources see[2]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 2000 Bbl | 0 |
For data sources see[3]
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1281877502 | 2004-12-7 0:00: | PB | No Violations | 1.00 |
-156536999 | 2004-11-30 0:00 | PB | No Violations | 4.70 |
-879902165 | 2004-12-3 0:00: | PB | No Violations | 1.50 |
0156536999 | 2004-11-30 | Plug / Plug Back | No Violations | Arrive to set bottom plug .Found that tubing was stuck in hole and Omega circulated on well and worked pipe up and down and was able to pull two joints and set bottom plug. |
0250527825 | 2004-12-06 | Plug / Plug Back | No Violations | Check on plug status for today and found that jacks did not make it in early as was thought . |
0798645851 | 2004-12-08 | Plug / Plug Back | No Violations | Jacks arrived and took awhile to set up .Then after jacking the 8 inch popped off at 20 ft. Next screwed back into casing and tightened up on threads. Then went back to jacking and casing parted at 20 ft. again.Set Berea plug at 980 to 670 ft. and 150 to o ft. |
0879902165 | 2004-12-03 | Plug / Plug Back | No Violations | Check on plug status and found that operator is waiting on a set of jacks to try and pull 8 inch.Tools are scheduled for Tuesday.Went to Omegas yard and found that they are scheduled for Tues. |
0996968614 | 2004-12-01 | Plug / Plug Back | No Violations | Rip casing at 2530 ft. and pull 1 joint.Had problem with circulation proir to setting plug.Had over 1300 psi and had to work csing up and down,then got casing stuck .Had to wait on water truck to bring more water to circulate and then set plugs.Set lime plug and then had to wait while casing was pulled and weld collar on 8 inch so it could be pulled. |
1104864528 | 2004-12-09 | Plug / Plug Back | No Violations | Ran 31 jts tubing in hole to 980 ft. and set Berea plug from 980 to 670 ft. Set last plug from 150 to 0 ft. Had problem with circulation of last 20ft. And after setting top plug it dropped from surface to 40 ft..Then let cement set for 45 minutes and mixed another plug and let it remain at surface. |
1213892258 | 2005-01-12 | Plug / Plug Back | No Violations | Check on plugged well for leaks or pits.Pits are closed and found no leaks. |
1281877502 | 2004-12-07 | Plug / Plug Back | No Violations | Check on plug status and found that they are not plugging today because it has rained too much. |
1616455983 | 2004-12-02 | Plug / Plug Back | No Violations | W/o rip tool and it could not make it today.W/O shot truck and after time to arrive it called and cancelled for today. |
1638340724 | 2007-01-11 | Final Restoration | No Violations | Meets requirements for restoration final . |
250527825 | 2004-12-6 0:00: | PB | No Violations | 1.00 |
798645851 | 2004-12-8 0:00: | PB | No Violations | 4.50 |
996968614 | 2004-12-1 0:00: | PB | No Violations | 5.00 |
For data sources see[8]